Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.26
no.7
/
pp.70-76
/
2012
In general, the unidirectional power flow is normal in distribution feeders before activation of distributed power source such as PV. However, the interactive power flow is likely to occur in case of the power system under distributed generation. This interactive power flow can cause an unexpected effect on convectional protection coordination systems designed based only on the unidirectional power flow system. When the power line system encounters a problem, the interactive power flow can be a contributed current source and this makes the fault current bigger or smaller compared to the unidirectional case. The effect of interactive power flow is varied depending on the location of the point to ground fault, relative location of the PV, and connection method. Therefore it is important to analyse characteristics of fault current and interactive flow for various transformer connection and location of the PV. This paper proposes a method of improved protection coordination which can be adopted in the protective device for customers in distribution feeders interconnected with the PV. The proposed method is simulated and analysed using PSCAD/EMTDC under various conditions.
This paper describes the development of a new islanding detection method for inverter-based distributed generation systems, which uses a signal cross-correlation scheme between the injected reactive current and the power frequency deviation. The proposed method injects 1% of the reactive current to the rated current which brings about a negligible degradation of the power quality. It discriminates the islanding state, when the calculated cross-correlation index is larger than 0.5. The operational feasibility was verified through computer simulations with PSCAD/EMTDC software and experimental research with a hardware prototype. The proposed method can detect the islanding state without degrading the power quality at the point of common connection. Further study is required to overcome the cancellation of the injected reactive current from multiple distributed generation units interconnected with the utility grid.
Journal of the Korea Institute of Information Security & Cryptology
/
v.26
no.2
/
pp.425-433
/
2016
In smart grid, enhancement of efficiency and interoperability of electric power system is achieved through the connection with outer network, and this induces that power grid system is threatened increasingly, becomes the main target of cyber terrorism, and is sincerely required to design the secure power system. Although SSDLC(Secure System Development Life Cycle) is used for risk management from the design phase, traditional development life cycle is somewhat limited for satisfaction of information security indicator of power control system. Despite that power control system should reflect control entities of information security considering its own characteristics, validation elements are insufficient to apply into real tasks based on existing compliance. To make design of diagnostic model and assessment process for power control system possible and to give a direction for information security and present related indicator, we propose the new risk management framework of power control system which is applied operational security controls and standard architecture presented by IEC 62351 TC 57 with enterprise risk management framework.
The purpose of this study is to propose a standard of converting 3D shape of men in twenties to 2D patterns. This can be a basis for scientific and automatic pattern making for high quality custom clothes. Firstly, representative 3D body shape of men was modeled. Then the 3D model was divided into 3 shells, front, side and back. Among them, the front shell was divided into 4 blocks by bust line and princess line. Secondly, curves are generated on each block according to matrix combination by grid method. Then triangles were developed into 2D pieces by reflecting the 3D curve length. The grid was arranged to maintain outer curve length. Next, the area of developed pieces and block were calculated and difference ratio between the block area and the developed pieces' area is calculated. Also, area difference ratio by the number of triangles is calculated. The difference ratio was represented as graphs and optimal section is selected by the shape of graphs. The optimal matrix was set considering connection with other blocks. Curves of torso upper front shell were regenerated by the optimal matrix and developed into pieces. We validated it's suitability by comparing difference ratio between the block area and the developed pieces' area of optimal section. The results showed that there was no significant difference between block area and the pieces' area developed by optimal matrix. The optimal matrix for 2D developing could be characterized as two types according to block's shape characteristics, one is affected by triangle number, the other is affected by number of raws more than columns. Through this study, both the 2D pattern developing from 3D body shape and 3D modeling from 2D pattern is possible, so it's standardization also possible.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.8
/
pp.18-25
/
2008
The paper presents a modeling of the grid-connected wind turbine generation system on MATLAB/Simulink and aims to perform simulations for analysis of the system's characteristics. It performs a pitch regulation for control of the wind generator's output with respect to wind speed variation, and presents a relationship between interconnecting transformer's connections and fault current by reviewing the variations of fault current according to transformer connections in a grid-connected wind power generation system. It also investigates the effect of grounding methods of the interconnecting transformer's neutral point on fault current variations. The simulation results show the differences of fault currents, voltages and generator's characteristics for a line-to-ground fault according to interconnecting transformer's four different connections, and the differences of fault currents of the system according to grounding methods of the transformer neutral point. Therefore, the case studies demonstrate the effectiveness of the proposed simulation model on Simulink.
Journal of the Korea institute for structural maintenance and inspection
/
v.17
no.4
/
pp.38-47
/
2013
For the joint connection of the precast steel grid composite decks, the prefabricated joint which is composed of concrete shear key and high-tension bolts was already proposed. In this study, for the purpose of increasing the bending stiffness and bending strength of the proposed prefabricated joint section details of the proposed joint are modified, and through experimental tests the bending performance, such as stiffness and strength of a modified joint, is compared with those of the proposed joint. Test and analysis results show that the shear cracks in the concrete shear key are clearly reduced by the strengthening of the shear key using shear studs and additional rebars. According to analysis results of the moment-curvature relationship, bending stiffness of the modified joint is about 47% greater than the stiffness of the proposed joint. Furthermore, the modified joint has about 32% greater bending strength than the proposed joint. Compared to specimens without the joint the modified joint has same or slightly higher bending strength, but about 37% lower bending stiffness.
The Journal of the Korea institute of electronic communication sciences
/
v.19
no.1
/
pp.53-64
/
2024
The Yeongnam southeastern region, with Ulsan as its focal point, is planning large-scale floating offshore wind power projects. Additionally, due to the establishment of new nuclear power plants and the extension of existing ones, there is a demand for the expansion of the power grid. The government has announced plans to establish a new power grid for this region as part of the 10th power supply plan. However, there are anticipated challenges in the actual construction phase, primarily because of the presence of national parks and cultural heritage protection zones near Gyeongju. As a result, this study presents an alternative approach that minimizes the creation of new power lines by utilizing existing ones. Using the Power System Simulator for Engineers (PSS/E), an analysis of transient stability was conducted and demonstrated its feasibility.
Journal of the Korea Academia-Industrial cooperation Society
/
v.11
no.8
/
pp.2968-2974
/
2010
Nowadays, the PV systems have been focused on the grid connection between the power source and the grid. The PV inverter can be considered as the core of the whole system because of an important role in the grid-interfacing operation. An important issue in the inverter control is the load current regulation. In the literature, Proportional Integral (PI) controller, which is normally used in the current-controlled Voltage Source Inverter (VSI), cannot be a satisfactory controller for an AC system because of the steady-sate error and the poor disturbance rejection, especially in high-frequency range. Compared with conventional PI controller, Proportional Resonant (PR) controller can introduce an infinite gain at the fundamental frequency of the AC source; hence it can achieve the zero steady-state error without requiring the complex transformation and the de-coupling technique. Theoretical analyses of both PI and PR controller are presented and verified by simulation and experiment. Both controller are implemented in a 32-bit fixed-point TMS320F2812 DSP processor and evaluated on a 3kW experimental prototype PV Power Conditioning System (PCS). Simulation and experimental results are shown to verify the controller performances.
As the number of skyscrapers in micro water grid units such as green building and smart building is increasing in the world, the green building certification system is being implemented to solve problems such as increased demand for water resources and energy. However, researches on the use of sustainable water resources like water reuse and water conservation through linkage and continuous use of water resources, while the power and energy sectors are actively conducting R&D projects in the green building certification system on the micro water grid level. Therefore, this paper analyzes the characteristics and limitations of the water resources sector for the continuous utilization of multiple water sources in the green building certification system, due to the inadequate consideration of sustainability. Then investigates whether various water resources such as constants, nature, and alternative water resources are continuously used in and out of the green building or smart building and complex in the micro water grid unit to suggest evaluation methods and performance evaluation standards.
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.13
no.6
/
pp.590-596
/
2020
In the island areas where system connection with the commercial power grid is difficult, it is quite important to find a method to efficiently manage energy produced with independent microgrids. In this paper, a prosumer management system for P2P power transaction was realized through the testing the power meter and the response rate of the collected data for the power produced in the small-scale microgrids in which hybrid models of solar power and wind power were implemented. The power network of the microgrid prosumer was composed of mesh structure and the P2P power transaction was tested through the power meter and DC power transmitter in the off-grid sites which were independently constructed in three places. The measurement values of the power meter showed significant results of voltage (average): 380V + 0.9V, current (average): + 0.01A, power: 1000W (-1W) with an error range within ±1%. Stabilization of the server was also confirmed with the response rate of 0.32 sec. for the main screen, 2.61 sec. for the cumulative power generation, and 0.11 sec for the power transaction through the transmission of 50 data in real time. Therefore, the proposed system was validated as a P2P power transaction system that can be used as an independent network without transmitted by Korea Electric Power Corporation (KEPCO).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.