• Title/Summary/Keyword: Grid connected PV system

Search Result 234, Processing Time 0.026 seconds

ESS Connected PV Monitoring System Supporting Redundant Communications (통신 이중화를 지원하는 ESS연계 태양광 모니터링 시스템)

  • Joo, Jong-Yul;Lee, Young-Jae;Oh, Jae-Chul
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.13 no.1
    • /
    • pp.29-34
    • /
    • 2018
  • The systems associated with the ESS never stop. It runs 24 hours everyday. The system must be managed to run. The ESS system should perform normally even if the power IT equipment fails or communication failure occurs. Therefore, there is a need for a system that actively addresses, manages and controls the high precision power data of the ESS, even if a variety of failures occur. I would like to propose a power management communication unit to cope with the occurrence of communication failure. This paper also includes an integrated management system that can perform micro grid site management, maintenance and monitoring for the ESS system connected with the solar power generation facility.

Commercial Technology Development of Solar Cell and Grid Connected 3kW PV System for PV House Supply (주택보급형 태양전지 양산기술 및 계통연계 3kW 태양광 시스템 상용화 기술개발)

  • Lee, Park-Il;Mun, Sang-Jin;Yun, Jong-Ho;Kim, Heung-Geun;Yu, Gwon-Jong;Yun, Tae-Yeong;Kim, Sin-Seop;Bae, Sang-Sun;Lee, Jun-Sin
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2005.11a
    • /
    • pp.151-164
    • /
    • 2005
  • 태양전지는 요구전력의 필요에 따라 직 병렬로 연결하여 태양전지 모듈(solar cell module)로 제품화한다. 태양전지가 실제로 전자제품에 연결해서 사용하기 위해서는 주변장치(BOS, Balance of System)가 사용된다. 또한 일사량의 강도에 따라 불균일한 직류전기가 발생되므로, 태양광발전시스템은 모듈을 직 병렬로 연결한 태양전지 어레이(solar cell array)와 안정된 전기공급을 위한 전력조정기(power conditioning system, 이하 PCS)가 필요하다. 또한 직류가 아닌 교류를 필요로 하는 응용제품에는 직 교류변환장치 인버터(inverter)를 필요로 한다. 본 과제는 전시를 위한 연구개발 목적보다는 태양광 시스템 보급 양산기술에 중심을 두어 태양광 산업경제를 활성화 하고자한다. 따라서 본 과제는 기존에 연구개발과 특수목적 시장 중심인 초고효율 태양전지 개발보다 경제적인 기여도와 파급효과가 크다.

  • PDF

High frequency Linked Grid-Connected PV System for Residential Use (고주파링크 방식의 계통연계형 태양광발전시스템)

  • Jung, Y.S.;Yu, G.J.;Lee, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07b
    • /
    • pp.1281-1283
    • /
    • 2001
  • An investigation into power conditioners that interface with photovoltaic array and utilities has been completed. The rating for this investigation is residential system(3-5kW) that interface with a 220V single phase utility connection. As the result of this investigation, a 3kW high frequency PWM IGBT inverter feeding a high frequency isolation transformer with a sinusoidal current wave was selected. The output of the transformer rectified with a diode bridge rectifier four IGBT, used as 60Hz switched, reverse the polarity of the rectified current on every other half cycle of the utility voltage. Even though the high frequency link system used more power semiconductors a net size, weight, and parts cost saying result compared to the other systems due to elimination of 60Hz transformer.

  • PDF

High frequency Linked Grid-Connected PV System for Residential Use (고주파링크 방식을 이용한 계통연계형 태양광발전시스템)

  • Jung, Y.S.;Yu, G.J.;Lee, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.467-469
    • /
    • 2001
  • An investigation into power conditioners that interface with photovoltaic array and utilities has been completed. The rating for this investigation is residential system(3-5kW) that interface with a 220V single phase utility connection. As the result of this investigation, a 3kW high frequency PWM IGBT inverter feeding a high frequency isolation transformer with a sinusoidal current wave was selected. The output of the transformer rectified with a diode bridge rectifier, four IGBT, used as 60Hz switched, reverse the polarity of the rectified current on every other half cycle of the utility voltage. Even though the high frequency link system used more power semiconductors, a net size, weight, and parts cost saving result compared to the other systems due to elimination of 60Hz transformer.

  • PDF

High-Frequency DC Link Inverter for Grid-connected PV System (계통연계형 태양광발전시스템을 위한 고주파 DC 링크 인버터)

  • Jung Young-Seok;Yu Gwon-Jong
    • Proceedings of the KIPE Conference
    • /
    • 2001.07a
    • /
    • pp.46-49
    • /
    • 2001
  • An investigation into power conditioners that interface with photovoltaic array and utilities has been completed. The rating for this investigation is residential system(3-5kVA) that interface with a 220V single phase utility connection. As the result of this investigation, a 3kVA high frequency PWM IGBT inverter feeding a high frequency isolation transformer with a sinusoidal current wave was selected. The output of the transformer rectified with a diode bridge rectifier. four IGBT, used as 60Hz switched, reverse the polarity of the rectified current on every other half cycle of the utility voltage. Even though the high frequency link system used more power semiconductors, a net size, weight, and parts cost saving result compared to the other systems due to elimination of 60Hz transformer.

  • PDF

A Study on Output Enhancement Method of PV Array Using Electrical Circuit Reconfiguration Algorithm (전기적 회로절체 알고리즘에 의한 태양광 어레이의 출력향상 방안에 관한 연구)

  • Kim, Byung-Mok;Lee, Hu-Dong;Tae, Dong-Hyun;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.9-17
    • /
    • 2020
  • Recently, RES (renewable energy source) projects have been spreading all over the world as an alternative to solve the shortage of energy and environmental problems caused by fossil fuel consumption. The Korean government also supported the policy and demonstration project to increase the proportion of renewable energy to 63.8[GW] until 2030, which is 20[%] of the total power generation. On the other hand, output loss of a PV array can occur when the surrounding high-rise buildings and trees shade a PV array. Therefore, this paper proposes an algorithm to improve the output loss of a PV array, which electrically changes a circuit configuration of PV modules by wiring and switching devices. Furthermore, this study modeled a PV system based on PSIM S/W, which was composed of a PV array, a circuit configuration device, and a grid-connected inverter. From the simulations results with the modeling and test device, the existing method showed no output when 50% of the shade occurs in PV modules. In contrast, the proposed method could produce the output because the voltage in the PV module could be restored to 246[V], and the operation efficiency of the PV system could be improved by the operation algorithm of the circuit configuration device.

Technology Development for Stabilization of PV Independent System (태양광발전시스템 독립계통 안정화 기술개발)

  • Hong, Kyungjin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.5
    • /
    • pp.181-186
    • /
    • 2019
  • In order to reduce the fossil fuels consumed in conventional commercial independent diesel generators in the same environment as the island area, it is necessary to develop a photovoltaic system that will bear more than 40% of the independent system capacity. For this development, it is necessary to develop a high-capacity inverter that can improve the stability of the independent system installed in the island area and supply high-quality power to the load. In addition, the EMS power generation control system for the independent grid photovoltaic power generation system is a parallel operation power control system of the diesel generator connected with the solar power generation system. It controls the output of the diesel generator according to the load ratio and the solar power generation, A stable supply system is needed. This independent grid photovoltaic generation system can increase the solar power supply to the independent system area and increase the power stability of the independent system and further reduce the use of fossil fuel due to the ineffective power control of the independent system. It is expected that the economy will be secured early.

Battery Discharge System Configuration using Photovoltaic Simulator and PCS (태양광 시뮬레이터와 PCS를 이용한 배터리 방전시스템 구성)

  • Jeong, Da-Woom;Park, Sung-Min;Park, Seong-Mi;Park, Sung-Jun;Moon, Seung-Pil
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.3
    • /
    • pp.491-498
    • /
    • 2020
  • Recently, In the production line of batteries, charge and discharge tests are essential to verify battery characteristics. In this case, the battery charging uses a unidirectional AC/DC converter capable of output voltage and current control, and the discharge uses a resistive load. Since this method consumes energy during discharge, it must be replaced with a bi-directional AC/DC converter system capable of charging and discharging. Although it is difficult to replace the connected inverter part of the bi-directional AC/DC converter system due to the high cost, the spread of the solar-connected inverter rapidly increases as the current solar supply business is activated, and thereby the solar-connected type Inverter prices are plunging. If it can be used as a power converter for battery discharge without program modification of the solar-powered inverter, it will have competition. In this paper, propose a new battery discharge system using a combination of a photovoltaic DC/DC simulator and photovoltaic PCS using a battery to be used as a power converter for battery discharge without program modification of a low-cost photovoltaic inverter. In addition, propose an optimal solar characteristic curve for the stable operation of PCS. The validity of the proposed system was verified using a 500[W] class solar DC/DC simulator and a solar PCS prototype.

The long-term operating evaluation of the grid connected PV power system (계통연계형 태양광 발전시스템의 장기 운전평가)

  • Kim, E.H.;Ahn, K.S.;Lim, H.C.;Kim, Y.R.;Kim, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1089-1090
    • /
    • 2008
  • 본 고에서는 전력사업용 특고압 연계 태양광 발전시스템의 실계통 연계운전 특성에 대하여 기술하고자 한다. 본 설비는 150 kVA급 PCS 및 모듈 용량 122.5 kWp의 용량으로 2005년 8월 25일부터 태안발전본부 구내에서 상업운전 중에 있으며, 발전설비 이용율은 12.71 %, 소내 소비율 평균 6.66%로 분석되었으며 특별한 문제점 없이 정상적으로 운전되고 있다.

  • PDF

An application of LAPO: Optimal design of a stand alone hybrid system consisting of WTG/PV/diesel generator/battery

  • Shiva, Navid;Rahiminejad, Abolfazl;Nematollahi, Amin Foroughi;Vahidi, Behrooz
    • Advances in Energy Research
    • /
    • v.7 no.1
    • /
    • pp.67-84
    • /
    • 2020
  • Given the recent surge of interest towards utilization of renewable distributed energy resources (DER), in particular in remote areas, this paper aims at designing an optimal hybrid system in order to supply loads of a village located in Esfarayen, North Khorasan, Iran. This paper illustrates the optimal design procedure of a standalone hybrid system which consists of Wind Turbine Generator (WTG), Photo Voltaic (PV), Diesel-generator, and Battery denoting as the Energy Storage System (ESS). The WTGs and PVs are considered as the main producers since the site's ambient conditions are suitable for such producers. Moreover, batteries are employed to smooth out the variable outputs of these renewable resources. To this end, whenever the available power generation is higher than the demanded amount, the excess energy will be stored in ESS to be injected into the system in the time of insufficient power generation. Since the standalone system is assumed to have no connection to the upstream network, it must be able to supply the loads without any load curtailment. In this regard, a Diesel-Generator can also be integrated to achieve zero loss of load. The optimal hybrid system design problem is a discrete optimization problem that is solved, here, by means of a recently-introduced meta-heuristic optimization algorithm known as Lightning Attachment Procedure Optimization (LAPO). The results are compared to those of some other methods and discussed in detail. The results also show that the total cost of the designed stand-alone system in 25 years is around 92M€ which is much less than the grid-connected system with the total cost of 205M€. In summary, the obtained simulation results demonstrate the effectiveness of the utilized optimization algorithm in finding the best results, and the designed hybrid system in serving the remote loads.