• Title/Summary/Keyword: Green Grid

Search Result 126, Processing Time 0.029 seconds

Measurements of Presbyopic Addition Using a Combination Chart of Cross-Grid and Red Green (십자와 적록 조합시표를 이용한 노안 가입도 측정)

  • Wee, Sung-Hyun;Moon, Byeong-Yeon;Yu, Dong-Sik
    • Journal of Korean Ophthalmic Optics Society
    • /
    • v.13 no.4
    • /
    • pp.115-119
    • /
    • 2008
  • Purpose: To compare the tentative and final addition, a combination chart of cross-grid and red green with the final addition prescribed in presbyopia were used in this study. Methods: The study subjects were 60 persons with presbyopia who were 41 to 60 years (mean: 51.7 years). Tentative addition were determined using red green chart (RG), cross-grid chart (CG) and the combination chart (red green cross-grid chart, RGCG) of the above two. And the final addition for a 40 cm working distance was determined for each subject by adjusting the tentative addition. Results: It was found that there were statistically significant differences of the final addition and the tentative addition between the each different test method. This result indicated that using the red-green cross-grid chart is the higher repeatability. Conclusions: This study shows that red green cross-grid chart (RGCG) seems to be get proper data for determining addition in presbyopes, and this method would be helpful in the diagnostic evaluation of addition in binocular vision testing.

  • PDF

MG Operation Technique based on DC-Grid Stability using ESS (ESS를 활용한 DC-Grid 안정성 기반 MG 운영 기법)

  • Jong-Cheol Kim;Chun-Sung Kim;Yong-Un Park;Seong-Mi Park;Sung-Jun Park
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.6_3
    • /
    • pp.1269-1278
    • /
    • 2023
  • This paper presents an operational technique that can secure the stability of DC-Grid centering on MG operated based on ESS in multiple MG where three DC-based microgrid(MG) are interconnected. MG1(PV 600kWp, ESS 1.5MWh) has an 830Vdc grid voltage, MG2(PV 300kWp, ESS 1.1MWh) and MG3(PV 100kWp, ESS 500kWh) are DC-based MG with a 750Vdc grid voltage, and MG1 and MG2, 3 are linked by separate DC/DC converters (BTB). In order to keep different grid voltages stable, the power transmission capacity between MG1 and two MG(MG2, MG3) connected with an independent BTB converter was adjusted to secure the overall stability of the system, and this was verified by confirming that the surplus capacity of ESS was maintained in actual operation.

Demonstration of Operating Algorithm for Stabilizing Multi-LVDC Power Grid (다회로 LVDC 전력망 안정화를 위한 운영 알고리즘 실증)

  • Yu-Kyeong Lee;Byung-Woo Park;Chun-Sung Kim;Sung-Jun Park
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.6_3
    • /
    • pp.1259-1267
    • /
    • 2023
  • In recent years, as the demand for distributed power has increased, the need for microgrids connected to grid power and renewable power generation sources has emerged. In the case of DC microgrids, reactive power does not occur, and power conversion losses are reduced compared to AC when connecting to the load and power grid[2]. With the revitalization of the DC distribution network industry, various studies and demonstrations of DC microgrids have been carried out. In the case of the recent unit distribution, its stability and effectiveness have been verified through empirical and research analysis. However, there is a lack of empirical tests to prevent chain accidents for the protection of the power grid circuits and the misoperation of the distributed power system caused by individual accidents when connecting various distributed power sources and power grids. In this paper, the operation plan of a stable multi-circuit DC distribution connection for the demonstration site was verified through the protection cooperation and operation algorithm for the stable linkage management of the DC distribution network composed of such a multi-circuit.

The Effect on Scenic Impression by Different Construction Methods of Green Wall

  • Hong, Kwang-pyo;LEE, Hyuk-jae
    • International Journal of Advanced Culture Technology
    • /
    • v.7 no.1
    • /
    • pp.133-142
    • /
    • 2019
  • This study aims to understand how different construction methods impact scenic preference of green wall and clarify features of each construction method to help select the most suitable construction method for the wanted image of a green wall by providing the basic data for further development and distribution of green wall. Questionnaire developed by the Repertory Grid technique proved that 11 adjectives can be used to describe scenic features of a green wall and 4 preference elements. The result of the Scenic evaluation, the Felt type scored high in 'Aesthetic' and 'Maintenance' meaning that it is the most suitable method when constructing a green wall to improve urban scenery. Regression analysis was conducted to understand the link between the preference elements and scenic impression of a green wall. The result is that the higher the preference is on the design of a green wall, the higher the score is for 'Aesthetic'. Also, the higher the preference is on Bio-Diversity, Design, Growth, the higher the score is for 'Natural'. The above findings can be important measures and reference for selection of the right construction method when planning a green wall.

Effects of Rectifier and Copper Grid Interference on the Detection Reliability of Coating Flaws on Buried Pipes (매설 배관 피복 결함 탐상 정확도에 미치는 인접 정류기 및 접지 구리망 간섭의 영향)

  • Kim, M.G.;Lim, B.T.;Kim, K.T.;Chang, H.Y.;Park, H.B.;Kim, Y.S.
    • Corrosion Science and Technology
    • /
    • v.19 no.4
    • /
    • pp.211-223
    • /
    • 2020
  • The external corrosion of buried piping can be controlled using both coating and cathodic protection. Several factors are involved in the damage and deterioration of the coating on pipes. There are many detection methods for coating defects on pipes and the direct current voltage gradient (DCVG) method is one of the most powerful methods. However, the detection reliability of DCVG can be affected by interferences such as stray current, metal objects connected to rectifiers, and copper grids. Therefore, this study focused on the interference effects of rectifiers and a copper grid on the reliability of coating flaw detection. As the length of the interference pipe connected to the rectifier increased, the reliability decreased. In contrast, as the distance between the pipe and the copper grid increased, the reliability of the coating flaw detection increased. The detection results produced by the DCVG method were discussed using current and potential simulations for a pipe with a rectifier and copper grid interference in the soil.

LEAST-SQUARE SWITCHING PROCESS FOR ACCURATE AND EFFICIENT GRADIENT ESTIMATION ON UNSTRUCTURED GRID

  • SEO, SEUNGPYO;LEE, CHANGSOO;KIM, EUNSA;YUNE, KYEOL;KIM, CHONGAM
    • Journal of the Korean Society for Industrial and Applied Mathematics
    • /
    • v.24 no.1
    • /
    • pp.1-22
    • /
    • 2020
  • An accurate and efficient gradient estimation method on unstructured grid is presented by proposing a switching process between two Least-Square methods. Diverse test cases show that the gradient estimation by Least-Square methods exhibit better characteristics compared to Green-Gauss approach. Based on the investigation, switching between the two Least-Square methods, whose merit complements each other, is pursued. The condition number of the Least-Square matrix is adopted as the switching criterion, because it shows clear correlation with the gradient error, and it can be easily calculated from the geometric information of the grid. To illustrate switching process on general grid, condition number is analyzed using stencil vectors and trigonometric relations. Then, the threshold of switching criterion is established. Finally, the capability of Switching Weighted Least-Square method is demonstrated through various two- and three-dimensional applications.

A Study on the Performance Evaluation Index of Multi-Water Resources Connection and Continuous Utilization in Micro Water Grid (마이크로 워터 그리드에서 다중수원 연계·연속 활용 성능평가지표에 관한 연구)

  • Chae, Soo-Kwon;Lee, Sang-Hoon;Ah, Hong-Kyu
    • Journal of Environmental Impact Assessment
    • /
    • v.28 no.6
    • /
    • pp.556-567
    • /
    • 2019
  • As the number of skyscrapers in micro water grid units such as green building and smart building is increasing in the world, the green building certification system is being implemented to solve problems such as increased demand for water resources and energy. However, researches on the use of sustainable water resources like water reuse and water conservation through linkage and continuous use of water resources, while the power and energy sectors are actively conducting R&D projects in the green building certification system on the micro water grid level. Therefore, this paper analyzes the characteristics and limitations of the water resources sector for the continuous utilization of multiple water sources in the green building certification system, due to the inadequate consideration of sustainability. Then investigates whether various water resources such as constants, nature, and alternative water resources are continuously used in and out of the green building or smart building and complex in the micro water grid unit to suggest evaluation methods and performance evaluation standards.

FREE SURFACE FLOW ANALYSIS BY SOROBAN GRID BASED CIP MEHTOD (Soroban grid 기반 CIP법을 이용한 자유표면 유동해석)

  • Im, H.N.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.326-334
    • /
    • 2010
  • In this study, we provide a comprehensive review of the CIP(Constrained Interpolation Pro file/Cubic Interpolated Propagation) method with a pressure-based algorithm that is known as a general numerical solver for soled liquid, gas and plasmas. And also we introduce a body-fitted grid system(Soroban grid) for computation of strongly nonlinear marine hydrodynamic problems such as slamming water on deck, wave impact by green water. This grid system can keep the third-order accuracy in time and space with the help of the CIP method. The grid system consists of the straight lines and grid points. In the 2-dimensional grid case, each grid points moving in these lines like abacus - Soroban in Japanese. The length of each line can be different and the number of grid points in each line can be different. Mesh generation and searching of upstream departure point are very simple and possible to mesh-free treatment. To optimize computation of free-surface and multi-fluid flows, We adopt the C-CUP method. In most of the earlier computations, the C-CUP method was used with a staggered-grid approach. Here, because of the mesh free nature of the Soroban grid, we use the C-CUP method with a collocated-grid approach.

  • PDF

Network Analysis of Green Technology using Keyword of Green Field (녹색 분야 키워드 정보를 이용한 녹색기술 분야 네트워크 분석 (2006년 이후 녹색기술 관련 정보를 중심으로))

  • Jeong, Dae-Hyun;Kwon, Oh-Jin;Kwon, Young-Il
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.11
    • /
    • pp.511-518
    • /
    • 2012
  • In this study, the trend in green technology was observed and the domain of the green technology area that will be actively studied in the future was found by establishing knowledge map in green technology area and comparing and analyzing green technology information in Korea and overseas in time series. For the purpose of this study, network analysis was conducted for the keyword of green technology information provided by green technology information portal site (www.gtnet.go.kr) operated by Korea Institute of Science and Technology Information. Network analysis was conducted using keyword, and change of study subject was found by dividing the analysis result into periods. In the result of network analysis on top 100 keywords from total English keyword, it was found that renewable energy related areas such as solar energy and biomass had high centrality. When the main keyword trend by year was studied, centrality of solar cell, nanotechnology, smart grid, and fuel cell were found to increase, showing that research and development in generation and use of renewable energy are actively made.

Electricity Market Design for the Incorporation of Various Demand-Side Resources in the Jeju Smart Grid Test-bed

  • Park, Man-Guen;Cho, Seong-Bin;Chung, Koo-Hyung;Moon, Kyeong-Seob;Roh, Jae-Hyung
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.6
    • /
    • pp.1851-1863
    • /
    • 2014
  • Many countries are increasing their investments in smart grid technology to enhance energy efficiency, address climate change, and trigger a green energy revolution. In addition to these goals, Korea also seeks to promote national competitiveness, prepare for the growth of the renewable energy industry, and export industrialization through its strategic promotion of the smart grid. Given its inherent representativeness for Korean implementation of the smart grid and its growth potential, Jeju Island was selected by the Korean government as the site for smart grid testing in June 2009. This paper presents a new design for the electricity market and an operational scheme for testing Smart Electricity Services in the Jeju smart grid demonstration project. The Jeju smart grid test-bed electricity market is constructed on the basis of day-ahead and real-time markets to provide two-way electricity transaction environments. The experience of the test-bed market operation shows that the competitive electricity market can facilitate the smart grid deployment in Korea by allowing various demand side resources to be active market players.