• Title/Summary/Keyword: Government Projects

Search Result 1,543, Processing Time 0.027 seconds

Interoperability Verification using BIM Case Models of Road Project (도로 프로젝트의 BIM 사례모델 구축을 통한 호환성 검증)

  • Moon, Hyoun-Seok;Kim, Chang-Yoon;Cho, Guen-Ha;Moon, Jin-Seok;Ju, Ki-Bum
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.44-53
    • /
    • 2015
  • Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.

A Study of IT Maintenance Outsourcing Service Factors of Local Governments: Based on AHP Analysis Method (지방자치단체의 IT 유지보수관리의 아웃소싱 서비스 요인에 관한 연구: AHP 분석을 기반으로)

  • Jun, Daeho;Jang, Sanghyun;Lee, Jeongjae;Choi, Jeongil
    • Journal of Information Technology Services
    • /
    • v.21 no.3
    • /
    • pp.43-61
    • /
    • 2022
  • With the development of information technology, IT-based services in public administration has become more indispensable. As a result, the importance of IT maintenance projects to improve the efficiency of IT services and secure service levels is growing. Due to the nature of IT maintenance projects on local government, which mainly involve small and medium-sized IT companies in the region, business participating companies often do not have an appropriate methodology for service quality management. To solve this situation, the government has prepared a service level agreements (SLAs) that can be applied to IT maintenance projects. However, most local governments do not use SLAs for IT maintenance projects. As a result, various problems such as failure of the IT maintenance project or deterioration of quality are occurring Thus, this paper suggested major indexes to evaluate which service factors affect the efficient operation of information systems and the improvement of service quality in IT maintenance projects of local governments and analyzed the importance of indexes based on AHP method. Using this research method, this study found the theoretical implications on the outsourcing service of IT maintenance.

EVALUATION OF MINIMUM REVENUE GUARANTEE(MRG) IN BOT PROJECT FINANCE WITH OPTION PRICING THEORY

  • Jae Bum Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.800-807
    • /
    • 2009
  • The limited public funds available for infrastructure projects have led governments to consider private entities' participation in long-term contracts for finance, construction, and operation of these projects to share risks and rewards between the public and the private. Because these projects have complicated risk evolutions, diverse contractual forms for each project member to hedge risks involved in a project are necessary. In light of this, Build-Operate-Transfer(BOT) model is considered as effective to accomplish Public Private Partnerships(PPPs) with a characteristic of an ownership-reversion. In BOT projects, the government has used such an incentive system as minimum revenue guarantee(MRG) agreement to attract the private's participation. Although this agreement turns out critical in success of BOT project, there still exist problematic issues in a financial feasibility analysis since the traditional capital budgeting theory, Net Present Value(NPV) analysis, has failed to evaluate the contingent characteristic of MRG agreement. The purpose of this research is to develop real option model based on option pricing theory so as to provide a theoretical framework in valuing MRG agreement in BOT projects. To understand the applicability of the model, the model is applied to the example of the BOT toll road project and the results are compared with that by NPV analysis. Finally, we found that the impact of the MRG agreement is significant on the project value. Hence, the real option model can help the government establish better BOT policies and the developer make appropriate bidding strategies.

  • PDF

Effects of Information from Enterprise Architecture on Government IT Projects (EA(Enterprise Architecture)에서 제공하는 정보가 공공기관 정보화사업수행 활동에 미치는 영향 연구: 관세청 정보화 구축·운영사업 사례를 중심으로)

  • Hyun, Myungjin;Kim, Miryang
    • Informatization Policy
    • /
    • v.29 no.3
    • /
    • pp.61-81
    • /
    • 2022
  • This paper explores how the provided information from Enterprise Architecture (EA) affects the activities to for performing IT projects. The IT projects analyzed in this paper are projects to for developing and maintaining Korea Customs' UNI-PASS. This research was conducted based on surveys to demonstrate the effects of the information from EA on activities for IT projects. Information from EA is categorized into propriety, sufficiency and consistency. Activities for IT projects are defined as management, participation, communication, requirement management and human resource. Correlational analysis is used to measure the effects of the inf ormation on the defined activities. The analysis, which verifies the provided information by EA, does not have meaningful correlation with project management nor human resource. For public officials in charge, Sufficiency of the information produces a positive effect on decision making. For operation company, consistency of the information encourages utilization of the resources required for the project. This research suggests that strategies for performing IT projects with EA information that can support the verification of characteristic environments of each project and performance of vital activities required by the participants' roles will ensure the success of government IT projects.

Sustainability Appraisal of Chinese Railway Projects In Nigeria: Afoot

  • Awodele, Imoleayo Abraham;Mewomo, Modupe Cecilia
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.967-974
    • /
    • 2022
  • It is no news that Nigeria's infrastructure challenge is enormous. In the global ranking, Nigeria ranked low in quantity and quality of its infrastructural provision which has a great impact on the ease of business transaction. Low investments in transportation have brought about the current infrastructural deficit. Recently, the Nigerian government has made effort to address at least to some extent the infrastructural deficit through Public-Private Partnership, but this has not yielded the desired result. Moreover, the sustainability issues relating to railway projects such as, emissions, noise pollution, ecosystem, and other environmental issues calls for urgent attention. Hence, this necessitated consideration on sustainability appraisal for the Chinese rail project in Nigeria. This study reviews sustainability of railway projects built by the Chinese firm in Nigeria with particular emphasis on the environmental and social impact of these projects. The study further identified issues and challenges in project implementation with a particular focus on civil dialogue and community engagements. A detailed literature search was conducted on railway projects and infrastructure by systematically reviewing selected published articles.The analysis of the selected articles identified sustainability issues and potential for improvement of Chinese railway projects and how they contribute to or inhibit competitiveness in the Nigerian railway market. From the literature searched, some of the projects constructed by Chinese firm revealed that there is economic and social impact of railway projects delivered by the Chinese firm in terms of capacity development and knowledge transfer potentiality. For instance, in the just concluded Lagos-Ibadan railway projects, the study gathered that the project brought about 5000 jobs and local staff were trained by the Chinese company, this will boost man power and local content capability. Also, it will significantly improve Nigeria's infrastructure and boost its economic development. The study suggests that Nigerian government should ensure and provide an enabling environment that is conducive for investment on the continent. Peace, improved security, and decent governance are the best conditions for sustainable transportation growth.

  • PDF

A Study on the Architecture of an Electronic Governance System (전자거버넌스 시스템의 구조에 대한 연구)

  • Han Jae-Il;Jun Sung-Taeg
    • The Journal of the Korea Contents Association
    • /
    • v.5 no.1
    • /
    • pp.209-215
    • /
    • 2005
  • The first wave of e-government projects dating from the early 1990s primarily focused on setting up national and global information infrastructure, internal organizational reform, digital procurement, and the digital delivery of government services to citizens. Most of these e-Government projects have concentrated on the development of systems focusing on strengthening the formal agencies and institutions of government. To date, despite many theoretical and empirical studies on citizen involvement in terms of governance, relatively little attention has been paid to developing e-government systems with a focus on improving citizen involvement, which we call e-governance systems. This paper discusses the characteristics of the e-governance systems, identifies core requirements for its development, and suggests an e-governance system architecture that can satisfy the core requirements.

  • PDF

Wetland Conservation Action Plan of Local Government: Gyeongsangnam Province, South Korea (지방정부의 습지보전실천계획 수립과 과제 현황분석: 경상남도를 대상으로)

  • Kim, Ji Yoon;Do, Yuno;Lee, Chan-Woo;Choi, Lee-Ryong;Joo, Gea-Jae;Jo, Hyunbin
    • Journal of Wetlands Research
    • /
    • v.17 no.3
    • /
    • pp.245-250
    • /
    • 2015
  • We systematically analyzed the Wetland Conservation Action Plan of Gyeongsangnam Province to evaluate conservation status in local government level. Project topics were categorized into 1) wetland infrastructure, 2) wetland conservation and wise use, 3) education and awareness, and 4) conservation framework. From 2010 to 2013, 42 projects (145 cases, 88,899 million won) were implemented by 14 affiliated organizations under Gyeongsangnam Provincial Government. The number of projects and budget size has been decreased over 4 years, besides most of main projects were continued. The budgets were largely used for wetland project of cities and counties. Development and implementation of various conservation projects may have considerable potential values in wetland conservation, while it is still difficult to assess their overall effectiveness in the society. Diverse wetland management practices in Gyeongsangnam Provincial Government have accumulated fundamental practices and knowledge for an effective local conservation. These administrative experiences will further benefit other local government to establish wetland management framework. To accelerate policy diffusion to other local governments, Gyeongsangnam Province needs to promote and share leading experiences and information of wetland conservation. Enhanced local government framework by the legislation at central government will further support country-level management plans and practices.

The Current State and Tasks of Citizen Science in Korea (한국 시민과학의 현황과 과제)

  • Park, Jin Hee
    • Journal of Science and Technology Studies
    • /
    • v.18 no.2
    • /
    • pp.7-41
    • /
    • 2018
  • The projects of citizen science which is originated from citizen data collecting action driven by governmental institutes and science associations have been implemented with different form of collaboration with scientists. The themes of citizen science has extended from the ecology to astronomy, distributed computing, and particle physics. Citizen science could contribute to the advancement of science through cost-effective science research based on citizen volunteer data collecting. In addition, citizen science enhance the public understanding of science by increasing knowledge of citizen participants. The community-led citizen science projects could raise public awareness of environmental problems and promote the participation in environmental problem-solving. Citizen science projects based on local tacit knowledge can be of benefit to the local environmental policy decision making and implementation of policy. These social values of citizen science make many countries develop promoting policies of citizen science. The korean government also has introduced some citizen science projects. However there are some obstacles, such as low participation of citizen and scientists in projects which the government has to overcome in order to promote citizen science. It is important that scientists could recognize values of citizen science through the successful government driven citizen science projects and the evaluation tool of scientific career could be modified in order to promote scientist's participation. The project management should be well planned to intensify citizen participation. The government should prepare open data policy which could support a data reliability of the community-led monitoring projects. It is also desirable that a citizen science network could be made with the purpose of sharing best practices of citizen science.

Problems in Management of Rural Special Production Area and Improvement of Political Countermeasures (In the Case of Chungnam Province) (농어촌(農漁村) 특산단지운영상(特産團地運營上)의 문제점(問題點) 및 정책적(政策的) 개선방향(改善方向)(충청남도(忠淸南道)를 중심(中心)으로))

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.20 no.1
    • /
    • pp.88-101
    • /
    • 1993
  • This study is aimed at evaluating the present management status of the rural special production area development projects and identifying managerial problems to propose new direction of the political countermeasures for the projects. In the con text of implementing the five year's economic developent plans for the past three decades, agricultural production and farm-household income have also been grown rapidly. However the income gap between rural and urbarn laborer, as an internal problem, has widened during the decades and the UR problems concerning free trade of agricultural products, as an external problems, are now agonizing the small-holder farm economy in Korea. The internal and external farm problems could be solved through improvement of agricultural structure and provision of off-farm jobs for farm household income increase. As a part of the off-farm income sources, the rural special production area development projects have propelled by the government throughout the country. The main problems to be solved for the successful implementation of the projects are as follows : 1. Present loan amount by the financial fund was estimated at 6-7% of the total installation costs required. To expand and implement the project successfully, enough financial credit support with favorable terms and conditions have to be considered by the government. 2. The operation patterns of the special production area development project should be recommended from the view point of cooperative and private operation to maximize farm household incomes including profits, marketing charges and dividens. 3. Improvement of the marketing channel of the products and marketing information through TV program and other mass communication should be implemented strongly to promote marketsales by the financial supports of the government. 4. In connection with the off-farm income increase, the population migrating to urban area in outside Chungnam province equivalent to 10-12 thousand persons with age of 20-49 years should be taken into account politically to be employed in the projects in the province. 5. Surplus farm labors should be created by means of improvement of agricultural structure including large farm management with farm mechanization and job opportunities have also to be provided in connection with the rural special production area development projects. The two imminent subjects are the prerequisites to increase off-farm incomes for the farmers living in Chungnam province. 6. Required credit supports for investment and operation costs of the projects should be taken actions by the government.

  • PDF

A Study on the Development of Criteria to Assess the Business Performance of the Development Fund for Women and the Organizations it Supports - focusing on the Assessment of the Seoul Metropolitan Government's Development Fund for Women - (여성발전기금의 평가도구 개발 및 지원단체의 사업수행능력 평가에 대한 연구 - 서울특별시 여성발전기금 지원사업 평가를 중심으로 -)

  • Lee, Bong-Wha;Kim, Kyoung-A
    • Journal of the Korean Home Economics Association
    • /
    • v.44 no.3 s.217
    • /
    • pp.127-141
    • /
    • 2006
  • This study aims to create assessment tools for the development fund for women, and to assess the business performance of the organizations using this development fund for women on the basis of such tools. A total of 57 projects by 58 organizations were assessed for a period of eight months. The assessment was carried out by using five tools: 1) examining the weight of the assessment tools, 2) visiting and inspecting project sites, 3) visiting and inspecting the offices of the participating organizations, 4) cooperating with the Seoul Metropolitan Government for municipal administration, and 5) assessing the final project report. Each tool was comprised of three elements: ability of relevant organizations, operational procedure, and projects results. The assessment results are summarized below: 1. According to the examination of the general trends in assessing the organizations that received the Development Fund for Women, it was found that the assessment emphasized performance more than the process involved in the project. Thus, the result suggested that the projects should be carried out more aggressively. 2. Regression analysis was conducted to identify the capability of the organizations in performing the projects with the development fund for women and the capability of the subjects as an independent variable. It was observed that such capabilities were affected by the degree of role sharing and the utilization of internal organizations. It suggested the importance of human resources. 3. To motivate the subjects involved in executing the projects with the use of the Development Fund for Women, the requirements and the satisfaction factors suggested strengthening the scope of financial support and activating the project environment. In conclusion, it is considered that the findings would provide practical ways to improve the system in using the Development Fund for Women, and in setting relevant policies in the future.