• 제목/요약/키워드: Geostationary satellite

검색결과 527건 처리시간 0.024초

통신해양기상위성의 전이궤도 열해석 (TRANSFER ORBIT THERMAL ANALYSIS FOR COMS)

  • 전형열;김정훈;김성훈;양군호
    • 한국전산유체공학회지
    • /
    • 제13권2호
    • /
    • pp.48-54
    • /
    • 2008
  • COMS (Communication, Ocean and Meteorological Satellite) is a geostationary satellite and has been developing by KARI for communication, ocean and meteorological observations. It will be launched by ARIANE 5. Ka-band components are installed on South panel, where single solar array wing is mounted. Radiators, embedded heat pipes, external heat pipe, insulation blankets and heaters are utilized for the thermal control of the satellite. The Ka-band payload section is divided several areas based on unit operating temperature in order to optimize radiator area and maximize heat rejection capability. Other equipment for sensors and bus are installed on North panel. The ocean and meteorological sensors are installed on optical benches on the top floor to decouple thermally from the satellite. During the transfer orbit operation, satellite will be under severe thermal environments due to low dissipation of components, satellite attitudes and LAE(Liquid Apogee Engine) firing. This paper presents temperature and heater power prediction and validation of thermal control design during transfer orbit operation.

정지궤도 위성통신 환경모의를 위한 100 MHz 대역폭의 위성링크 시뮬레이터 개발 (Satellite Link Simulator Development in 100 MHz Bandwidth to Simulate Satellite Communication Environment in the Geostationary Orbit)

  • 이성재;김용선;한태균
    • 한국군사과학기술학회지
    • /
    • 제14권5호
    • /
    • pp.842-849
    • /
    • 2011
  • The transponder simulator designed to simulate the transponder of military satellite communication systems in the geostationary orbit is required to have time delay function, because of 250 ms delay time, when a radio wave transmits the distance of 36,000 km in free space. But, it is very difficult to develop 250 ms time delay device in the transponder simulator of 100 MHz bandwidth, due to unstable operation of FPGA, loss of memory data for the high speed rate signal processing. Up to date, bandwidth of the time delay device is limited to 45 MHz bandwidth. To solve this problem, we propose the new time delay techniques up to 100 MHz bandwidth without data loss. Proposed techniques are the low speed down scaling and high speed up scaling methods to read and write the external memory, and the matrix structure design of FPGA memory to treat data as high speed rate. We developed the satellite link simulator in 100 MHz bandwidth using the proposed new time delay techniques, implemented to the transponder simulator and verified the function of 265 ms time delay device in 100 MHz bandwidth.

통신해양기상위성 Ka 대역 통신탑재체 성능검증 (Performances Evaluation of Ka Band Communications Transponder for COMS)

  • 이용민;이성팔
    • 한국위성정보통신학회논문지
    • /
    • 제3권2호
    • /
    • pp.43-47
    • /
    • 2008
  • 통신해양기상위상은 국내 정지궤도 복합위성 중의 하나이며, 2009년 아리안 로켓 V호에 의해 동경 128도에 발사될 예정이다. 통신해양기상위성은 위성통신, 해양 및 기상관측 등의 세가지 임무 수행을 위해 설계, 제작되었으며, 보다 구체적으로는 세 개의 서로 다른 탑재체에 의해 기상관측, 해양관측 그리고 Ka 대역의 위성통신 서비스를 제공한다. 이 세 개의 탑재체 중에서 Ka 대역 통신 탑재체는 한국전자통신연구원에 의해 개발되었으며 재해 방재를 위한 디지털 전송서비스와 고속 멀티미디어 서비스를 위한 디지털 통신서비스를 제공하게 된다. 본 논문은 통신해양기상위성 Ka 대역 통신 중계기 비행모델의 전기적, 기계적 설계 및 지상검증을 위한 시험 측정결과 등에 관한 것이다.

  • PDF

제2호 정지궤도 해양탑재체(GOCI-II)의 임무 및 요구사양 (Missions and User Requirements of the 2nd Geostationary Ocean Color Imager (GOCI-II))

  • 안유환;유주형;조성익;김석환
    • 대한원격탐사학회지
    • /
    • 제26권2호
    • /
    • pp.277-285
    • /
    • 2010
  • 세계 최초로 개발된 정지궤도 해색탑재체(GOCI-I, Geostationary Ocean Color Imager-I)이 2010년 6월에 발사될 예정이다. GOCI-I의 수명은 약 7년 이므로 위성개발 소요기간 약 6년을 고려하면 제2호 정지궤도 해색탑재체의 개발을 위한 임무 및 이용자 요구사양을 준비해야할 시점이 되었다. 제2호의 임무는 우선 1호의 임무를 승계하는 것이므로 제1호와 유사한 관측 임무를 갖지만 가장 큰 차이점은 장기 기후 변화에 대응한 지구규모적 관측에 있다. 그리고 기존의 Local 관측은 그 공간해상도의 성능을 더 향상시킨 $250m{\times}250m$로 하였고, 1호에 비하여 부족한 band 수를 보강하여 12 개로 하였다. 어장정보를 위한 야간 관측을 위한 Panchromatic band를 추가하였다. 동시에 한반도 주변 고정된 영역 관측기능을 구름이 없는 해역 혹은 special event area로 신축적으로 변경 시킬 수 있는 기능을 갖게 함으로써 위성자료의 활용도를 크게 높이었다. 위성 운용은 1호와 같은 일 8회 관측, 그리고 Global mode인 full disk 관측에서는 일 1-2회 정도 관측할 수 있도록 하였다. 그리고 본 연구에서는 지금까지 위성개발 추진방법의 문제점을 해소한 개선된 개발 추진 방안에 대하여서도 제시하였다. 그 외 제2호의 하드웨어적인 구조 및 디자인에 대하여서는 국내외 개발사와의 상호협의가 필요하다.

정지궤도위성 추진시스템 온도추이를 통한 위성폐기 가능시점 연구

  • 박응식;한조영
    • 항공우주기술
    • /
    • 제4권2호
    • /
    • pp.94-100
    • /
    • 2005
  • 정지궤도 인공위성의 추진시스템은 각 탱크 및 배관, 주요 핵심부분 등에 온도를 측정할 수 있는 온도센서를 장착하고 있다. 또한 추진시스템 내에 다수의 탱크가 장착될 경우 온도변화에 따라 탱크내 추진제가 이동하는 열펌핑 현상이 발생하고 이때 온도변화는 일정한 경향을 갖는다. 본 논문에서는 무궁화위성 1호 추진시스템의 온도변화를 분석하고 이를 통하여 배관내에 가압제의 유입시기를 추정하고 위성폐기 시점을 추정하고자 한다.

  • PDF

Collision Avoidance Maneuver Planning Using GA for LEO and GEO Satellite Maintained in Keeping Area

  • Lee, Sang-Cherl;Kim, Hae-Dong;Suk, Jinyoung
    • International Journal of Aeronautical and Space Sciences
    • /
    • 제13권4호
    • /
    • pp.474-483
    • /
    • 2012
  • In this paper, a collision avoidance maneuver was sought for low Earth orbit (LEO) and geostationary Earth orbit (GEO) satellites maintained in a keeping area. A genetic algorithm was used to obtain both the maneuver start time and the delta-V to reduce the probability of collision with uncontrolled space objects or debris. Numerical simulations demonstrated the feasibility of the proposed algorithm for both LEO satellites and GEO satellites.

Introduction of COMS Meteorological Imager

  • Cho Young-Min;Myung Hwan-Chun;Kang Song-Doug;Youn Heong-Sik
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2005년도 Proceedings of ISRS 2005
    • /
    • pp.112-115
    • /
    • 2005
  • Communication Ocean Meteorological Satellite (COMS) for the hybrid mission of meteorological observation, ocean monitoring, and telecommunication service is planned to be launched onto Geostationary Earth Orbit in 2008. The meteorological payload of COMS is an imager which will monitor meteorological phenomenon around the Korean peninsular intensively and of Asian-side full Earth disk periodically. The meteorological imager (MI) of COMS has 5 spectral channels, I visible channel with the resolution of I km at nadir and 4 infrared channels with the resolution of 4 km at nadir. The characteristics of the COMS MI are introduced in the view points of user requirements, hardware characteristics, and operation features.

  • PDF

천리안위성 기상탑재체의 스캔미러 방사율 보정 (Scan Mirror Emissivity Compensation for the COMS MI)

  • 서석배;진경욱;안상일
    • 항공우주기술
    • /
    • 제10권1호
    • /
    • pp.156-166
    • /
    • 2011
  • 천리안위성은 대한민국 최초의 정지궤도 지구관측위성으로써 기상탑재체와 해양탑재체를 이용하여 24시간 지구관측 임무를 수행한다. 위성은 궤도상 시험을 성공적으로 완료하고 2011년 4월부터 정상운영 중이다. 본 논문에서는 천리안위성 기상탑재체의 스캔미러 방사율 보정 알고리즘 및 이의 소프트웨어 구현에 대해서 설명한다.

인공위성을 이용한 한반도에서의 태양에너지 이용가능성 분석에 관한 연구 (A Study on the Feasibility Analysis for the Use of Solar Energy in Korea Using a Satellite)

  • 조덕기;강용혁;오정무
    • 한국태양에너지학회 논문집
    • /
    • 제22권3호
    • /
    • pp.21-30
    • /
    • 2002
  • Images taken by geostationary satellite may be used to estimate solar irradiance fluxes at earth's surface. It is based on the empirical correlation between a satellite derived cloud index and the irradiance at the ground. For the validation. estimated solar radiation fluxes are compared with observed solar radiation fluxes at 16 sites over the Korean peninsular from January 1982 to December 2000. Estimated solar radiation fluxes show reliable results for estimating the global radiation with average deviation of -5.6 to +2.8% from the measured values and the yearly averaged horizontal global insolation of Korean peninsula was turned out to be $3.038kcal/m^2.day$.

위성기반 보강항법시스템 기술 동향 (Technology Trends of Satellite Based Augmentation Systems)

  • 김정래;김용래;김종윤
    • Journal of Positioning, Navigation, and Timing
    • /
    • 제13권1호
    • /
    • pp.25-34
    • /
    • 2024
  • The Satellite Based Augmentation System (SBAS) improves the accuracy and reliability of user positioning by transmitting the error correction and integrity information of the global navigation satellite system signal from geostationary satellites in real time. For this reason, SBAS was designed for aircraft operations and approach procedures and is now in operational or development stages in many countries. Time has passed since the construction of SBAS and many changes have occurred in the composition of the monitoring stations and the geostationary satellites. These changes have been investigated and the current operation and development status of SBAS globally are surveyed. The development and test schedules for the transition to dual frequency multi-constellation, an important topic in SBAS, are discussed.