• Title/Summary/Keyword: Generation Interval

Search Result 241, Processing Time 0.025 seconds

Performance Improvement Technique for an OFDM System without Guard Interval (보호구간이 없는 OFDM 시스템을 위한 성능 향상 기법)

  • Kim Sung-Hoon;Park Joong-Hoo;Choi Gin-Kyu
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.30 no.5A
    • /
    • pp.382-388
    • /
    • 2005
  • An OFDM system may be a good candidate for a next-generation wireless communication system which requires high-speed and high-rate data transmission. In OFDM systems, guard intervals are inserted to mitigate the effects of ISI (Inter-Symbol Interference). But guard interval insertion degrades the system performance from the standpoint of data rate and bandwidth efficiency. In this paper, a new method to improve the performance of an OFDM system without guard interval. First, PIC (Parallel Interference Cancellation) scheme which can reduce ISI by subtracting the estimated multi-path components from the received signal will be considered. And the proposed system with Pseudo-Decorrelator estimates transmitted signals by using the inverse matrix of cross-correlation matrix relating to interference components. The performance of the proposed system is evaluated through computer simulations and compared with that of the PIC system and an OFDM system without guard interval.

Evaluation of the Possibility of Daily Flow Data Generation from 8-Day Interval Measured Flow Data using SWAT-CUP (SWAT-CUP을 이용한 8일간격 유량측정자료의 일유량 확장 가능성 평가)

  • Jung, Jaewoon;Cho, Sohyun;Lim, Byungjin;Oh, Taeyoun;Ham, Sangin;Kim, Kapsoon
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.4
    • /
    • pp.595-600
    • /
    • 2012
  • This study is to assess the application of SWAT-CUP(Soil and Water Assessment Tool-Calibration Uncertainty Programs) and to extend daily flow data from 8-day interval flow data which has been measured by Korean Ministry of Environment(MOE). Model sensitivity analysis and calibration were performed with sequential uncertainty fitting(SUIF-2), which is one of the programs interfaced with SWAT, in the package SWAT-CUP. The most sensitive parameters were SOL_K.sol, CH_N2.rte, CN2.mgt, SOL_BD.sol, ALPHA_BF.gw, ALPHA_BNK.rte, SOL_AWC.sol, CH_K2.rte, SFTMP.bsn, GW_DELAY.gw. Following the sensitivity analysis, SWAT-CUP calibration was carried out using 8-day interval flow data from January 2008 to December 2010. The results were then assessed based on the visual agreement and simulated flow plots and the performance statistics generated $R^2$ and NSE which are 0.71 and 0.61 respectively. Results of these statistics indicated that there was a good agreement between the observed and simulated flow. To extend daily flow data from 8-day interval flow data, parameters, which were estimated by SWAT-CUP, re-entered for SWAT model. As a result, the observed flow data were found to reflect the trend of simulated flow data. From these results, it is thought that this method could be used to provide daily flow data using 8-day interval flow data.

QUEUEING ANALYSIS OF DYNAMIC RATE LEAKY BUCKET SCHEME WITH MARKOVIAN ARRIVAL PROCESS

  • Choi, Doo-Il;Kim, Hyun-Sook;Sur, Uk-Hwan
    • Journal of applied mathematics & informatics
    • /
    • v.6 no.2
    • /
    • pp.553-568
    • /
    • 1999
  • This paper is of concern to queueing analysis of the dynamic rate leaky bucket(LB) scheme in which the token generation interval changes according to the buffer state at a token generation epoch. Cell arrivals are assumed to follow a Markovian arrival process (MAP) which is weakly dense in the class of the stationary point processes. By using the embedded Markov chain method we obtain the probability distribution of the system state at a token generation epoch and an arbitrary time. Some simple numerical examples also are provided to show the effects of the proposed LB scheme.

Life cycle analysis on correlation relationship between GHG emission and cost of electricity generation system for energy resources (전과정을 고려한 에너지 자원별 전력생산의 온실가스 배출량과 비용의 상관관계 분석)

  • Kim, Heetae;Ahn, Tae Kyu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.136.2-136.2
    • /
    • 2011
  • In this work, we analyzed correlations between life-cycle greenhouse gas (GHG) emissions and life-cycle cost of energy resources. Energy resources studied in this paper include coal, natural gas, nuclear power, hydropower, geothermal energy, wind power, solar thermal energy, and solar photovoltaic energy, and all of them are used to generate electricity. We calculated the mean values, ranges of maximum minus minimum values, and ranges of 90% confidence interval of life-cycle GHG emissions and life-cycle cost of each energy resource. Based on the values, we plotted them in two dimensional graphs to analyze a relationship and characteristics between GHG emissions and cost. Besides, to analyze the technical maturity, the GHG emissions and the range of minimum and maximum values were compared to each other. For the electric generation, energy resources are largely inverse proportional to the GHG emission and the corresponding cost.

  • PDF

Establishment of Zero-Accident Goal Period Based on Time Series Analysis of Accident Tendency (재해율 예측에 근거한 사업장별 무재해 목표시간의 설정)

  • 최승일;임현교
    • Journal of the Korean Society of Safety
    • /
    • v.7 no.2
    • /
    • pp.5-13
    • /
    • 1992
  • If zero-accident movement is to be successful, the objective goal period should be surely obtainable, and much more in our country where frequency rate of injury are remarkably fluc-tuating. However In our country, as far as we know, no method to establish a reasonable zero-accident goal period is guaranteed. In thls paper, a new establishing-method of reasonable goal period for individual industry with considering recent accident trend is presented. A mathematical model for industrial accidents generation was analyzed, and a stochastic process model for the accident generation inteual was formulated. This model could tell the accident generation rate in future by understanding the accident tendency through the time-series analysis and search for the distribution of numbers of accidents and accident interval. On the basis of this, the forecasting method of goal achievement probability by the size and the establishment method of reasonable goal period were developed.

  • PDF

Chance-constrained Scheduling of Variable Generation and Energy Storage in a Multi-Timescale Framework

  • Tan, Wen-Shan;Abdullah, Md Pauzi;Shaaban, Mohamed
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.5
    • /
    • pp.1709-1718
    • /
    • 2017
  • This paper presents a hybrid stochastic deterministic multi-timescale scheduling (SDMS) approach for generation scheduling of a power grid. SDMS considers flexible resource options including conventional generation flexibility in a chance-constrained day-ahead scheduling optimization (DASO). The prime objective of the DASO is the minimization of the daily production cost in power systems with high penetration scenarios of variable generation. Furthermore, energy storage is scheduled in an hourly-ahead deterministic real-time scheduling optimization (RTSO). DASO simulation results are used as the base starting-point values in the hour-ahead online rolling RTSO with a 15-minute time interval. RTSO considers energy storage as another source of grid flexibility, to balance out the deviation between predicted and actual net load demand values. Numerical simulations, on the IEEE RTS test system with high wind penetration levels, indicate the effectiveness of the proposed SDMS framework for managing the grid flexibility to meet the net load demand, in both day-ahead and real-time timescales. Results also highlight the adequacy of the framework to adjust the scheduling, in real-time, to cope with large prediction errors of wind forecasting.

A Novel Digital Over Current Relay with Variable Time-Current Characteristics for Protective Coordination

  • Park, M. S.;P. S. Cho;Lee, S. J.;S. H. Hyun;Kim, K. H.
    • KIEE International Transactions on Power Engineering
    • /
    • v.2A no.3
    • /
    • pp.83-88
    • /
    • 2002
  • An over current relay(OCR), one of the most frequently used protective devices, has time-current characteristics (TCC) to control its trip time according to the current level. It is because an appropriate operating time interval is necessary for coordination with other protective devices. A set of TCC curves of an OCR is, in general, given by the supplier from which a curve is selected by the operator. Therefore, in many cases, it is impossible to consider the operation condition of the given power system exactly. A novel concept of an OCR is suggested in this paper. The proposed OCR has an internal correction module so that it may produce the most adequate TCC curve according to the given protective information for coordination with other devices. With the generated TCC curve, a variety of operation and coordination conditions can be taken into consideration in an effective manner. The suggested OCR is applied to a simple test power system to show very promising results from a coordination point of view.

Multi-Stage Generation Allocation Game Considering Ramp-rate Constraints (경쟁적 전력시장에서 발전기 증감발률을 고려한 다중시간 발전량 배분 게임)

  • Park, Yong-Gi;Park, Jong-Bae;Roh, Jae-Hyung;Kim, Hyeong-Jung;Shin, Jung-Rin
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.3
    • /
    • pp.509-516
    • /
    • 2011
  • This paper studies a novel method to find the profit-maximizing Nash Equilibriums in allocating generation quantities with consideration of ramp-rates under competitive market environment. Each GenCo in a market participates in a game to maximize its profit through competitions and play a game with bidding strategies. In order to find the Nash equilibriums it is necessary to search the feasible combinations of GenCos' strategies which satisfy every participant's profit and no one wants various constraints. During the procedure to find Nash equilibriums, the payoff matrix can be simplified as eliminating the dominated strategies. in each time interval. Because of the ramp-rate, generator's physically or technically limits to increase or decrease outputs in its range, it can restrict the number of bidding strategies of each generator at the next stage. So in this paper, we found the Nash Equilibriums for multi-stage generation allocation game considering the ramp-rate limits of generators. In the case studies, we analyzed the generation allocation game for a 12-hour multi-stage and compared it with the results of dynamic economic dispatch. Both of the two cases were considered generator's ramp-rate effects.

A Hybrid Error Generation Algorithm Using Confidence Intervals on Signal Constellation (신호 성상도 상의 신뢰구간을 활용한 하이브리드 오차 발생 알고리즘)

  • Oh, Kil Nam
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.11
    • /
    • pp.19-25
    • /
    • 2014
  • For effective updating a blind equalizer, we propose the adaptive algorithm having faster convergence speed required for initial equalization and satisfying low error level required in steady-state while having a gradual and reversible switching characteristics between initial stage and steady-state. The proposed method presents three criteria to distinguish the state of equalized signal, according to the criteria, differently updates the equalizer by using the hybrid error generation algorithm generating one of the three errors. Wherein as the criteria to determine the state of the equalized signal the confidence intervals on the signal constellation are used, an error is generated alternatively according to the confidence interval where equalizer output lies, and the equalizer is updated by, we got convergence quickly and to lower error level. In order to verify the usefulness of the proposed idea, simulation results were compared to the performance of conventional methods.

Selection of Maintenance Interval Based on RCM for a Coal Handling Equipment (신뢰도중심정비에 의한 석탄취급설비 정비주기선정)

  • Cho, Il-Yong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.9 no.4
    • /
    • pp.37-42
    • /
    • 2013
  • Power plants have many components and equipment. It is difficult for operators to know the each equipment fails or what equipment fails. It is important to prevent failure in advance. Recently, outlook of maintenance tasks is changing from time based maintenance to condition based maintenance. In this study, we selected RCM-based maintenance intervals for coal handling equipment at coal power plant. For RCM analysis, we have made great progress in a maintenance task and interval. If we apply RCM analysis to the whole plant system, we can expect qualitative improvement and efficient operation of power plant system.

  • PDF