• Title/Summary/Keyword: General Conditions of the Construction

Search Result 276, Processing Time 0.036 seconds

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

A STUDY OF SHOULDERING OF COMPENSATORY LIABILITY FOR DELAYED CONSTRUCTION FERIODS FOLLOWING BAD WEATHER CONDITIONS

  • Tae-Sang Jeong ; Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.705-708
    • /
    • 2005
  • In the case that construcion period is delayed because of the force majeure such as a typhoon or a flood, the owners in general should compensate the damages caused by those. But with exception the weather worsening of ordinary level is paid by contractors, while that of exceptional level by the owners. It is critical that it is difficult to distinguish objectively between ordinary and exceptional level weather worsening. Although the term of "ordinary" itself is too abstractive, we can reduce the disputes between owners and contractors by setting the appropriate and objective standard of distinction. For example in the case of rainfall it may be the standard of distinction whether the days of actual rainfall exceed those of average rainfall or not. If the days of actual rainfall don't exceed those of average rainfall contracters should pay the damages because it is distinguished with a ordinary level weather worsening. Besides the standard of distinction in another weather worsening such as severe cold/hot, strong wind etc. which have a effect on delaying the term of works could be settled as a similar model.

  • PDF

The permeability charateristic of Z-type sheet pile joints under water sealing conditions (Z형 강널말뚝의 오염물질 차단효과)

  • Hong, Seung-Seo;Lee, Yong-Soo;Chung, Ha-Ik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1283-1288
    • /
    • 2009
  • In general steel sheet piles are used in the containment system, which are vertical barrier systems for waste disposal and landfill purposes, and roads in excavation for temporary structure. This paper presents case study of the use of an interlocking sheet pile for water and containment. Cut-off Z-type sheet pile joints are investigated to determine their permeability from the field test. Four different joint sealing materials are used in field test. The results showed joint permeability is significant time-dependent and joint-dependent. These are explored and conclusions on permeability characteristics of different sealants are noted. A case study gives a design example as well as suggestion on permeability and water tightness can be implemented in using the sheet pile barrier in civil and environment works. From the test results, the effective sealing programs of sheet pile interlocks are suggested.

  • PDF

Results Of Mathematical Modeling Of Organizational And Technological Solutions Of Effective Use Of Available Resource Of Modern Roofs

  • Arutiunian, Iryna;Mishuk, Katerina;Dankevych, Natalia;Yukhymenko, Artem;Anin, Victor;Poltavets, Maryna;Sharapova, Tetiana
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.1
    • /
    • pp.49-54
    • /
    • 2021
  • Relative to the outer surface of the mastic coating, the reliability of the available waterproofing resource is determined by the ability to stabilize the structural characteristics in difficult climatic conditions. Organic components of mastic as a result of solar radiation, elevated temperatures and their alternating change, atmospheric oxidants, especially in industrial areas, have a tendency to self-polymerization and loss of low molecular weight components. This is the gradual loss of deformability and the transition to brittleness with its tendency to crack as the reasons for the gradual transition from normal to emergency operating condition.The presented mechanism of functioning of the coating surface indicates the expediency of increasing its components, able to stabilize the structure and prevent changes in deformability.Durability, hydrophobicity, water displacement, water absorption are accepted as estimating indicators. The main dependences of the influence of the lost additional components of mastic on the operational properties of the formed coating characterize the ability to provide successful resistance to environmental influences and longer stability. As a result, mastic acquires additional service life.

Procedure and Document Format for Requesting Construction of Local Administrative Offices by each Province in the 1930s (1930년대 각도의 지방행정관청사 건축요구 절차 및 문서형식)

  • Kim, Myungsun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.6
    • /
    • pp.43-49
    • /
    • 2021
  • During the Japanese colonial period in Korea, the Choson Governor-General was a kind of state organ. At that time, for a local administrative office to be built, each province('Do') had to go through a certain administrative procedure and be approved by the Choson Government-General. In addition, it was necessary to receive financial support from the Choson Governor-General in the name of "state assistance" because the financial conditions of each province were not sufficient. To obtain this approval and financial support, the administrative procedure was divided into the first half, where each province requested the construction of a local administrative office, and the second half, where the Choson government-general approved it and supported it financially. There are studies on the first half procedure in 1914 and 1927, which were limited to the new construction of county('Goon') offices among several local administrative offices. This study analyzed the first half of the construction of all local administrative offices in the 1930s.

Development of New Micropiling Technique and Field Installation (신개념 마이크로파일 개발 및 현장시험시공)

  • Choi, Chang-Ho;Goo, Jeong-Min;Lee, Jung-Hoon;Cho, Sam-Deok;Jeong, Jae-Hyeong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.571-578
    • /
    • 2009
  • Recently, micropiling techniques are increasingly applied in foundation rehabilitation/underpinning and seismic retrofitting projects where working space provides the limited access for conventional piling methods. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. Its installation is possible in restrictive area and general ground conditions. The cardinal features that the installation procedures cause minimal vibration and noise and require very low ceiling height make the micropiling methods to be commonly used for underpin existing structures. In the design point of view, the current practice obligates the bearing capacity of micropile to be obtained from skin friction of only rock-socketing area, in which it implies the frictional resistance of upper soil layer is ignored in the design process. In this paper, a new micropiling method and its verification studies via field installation are presented. The new method provides a specific way to grout bore-hole to increase frictional resistance between surrounding soil and pile-structure and it allows to consider the skin friction of micropiles for upper soil layer during design process.

  • PDF

Case History: Micropiling for Existing Foundation Retrofits (마이크로파일을 이용한 기초보강공법의 국내 적용 사례)

  • Lee, Jung-Hoon;Choi, Chang-Ho;Cho, Sam-Deok;Lee, Ki-Hwan;Jo, Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.359-365
    • /
    • 2008
  • As housing supply ratio has become over 100%, the strategic vision of government's policies has been changed from new construction to maintenance and regeneration of old architectural-structures. This fact has brought a light on the reconstruction and remodeling industries and a need for retrofit and rehabilitation techniques of existing foundation. Various methods of foundation for architectural-structures do exist. Among them, micropiling technologies are increasingly applied in foundation rehabilitation and seismic retrofitting projects. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. The installation is possible in restrictive area and general ground conditions. The fact that the installation procedures cause minimal vibration and noise and require very low ceiling height makes the micropiling methods to be commonly used for underpin existing structures. Specialized drilling equipment is often required to install the micropiles for existing basement facilities. This paper presents a case study in which micropiles were constructed to support a superstructure for vertical extension of existing elevator core and provide accessibility to underground parking lot. It is intended to become useful reference for the similar remodeling project.

  • PDF

Intent signal generation of the exoskeletal robotics for construction workers and verification of its feasibility (건설작업자의 근력지원을 위한 외골격 모듈의 동작의지신호 생성 및 타당성 검증)

  • Lee, Seung-Hoon;Yu, Seung-Nam;Lee, Hee-Don;Jang, Jae-Ho;Han, Chang-Soo;Han, Jung-Soo
    • Proceedings of the KSME Conference
    • /
    • 2008.11a
    • /
    • pp.1603-1608
    • /
    • 2008
  • Powered robotic exoskeletons are currently under development for assisting or supporting human muscle power. Many applications using this system for the purpose of national defense system, medical support, and construction industry are now frequently introduced. In this paper, we proposed the exoskeletal wearable robotics for construction workers. First, we analyzed general work conditions at the construction site and set up target tasks through the datum. Then dominant muscles’ activity which is related with the defined target tasks was checked up. Herein, wearers’ intent signal generation methodology was introduced in order to effectively activate the proposed system. In the final part of this paper, we evaluated the capability and feasibility of the exoskeletal robotics by the electromyography (EMG) signal variance; demonstrated that robotic exoskeletons controlled by muscle activity could be useful way of assisting with construction workers.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

An Alternative Approach to Optimal Impulsive-Thrust Formation Reconfigurations in a Near-Circular-Orbit

  • Kim, Youngkwang;Park, Sang-Young;Park, Chandoek
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.37 no.2
    • /
    • pp.160.1-160.1
    • /
    • 2012
  • We present an alternative approach for satellite formation reconfiguration by an optimal impulsive-thrust strategy to minimize the total characteristic velocity in a near-circular-orbit. Linear transformation decouples the Hill-Clohessy-Wiltshire(HCW) dynamics into a new block-diagonal system matrix consisting of 1-dimensional harmonic oscillator and 2-dimensional subsystem. In contrast to a solution based on the conventional primer vector theory, the optimal solution and the necessary conditions are represented as times and directions of impulses. New analytical expression of the total characteristic velocity is found for each sub systems under general boundary conditions including transfer time constraint. To minimize the total characteristic velocity, necessary conditions for times and directions of impulses are analytically solved. While the solution to the 1-dimensional harmonic oscillator has been found, the solution to the 2-dimensional subsystem is currently under construction. Our approach is expected to be applicable to more challenging problems.

  • PDF