Kim, Chae-Hyoung;Lee, Kwang-Jin;Han, Yeoungmin;Chung, Yonggahp
Journal of the Korean Society of Propulsion Engineers
/
v.19
no.5
/
pp.91-97
/
2015
After-burner test facility for gas generators of 75 tonf class liquid rocket engines was designed, which was verified by the facility certification test of the Combustion Chamber Test Facility(CCTF). The purpose of the certification test of the after-burner test facility is to verify the combustion stability of gas torches equipped in the gas generator and the after-burner test facility by using methane and oxygen gases. In the case of the autonomous test, the supply system provided steadily methane and oxygen gases to the after-burner system without pressure drop. The combustion pressure of the gas torch approached the design requirement. In the case of the coupled test, the gas generator ignition and the fuel-rich exhaust gas combustion were successfully carried out, leading to the verification of the test facility.
Park, Seoung-Soo;Ju, Woo-Sung;An, Seung-Hee;Lee, Jeong-Hwan
한국신재생에너지학회:학술대회논문집
/
2009.06a
/
pp.705-708
/
2009
For the Gas hydrate Research and Development in Korea, the prospect area I & II was surveyed and drilled during the first phase. At the result, we succeeded to discovering gas hydrate real sample at BSR reflection and vent structure. This expedition processing contributes to developing the offshore seismic survey technologies and data processing of Korea. But Korean gas hydrate test production research, in spite of activating test production at other countries, is such a limitation about technician, GH production technologies and E&P processing. First of all, there is no exist in Korea to application site for the their production research results. In this paper, we have studied the gas hydrate reservoir selection technics of the DOE & BPXA for the ANS test production. And this result will helpful to preparation of gas hydrate test production in Korea.
Jang, Yu Ri;Kim, Jeong Hwan;Kim, Seong Hee;Kwak, Young Hwan
Journal of the Korean Institute of Gas
/
v.21
no.6
/
pp.15-22
/
2017
The pressure safety valve is very important device for securing the safety in the facilities which is operated by high pressure gases. The performance test should be periodically inspected by relate law because the failure of pressure safety valves might be main causes of serious accidents in the industrial fields. Shop test is mainly use for inspecting the performance test of pressure safety valves but the test method is not to be a solution for securing the safety. So, the development of alternative method is required. In this paper, there is a limit to securing the safety if the performance test is with just shop test. The limitation is checked from analysis result based on performance test results of pressure safety valves. The necessity for introducing the in-service test is reviewed to surmount the limitation. As a result, in-service test method should be developed and introduced to improve the inspection efficiency and economical loss. Also, it can be reduce the risk level.
Journal of the Korean Society of Industry Convergence
/
v.21
no.6
/
pp.429-437
/
2018
The process gas piping of the offshore plant can cause a massive explosion if the gas leakage occurs during operation. For the purpose of precaution of gas leakage accident, an air pressure test is performed on the process equipment tests using a test pump as much as the power to the piping inner side, mix 99% nitrogen gas and 1% helium gas. The purpose of the air pressure test is to check the work conformity process by handling and regulation for initial piping process, assembly, installation of module, welding, center alignment of the pipes assembling flange gasket in an unrestrained free state. In this paper, the regulation of the problematic air pressure test was analyzed and the solution criteria were established. And leakage tests of existing equipment were performed applying these solution methods. As a result, it was confirmed that there was no problem.
Ha, Young-Cheol;Kim, Sung-Min;Lee, Chang-Eon;Choi, Kyoung-Seok
Transactions of the Korean Society of Mechanical Engineers B
/
v.35
no.4
/
pp.439-444
/
2011
To determine the test gases for gas appliances of new gas group, the interrelation between gas interchangeability, including thermal efficiency, of 13A gas appliances and present 13A test gases was experimentally investigated. The test results show that the Wobbe indices in the case of incomplete combustion and the flame lifting limit gas for the new gas group are respectively 2% higher than the upper limit and 1% lower than the lower limit of the Wobbe index range. The most suitable composition of R gas is 96 mol% of methane and 4 mol% of propane; LNG could be also used as R gas. Further, analysis results showed that the hydrogen concentration of flash back limit gas could be lowered from 30 vol% to 23 vol%.
Kim, Seung-Han;Nam, Chang-Ho;Kim, Cheul-Woong;Moon, Yoon-Wan;Seol, Woo-Seok
Transactions of the Korean Society of Mechanical Engineers B
/
v.34
no.5
/
pp.563-568
/
2010
Turbopump-gas generator open-loop coupled tests are performed during the development of a 30tonf-LOx/Kerosene rocket engine. In the turbopump-gas generator open-loop tests, the propellants to gas generator are supplied from the outlets of turbopump, while the gas exhausted from the gas generator is vented out to the atmosphere, instead of being used to turbine driving. This paper presents the objectives, procedure, and results of the open-loop coupled test, in addition to a schematic representation of the test apparatus and the operating conditions for the test facility system and control system. The results of turbopump-gas generator open-loop coupled test confirm chill-down procedure, startup characteristics, nominal operability and smooth shutdown of the open-loop coupled Test Plant in test conditions simulating engine system operation environment.
Journal of the Korean Society of Propulsion Engineers
/
v.18
no.2
/
pp.86-92
/
2014
Combustion Chamber Test Facility (CCTF) to be constructed in Naro Space Center for re-burning the fuel-rich gas of gas generator have afterburner system. The afterburner system is supplied the Oxygon ($O_2$) gas and Methane ($CH_4$) gas to reduced the harmful exhaust gas. The detailed design for the planned CCTF afterburner system is simulated and analysed by AMESim program through the all of gas supply system components. Afterburner system is performed to verify the pipe size, orifice diameter, and gas supply conditions according to the total gas consumption from analysis of gas supply system.
International Journal of Clinical Preventive Dentistry
/
v.14
no.4
/
pp.247-255
/
2018
Objective: Osseointegration is essential process for successful implants and effects to implant in long term, therefore, passive fitness of good prosthesis is necessary. To make a good prosthesis, at first it should be done a sectioned casting and then joined method of sectioned casting body is recommended. Methods: In this study, to provide the fundamental data on stable connection method for successful implants, the author tested fitness of casting body, and compared difference between gas soldering technique and laser welding technique. Results: In fitness test of 2 abutment (test A, C), gas soldering group's fitness in the opposite part of connection was worse than laser welding group. In fitness test of 3 abutment (test B, D), gap distance was increased both in gas soldering technique and laser welding technique. Gap distance at the connecting part and the opposite part of the abutment in gas soldering technique was worse than laser welding technique and the more additional abutment, the worse gap distance in gas soldering technique. In fitness test of 3 abutment (test B, D), there's little variation in No. 2 abutment when connecting soldering process was done and there's little influence on already soldered connection part when the additional soldering connection was done. Conclusion: On weak loading condition and the part which is needed an accuracy, laser welding technique is more effective and on long-span prosthesis and frequent chewing loading part, laser welding technique is recommended first and applying additional gas soldering technique would be better for making much more successful prosthesis.
Proceedings of the Korean Society of Propulsion Engineers Conference
/
2017.05a
/
pp.587-590
/
2017
Performance test was conducted by micro gas turbine engine. A small test rig was established for the performance measurement of the micro gas turbine engine. The performance was conducted by the Olympus HP engine. Engine inlet mass flow rate, static thrust, fuel consumption rate, air and gas temperature at the inlet of major components were measured. In the test results, we could well understand about the micro gas turbine engine performance characteristics.
To improve the core technology of the micro gas turbine, the performance test facility was developed. This paper is focusing on the explanation of the characteristics of micro gas turbine and its assist devices. Major part of micro gas turbine were radial type of compressor, annular type of combustor, radial type of turbine, thrust foil bearing, radial foil bearing and generator. The assist devices were consist of exhaust duct, inverter, data acquisition system, load bank and test cell. Before building up the test facility, the component test was previously conducted to confirm the component performance. After the test facility was prepared, the motoring test was conducted to investigate the rotor dynamic characteristics of the micro gas turbine. Also, the part load performance test was performed. With a developed micro gas turbine test facility, the improved core technology about the micro gas turbine can be suggested to the related industries.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.