• Title/Summary/Keyword: Gap Risk

Search Result 252, Processing Time 0.031 seconds

SEISMIC ISOLATION OF LEAD-COOLED REACTORS: THE EUROPEAN PROJECT SILER

  • Forni, Massimo;Poggianti, Alessandro;Scipinotti, Riccardo;Dusi, Alberto;Manzoni, Elena
    • Nuclear Engineering and Technology
    • /
    • v.46 no.5
    • /
    • pp.595-604
    • /
    • 2014
  • SILER (Seismic-Initiated event risk mitigation in LEad-cooled Reactors) is a Collaborative Project, partially funded by the European Commission in the $7^{th}$ Framework Programme, aimed at studying the risk associated to seismic-initiated events in Generation IV Heavy Liquid Metal reactors, and developing adequate protection measures. The project started in October 2011, and will run for a duration of three years. The attention of SILER is focused on the evaluation of the effects of earthquakes, with particular regards to beyond-design seismic events, and to the identification of mitigation strategies, acting both on structures and components design. Special efforts are devoted to the development of seismic isolation devices and related interface components. Two reference designs, at the state of development available at the beginning of the project and coming from the $6^{th}$ Framework Programme, have been considered: ELSY (European Lead Fast Reactor) for the Lead Fast Reactors (LFR), and MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) for the Accelerator-Driven Systems (ADS). This paper describes the main activities and results obtained so far, paying particular attention to the development of seismic isolators, and the interface components which must be installed between the isolated reactor building and the non-isolated parts of the plant, such as the pipe expansion joints and the joint-cover of the seismic gap.

The Influence of Role Models on Entrepreneurial Intention: Does Individual Innovativeness Matter?

  • EFRATA, Tommy Christian;RADIANTO, Wirawan Endro Dwi;EFFENDY, Junko Alessandro
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.2
    • /
    • pp.339-352
    • /
    • 2021
  • This study aims to explore the relationship between entrepreneurial role models (ERM) and entrepreneurship education (EE) on individual entrepreneurial orientation (EO) and its consequences for entrepreneurial intention (EI). Data is obtained through a survey method on 255 management and business university students who had completed the entrepreneurship education program. To evaluate the research model, the data is processed using PLS-SEM. The results of this study indicate that the existence of entrepreneurial role models and entrepreneurial education programs for students affects the components of individual entrepreneurial orientation, namely individual innovativeness, individual proactiveness, and individual risk-taker. However, ERMs do not have a direct effect on EI. The main finding of this research appears on the influence of individual EO on EI, which indicates that only individual innovativeness impacts entrepreneurial intention. Meanwhile, personal proactiveness and risk-takers are proven to have no impact on EI. This study succeeded in filling the research gap, namely, examining the influence of ERMs on each of the components forming an individual entrepreneurial orientation (IEO) and its EI. This research model also provides a comprehensive research model on the influence of pre-entrepreneurial exposure on IEO and its consequences on EI.

Future flood frequency analysis from the heterogeneous impacts of Tropical Cyclone and non-Tropical Cyclone rainfalls in the Nam River Basin, South Korea

  • Alcantara, Angelika;Ahn, Kuk-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.139-139
    • /
    • 2021
  • Flooding events often result from extreme precipitations driven by various climate mechanisms, which are often disregarded in flood risk assessments. To bridge this gap, we propose a climate-mechanism-based flood frequency analysis that accommodates the direct linkage between the dominant climate processes and risk management decisions. Several statistical methods have been utilized in this approach including the Markov Chain analysis, K-nearest neighbor (KNN) resampling approach, and Z-score-based jittering method. After that, the impacts of climate change are associated with the modification of the transition matrix (TM) and the application of the quantile mapping approach. For this study, we have selected the Nam River Basin, South Korea, to consider the heterogeneous impacts of the two climate mechanisms, including the Tropical Cyclone (TC) and non-TCs. Based on our results, while both climate mechanisms have significant impacts on future flood extremes, TCs have been observed to bring more significant and immediate impacts on the flood extremes. The results in this study have proven that the proposed approach can lead to a new insights into future flooding management.

  • PDF

Integrated Flood Risk Management through Modelling of Nature Based Solutions

  • Bastola, Shiksha;Kareem, Kola Yusuff;Park, Kiddo;Jung, Younghun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.160-160
    • /
    • 2022
  • Floods are the most common natural disasters and are annually causing severe destructions worldwide. Human activities, along with expected increased extreme precipitation patterns as a result of climate change enhance the future potential of floods. There are proven evidence that infrastructure based responses to flood disaster is no longer achieving optimum mitigation and have created a false sense of security. Nature-based solutions(NBS) is a widely accepted sustainable and efficient approach for disaster risk reduction and involves the protection, restoration, or management of natural and semi-natural ecosystems to tackle the climate and natural crisis. Adoption of NBS in decision-making, especially in developing nations is limited due to a lack of sufficient scenario-based studies, research, and technical knowledge. This study explores the knowledge gap and challenges on NBS adoption with case study of developing nation, specially for flood management, by the study of multiple scenario analysis in the context of climate, land-use change, and policies. Identification and quantification of the strength of natural ecosystems for flood resilience and water management can help to prioritize NBS in policymaking leading to sustainable measures for integrated flood management.

  • PDF

A Relationship of Managing Impacts of FOREX Fluctuations and Organizational Capabilities in Construction Business

  • Mohamed, Mohd Amizan Bin;Teo, Melissa;Kajewski, Stephen;Trigunarsyah, Bambang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.477-480
    • /
    • 2015
  • Construction projects are high-risk activities. When undertaking such projects in an international setting, it can be complicated by foreign exchange (FOREX) fluctuation risk. This affects the construction business performance in various ways, namely its progress due to delays, which in turn create further problems, specifically cost overruns as a result of price increase in raw materials, disputes, arbitration, litigation and even, total abandonment. Thus, the effective management of FOREX fluctuations is crucial. Previous studies have focused on the need for contract safeguards, adequate insurance, careful planning and management, as well as foreign exchange futures hedging to address some of the risks triggered by FOREX fluctuations. An analysis of FOREX fluctuations in the international construction industry revealed that more often it was focused on project-specific issues. Currently, there is a relative lack of awareness on Organizational Capabilities (OC), the abilities that owned by the organization, which is essential in managing the impact of FOREX fluctuations. Where research has focused on OC, these are viewed in isolation. Therefore, this study attempts to close the gap by proposing a framework on managing the impact of FOREX fluctuations in the international construction industry, employing the OC perspective.

  • PDF

CASE STUDY OF THE NATIONAL STADIUM: RISKS AND OPPORTUNITIES IN CHINA'S PPP IMPLEMENTATIONS IN MAJOR SPORTS FACILITIES

  • Xinyi Song;Wei Liang;Carlos A. Arboleda;Shouqing Wang;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.474-479
    • /
    • 2011
  • With Beijing's success in bidding for the 2008 Olympic Games, the increasing demand for infrastructure development and reduced public sector funding capacity has created a significant funding gap which calls for alternative project delivery methods such as Public-Private Partnership (PPP). Although the exploration of infrastructure projects using PPP model have been practiced since the late 80s, the $560 million National Stadium which served as the main venue for the Olympic Games is the first stadium project in China to be delivered under PPP operation. The project is generally considered successful despite the concession transfer in 2009 with concern of better serving the public interest. Compared to other infrastructure projects such as transportation, waste management and water management, the development of major sports facilities for mega-sports events with PPP has its own unique features and is subject to different major risks. This research identifies and analyzes critical risks in the implementation of PPP in major sports facility development through case study of the National Stadium project. A questionnaire survey and several interviews are conducted to solicit expert opinions from experienced practitioners. The purpose is to provide additional insights in risk management strategies and opportunities in China's PPP implementations in major sports facilities for policy makers and private sectors involved with investment decisions in future similar infrastructure development.

  • PDF

Development of Korean Chemical Ranking and Scoring System (CRS-Korea) and its Application to Prioritizing National Toxic Chemicals (화학물질 우선순위 선정 기법(CRS-Korea)의 개발과 적용)

  • Park Hoa-Sung;Kim Ye-shin;Lee Dong Soo;Shin Yong-seung;Choi Seung-pil;Park Seong-eun;Kim Myung-hyun;Yang Ji-yeon;Shin Dong-chun
    • Environmental Analysis Health and Toxicology
    • /
    • v.20 no.2 s.49
    • /
    • pp.109-121
    • /
    • 2005
  • A chemical ranking and scoring (CRS-Korea) system was developed and proposed to use as the first step to prioritize the toxic chemicals for the purpose of monitoring and detailed risk assessment that might follow as necessary. The CRS-Korea system takes a basic concept of risk assessment (both human health risk and ecological risk) in that risk score is determined by the product of toxicity score and exposure score. Included in the toxicity category are acute toxicity, chronic/sub -chronic toxicity, carcinogenicity, and other toxicity. The exposure category consists of quantity released to the environment, bioconcentration, and persistence. A consistent scheme and a comprehensive chemical data base are offered in the CRS-Korea system to calculate a score for the each component in the two categories by using specific physicochemical, fate, and toxic properties and the quantity of the chemical used. The toxicity score is obtained by adding up all the individual scores for the components in the toxicity category. The exposure score is determined by multiplication of the score of the quantity released with the sum of persistent score and bioconcentration score. Equal weight is given to the toxicity score and the exposure score. As the CRS-Korea system was applied to identify 50 national priority chemicals, it was found that significant data gap exists on toxicity and fate properties and that the uncertainty associated with estimating the quantify released to the environment is notably high. The proposed CRS system is only a screening tool in the first step toward the priority setting and should be used with expert judgement and other considerations necessary.

Seismic Risk Analysis of Track-on-Steel Plate Girder Railway Bridges (무도상 강판형 철도교의 지진 위험도 해석)

  • Park, Joo Nam;Choi, Eun Soo;Kim, Sung Il;Cho, Sung Cheol
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.1
    • /
    • pp.45-53
    • /
    • 2009
  • More than 40% of railway bridges on the conventional lines in Korea consist of track-on-steel plate girder (TOSPG) bridges. This type of bridge is typically designed without considering seismic loadings, as most of them were built before 1970. The seismic performance of this particular type of bridge could be upgraded through various seismic retrofit schemes, and seismic risk assessment could play a key role in decision-making on the level of the seismic retrofit. This study performed a seismic risk assessment of TOSPG bridges in Korea. The seismic damage of several crucial components of TOSPG bridges--fixed bearings, free bearings, and piers--were probabilistically estimated, and their seismic fragility curves were developed. The probability that the components would exceed their predefined limit states was also calculated by combining the fragility curves and the seismic hazard function. The analysis showed that the piers of TOSPG bridges, which are made of plain concrete without rebars, have relatively low risk against seismic loadings in Korea. This is because the mass of the superstructures of TOSPG bridges is relatively small, and hence, the seismic loading being transferred to the piers is minimal. The line-type bearings typically used for TOSPG bridges, however, are exposed to a degree of seismic risk. Among the bearings, the probability of the free-end bearings and the fixed-end bearings exceeding the slight damage state in 50 years was found to be 12.78% and 4.23%, respectively. The gap between these probability values lessened towards more serious damage states. This study could effectively provide an engineering background for decision-making activities on the seismic retrofit of railway bridges.

Overview of the Development of the Korean Exposure Factors Handbook

  • Jang, Jae-Yeon;Jo, Soo-Nam;Kim, So-Yeon;Myung, Hyung-Nam
    • Journal of Preventive Medicine and Public Health
    • /
    • v.47 no.1
    • /
    • pp.1-6
    • /
    • 2014
  • A set of exposure factors that reflects the characteristics of individual behavior capable of influencing exposure is essential for risk and exposure assessment. In 2007, the Korean Exposure Factors Handbook was, therefore, issued, driven by the need to develop reliable exposure factors representing the Korean population. The purpose of this study was to overview the development process of the Korean Exposure Factors Handbook and major recommended exposure values for the Korean population to allow information exchanges and comparison of recommended values among nations. The researchers reviewed the domestic data that could be used in the development of exposure factors, confirmed a knowledge gap, and set a priority of development by phases. A methodology to measure exposure factors was established to develop measuring techniques and test their validity. Data were processed or a survey was conducted according to the availability of data. The study thus produced recommended values for 24 exposure factors grouped by general exposure factors, food ingestion factors, and activity factors by setting up a database of exposure factors and carrying out statistical analysis. The study has significantly contributed to reducing the potential uncertainty of the risk and exposure assessment derived by the application of foreign data or research findings lacking representativeness or grounds by developing a set of exposure factors reflecting the characteristics of the Korean people. It will be necessary to conduct revisions in light of the changing statistical values of national data and the exposure factors based on Korean characteristics.

Estimation of Tsunami Risk Zoning on the Coasts Adjacent to the East Sea from Hypothetical Earthquakes (공백역 지진에 의한 동해에 연한 해안에서의 지진해일 위험도 산정)

  • 최병호;에핌페리놉스키;이제신;우승범
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.6 no.5
    • /
    • pp.1-17
    • /
    • 2002
  • Prognostic characteristics of hypothetical tsunamis in the East Sea are further discussed based on numerical simulations using linear long wave theory than the last paper(Choi et al). As for choice of source zones, we used 28 cases based on fault parameters of hypothetical earthquakes and 76 cases based on simple initial surface shapes of tsunamigenic earthquakes selected by the seismic gap theory. As a result, the wave heights along the whole coastline adjacent to the East See of tsunamis due to these hypothetical earthquake are presented. Analyses also lead us to conclude that the selection of geographical zones with low risk of tsunamis can be used as a tool for coastal disaster mitigation planning.