• 제목/요약/키워드: GIS Substation

검색결과 86건 처리시간 0.032초

Analyse the Electric field of symmetrical and asymmetrical concentric electrodes

  • Singhasathein, Arnon;Suwanapingkarl, Pasist;Phanthuna, Nattaphong;Ted-I, Taweesak;Teevarangsan, Teepagon;Yumonthian, Tananan
    • International journal of advanced smart convergence
    • /
    • 제4권1호
    • /
    • pp.114-119
    • /
    • 2015
  • The different between two potential voltages can cause the electric field. The electric field is normally distributed along the radius of electrode, and hence it depends on the shape of electrodes. This paper analyses the distribution factor of electric field of symmetrical and asymmetrical concentric electrodes by using Finite Element technique. This allows an analysis the optimum safety clearance distance between two concentric electrodes. The symmetrical concentric electrode refers to Spherical-Spherical concentric electrodes and Cylindrical-Cylindrical concentric electrodes. It must be noted that the symmetrical electrodes are mostly applied for Gas Insulated Substation (GIS) equipments. The asymmetrical electrodes mention to Spherical (inner)-Cylindrical (outer) concentric electrodes and Cylindrical-Cube concentric electrodes, which present as the connection point of High Voltage (HV) cable. The simulations is also complies with the existing standards and regulations in order to ensure the accurate results.

송변전설비 전력영향평가 시스템 개발 (Development of electric power effect estimation system of Transmission Line & Substation)

  • 백승도;김태영;민병욱;김왕주;최진성;김신철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.444-445
    • /
    • 2006
  • The proposed site selection for transmission system construction is applied by KEPCO's regulation of the site selection criteria and it is confirmed through the deliberation of site selection committee and talking with local authority, by means of study on Present status and site survey, to verify impediment of national land use and development plan. Therefore, it is true that KEPCO has difficulty in timely completion of power facility construction because of civil appeals due to insufficiently evaluate resistance factor of stakeholder and stubborn resistance of inhabitants. This paper describes the PEES(power effect estimation system) which contributed to timely completion of transmission system construction to solve the above difficulty by utilizing IT(Information Technology) such as GIS(Geographic Information System) and LiDAR for the proposed site section. PIES evaluates project impacts on commencement of construction and finds out counter measures then makes public construction information after prediction and analysis of stakeholder's resistance factor.

  • PDF

디지털변전소 배전선로 통합 IED용 Process bus 설계에 관한 연구 (A Study on the design of Process bus for distribution line integration IED in digital substation)

  • 김석곤;안용호;이남호;한정열;이유진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.53-54
    • /
    • 2015
  • 기존의 IEC 61850 표준 적용 국내 디지털변전소는 Station 레벨에 한정되어 구축되어 왔다. 향후 구축될 Process 레벨을 포함한 풀(Full) 디지털 변전소 디지털화는 디지털변전소 운전에 있어 중요하고 긴급한 신호인 Process bus를 통한 SV와 GOOSE신호의 전송으로 이루어지고 있다. Process bus를 활용한 배전선로 보호용 통합 IED는 GIS 등 변전소 전력설비로부터 전압과 전류 값을 MU(Merging Unit)를 통해 공급받아 각 구간의 Bay 혹은 Bank단위로 통합적인 보호 기능을 수행하고, 주 IED와 예비 IED가 서로의 상태를 상호 감시하여 보호기능의 이중화를 이루어야 하고, Sampled Value를 처리하기 위한 정밀한 시각동기화 기능을 갖추어야 한다. 만약, Process bus 시스템의 문제로 인해, 지연과 손실이 발생한다면 변전소 보호 제어에 영향을 줄 수 있으므로 Process bus를 디지털변전소에 적용하기 위해서는 Process bus 기반의 네트워크시스템에 연결된 MU와 IED가 송수신하는 SV와 GOOSE를 손실과 지연없이 전송할 수 있는지를 분석해야 한다. 본 연구에서는 디지털변전소 네트워크 시뮬레이션 시험을 통해, 배전선로용 통합 IED의 성능검증을 위해 Process bus 네트워크 시스템을 설계하고 시뮬레이션 시험을 수행하여 이를 통해 향후 국내의 Process bus 디지털변전시스템 구축을 위한 효과적인 네트워크 시스템 설계방법을 제시하고자 한다.

  • PDF

3차원 전계해석 기법을 이용한 GIS 삼상 일괄형 스페이서 고찰 (Three-dimensional Analysis for Three-phase Spacers in Gas Insulated System)

  • 강종성;이방욱;강성모;오일성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 C
    • /
    • pp.1620-1622
    • /
    • 2003
  • Recently, as the technology for the development of high voltage power apparatus using SF6 gas has made remarkable progress, it became possible to develop more compact power apparatus adopting single body substation system. In these gas insulated power apparatus, it is impossible to achieve perfect and safe insulation using only SF6 gas, because some solid insulation parts should be installed to support current-carrying conductor parts for electrical and mechanical safety. When spacers were installed in SF6 gas insulation system, they were exposed to severe electrical intensification which could reduce system insulation performance and restrict the rated operating voltage So, it is necessary to clarify the dielectric characteristics of spacers by analytically and experimentally, in order to design and develop more compact and optimum gas insulated systems. In this paper, the field distribution of three-phase spacers were investigated using three dimensional electrostatic field analysis tool adopting BEM method. And the obtained results were compared to the conventional two dimensional computations. According to these three dimensional calculations, it was possible to find out weak points in the spacer more clearly and these results could be applied to design more compact and optimum three phase spacer developments.

  • PDF

국내 초전도 한류기 요구와 하이브리드 초전도 한류기 (Domestic Efforts for SFCL Application and Hybrid SFCL)

  • 현옥배;김혜림;임성우;심정욱;박권배;오일성
    • Progress in Superconductivity
    • /
    • 제10권1호
    • /
    • pp.60-67
    • /
    • 2008
  • We present domestic efforts for superconducting fault current limiter (SFCL) application in the Korea Electric Power Corporation (KEPCO) grid and pending points at issue. KEPCO's decision to upgrade the 154 kV/22.9 kV main transformer from 60 MVA to 100 MVA cast a problem of high fault current in the 22.9 kV distribution lines. The grid planners supported adopting an SFCL to control the fault current. This environment friendly to SFCL application must be highly dependent upon the successful development of SFCL having specifications that domestic utility required. The required conditions are (1) small size of not greater than twice of 22.9 kV gas insulated switch-gear (GIS), (2) sustainability of current limitation without the line breaking by circuit breakers (CB) for maximum 1.5 seconds. Also, optionally, recommended is (3) the reclosing capability. Conventional resistive SFCLs do not meet (1) $\sim$ (3) all together. A hybrid SFCL is an excellent solution to meet the conditions. The hybrid SFCL consists of HTS SFCL components for fault detection and line commutation, a fast switch (FS) to break the primary path, and a limiter. This characteristic structure not only enables excellent current limiting performances and the reclosing capability, but also allows drastic reduction of HTS volume and small size of the cryostat, resulting in economic feasibility and compactness of the equipment. External current limiter also enables long term limitation since it is far less sensitive to heat generation than HTS. Semi-active operation is another advantage of the hybrid structure. We will discuss more pending points at issues such as maintenance-free long term operation, small size to accommodate the in-house substation, passive and active control, back-up plans, diagnosis, and so on.

  • PDF

동남아시아 송전철탑 풍하중 설계에 관한 연구 (A Study on the Wind Load Design for Transmission Tower in Southeast Asia)

  • 민병욱;최한열;박재웅;킨망우;노우소콘;쿠운
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.719-720
    • /
    • 2007
  • Korea, for the first time in the world, constructed 765 kV double circuits transmission lines, which has 3 phases and 6 bundles with vertical arrangement using steel pipes in 1998. Also in 2002, we developed 765kV outdoor full GIS substation with self-developed technology. KEPCO accumulated a wealth of technologies for 765kV system construction and operation, and are listed 5th in technology field in the world. With this advanced technologies, we are developing oversea business. We started with a projects, 'Development Study on the Power System Network Analysis in Myanmar' in 2001, and continued the project to transmission design, consulting for transmission technology including the education of foreign trainees in south-east and middle east asia. Currently, 12 overseas businesses including 330kV transmission system consulting in Ghana, are in progress. In 2007, beginning with 750 kV transmission consulting in China, we are operating ATT(Advanced Transmission Technology) training program, which educate engineers of government and utilities company from China, Myanmar, Cambodia, Laos and Cambodia. However, for the successful development study on the power system, design of the power system and the training service, it is essential to standardize load design criteria in consideration of temperature, wind speed, air pressure and density, etc. of the other countries. Therefore, in this paper, standardized load design criteria for Cambodia, Laos, Myanmar is explained.

  • PDF