• Title/Summary/Keyword: GIRDER

Search Result 2,097, Processing Time 0.032 seconds

Analytical Study of Ultimate Behavior of Steel Cable-stayed Bridges (완성계 강사장교의 극한 거동의 해석적 연구)

  • Kim, Seungjun;Im, Seok-Been;Lee, Kee-Sei;Kang, Young-Jong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.2A
    • /
    • pp.85-95
    • /
    • 2012
  • This paper presents an investigation on the ultimate behavior of steel cable-stayed bridges using nonlinear finite element analysis method. Cable-stayed bridges exhibit various geometric nonlinearities as well as material nonlinearities, so rational nonlinear finite element analysis should be performed for investigation of the ultimate behavior. In this study, ultimate behavior of steel cable-stayed bridges was studied using rational ultimate analysis method. Nonlinear equivalent truss element and nonlinear frame element were used for modeling the cable, girder and mast. Moreover, refined plastic hinge method was adopted for considering the material nonlinearity of steel members. In this study, the 2-step analysis method was used. Before live load analysis, initial shape analysis was performed in order to consider the dead load condition. For investigation of the ultimate behavior of steel cable-stayed bridges, analysis models which span length is 920.0 m were used. Radiating type and fan type were considered as the cable-arrangement types. With various quantitative evidences such as load-displacement curves, deformed shapes, locations of the yield point or region, bending moment distribution and so on, the ultimate behavior of steel cable-stayed bridges was investigated and described in this paper.

Estimation Method of Creep Coefficient in Concrete Structures (콘크리트 구조물에서 크리프 계수 추정 방법)

  • Park, Jong-Bum;Park, Jung-Il;Chang, Sung-Pil;Cho, Jae-Yeol
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.5
    • /
    • pp.619-628
    • /
    • 2009
  • To predict the time-dependent behavior of concrete structures, the models which describe the time-dependent characteristics of concrete, i.e. creep and shrinkage are required. However, there must be significant differences between the displacements that are obtained using the given creep and shrinkage models and the measured displacements, because of the uncertainties of creep and shrinkage model itself and those of environmental condition. There are some efforts to reduce these error or uncertainties by using the model which are obtained from creep test for the concrete in construction site. Nevertheless, the predicted values from this model may be still different from the actual values due to the same reason. This study aimed to propose a method of estimating the creep coefficient from the measured displacements of concrete structure, where creep model uncertainty factor was considered as an error factor of creep model. Numerical validation for double composite steel box and concrete beam showed desirable feasibility of the presented method. Consideration of the time-dependent characteristics of creep as one of the error factors make it possible to predict long-term behaviors of concrete structures more realistically, especially long-span PSC girder bridges and concrete cable-stayed bridges of which major problem is the geometry control under construction and maintenance.

Cable Adjustment of Composite Cable Stayed Bridge with Fuzzy Linear Regression Analysis (선형퍼지회귀분석기법을 이용한 합성형 사장교 케이블의 장력보정)

  • Kwon, Jang Sub;Chang, Seung Pil;Cho, Suh Kyoung
    • Journal of Korean Society of Steel Construction
    • /
    • v.9 no.4 s.33
    • /
    • pp.579-588
    • /
    • 1997
  • During the construction of cable stayed bridge, errors are always caused by various reasons, accumulated and amplified through the complex construction steps. It is likely that the undesirable stress distribution of members and the large deflection of the bridge different from design values come out The adjustment of cables during construction is absolutely indispensable to correct the stress distribution of the members and the geometrical configuration of the bridge. In the conventional method, weight coefficients are used to consider the difference of units between cable forces and girder deflections during the optimization process of cable adjustment. However, it is not easy to determine weight coefficients and the adjustment must be repeated several times with the time consuming process of the determination of new weight coefficients in case that errors are out of design allowable limits. In this paper, fuzzy linear regression analysis is applied to the cable adjustment to overcome those problems. In the application of fuzzy linear regression analysis method the designer's intention and the design allowable limits can be formulated in the form of the constraints of the linear optimization problem. Therefore, the cable adjustment in construction site can be carried out with the fuzzy linear regression analysis more rapidly than with the convetional method.

  • PDF

Change of Statical Behavior and Ultimate Capacity of Steel Cable-stayed Bridges after Cable Failure (케이블 단선 후 강사장교의 구조 및 극한 거동 변화)

  • Kim, Seung-Jun;Choi, Jun-Ho;Won, Deok-Hee;Han, Taek-Hee;Kang, Young-Jong
    • Journal of Korean Society of Steel Construction
    • /
    • v.23 no.6
    • /
    • pp.747-761
    • /
    • 2011
  • This paper presents an investigation on the change in the statical behavior and the ultimate capacity of steel cable-stayed bridges after cable failure. Cable failure can occur due to fire, direct vehicle clash accidents, cable or anchorage fatigue, and so on. Moreover, the cable may be temporarily disconnected during cable replacement work. When cable failure occurs, the load, that was supported by the broken cable is first transferred to another cable. Then the structural state changes due to the interaction between the girder, mast, and cables. Moreover, it can be predicted that the ultimate capacity will decrease after cable failure, because of the loss of the support system. In this study, the analysis method is suggested to find the new equilibrium state after cable failure based on the theory of nonlinear finite element analysis. Moreover, the ultimate analysis method is also suggested to analyze the ultimate behavior of live loads after cable failure. For a more rational analysis, a three-step analysis procedure is suggested and used, which consisted of initial shape analysis, cable failure analysis, and live load analysis. Using this analysis method, an analytical study was performed to investigate the changes in the structural state and ultimate behavior of steel cable-stayed bridges.

A Study on the Dynamic Strength Analysis of the Hull Girder Among Waves Considering Non-Linear Hydrodynamic forces (선박의 비선형 유체력을 고려한 파랑중 동적 강도 해석법에 관한 연구)

  • Ku-Kyun Shin;Sa-Soo Kim;Sung-Wan Son
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.29 no.4
    • /
    • pp.152-172
    • /
    • 1992
  • The ship sailing among waves are suffered the various wave loads that comes from its motion throughout its life. Because there are dynamic, the analysis of ship structure must be considered as the dynamic problem precisely. In the rationally-based design, the dynamic structural analysis is carried out using dynamic wave loads provided from the results of the ship mouton calculation as the rigid body. This method is based on the linear theory assumed low wave height and small amplitude of motion. But at the rough sea condition, high wave height, relatively ship's depth, is induced the large ship motion, so the ship section configulation below water line is rapidly changed at each time. This results in non-linear problem. Considering above situation in this paper, the strength analysis method is introduced for the hull glider among waves considering non-linear hydrodynamic forces. This paper considers that the overall or primary level of the ship structural dynamic loading and dynamic response provided from the non-linear wave forces, and bottom and bow flare impact forces estimated by momentum slamming theory, in which the ship is idealized as a hollow thin-walled box beam using thin-walled beam theory and the finite element method. This method is applied to 40,000 Ton Double-Skin Tanker and attention is paid to the influence of the response of ship speed, wave length and wave height compared with linear strip theory.

  • PDF

An Experimental Study on Joint Structures of Composite Truss Bridges (복합 트러스 교량의 연결구조에 대한 실험적 연구)

  • Shim, Chang Su;Park, Jae Sik;Kim, Kwang Soo
    • Journal of Korean Society of Steel Construction
    • /
    • v.19 no.3
    • /
    • pp.303-312
    • /
    • 2007
  • Steel box girder bridges are being commonly designed for medium-span bridges of span length. Composite truss bridges with steel diagonals instead of concrete webs can be an excellent design alternative, because it can reduce the dead weight of superstructures. One of the key issues in the design of composite truss bridges is the joint structureconnecting the diagonal steel members with the upper and lower concrete slabs. Because the connection has to carry concentrated combined loads and the design provisions for the joint are not clear, it is necessary to investigate the load transfer mechanism and the design methods for each limit state. There are various connection details according to the types of diagonal members. In this paper, the joint structure with group stud connectors welded on a gusset plate is used. Push-out tests for the group stud connectors of were performed. The test results showed that the current design codes on the ultimate strength ofthe stud connection can be used when the required minimum spacing of stud connectors is satisfied. Flexure-shear tests were conducted to verify the applicability of the design provisions for combined load effects to the strength of joint structures. To increase the pullout strength of the connection, bent studs were proposed and utilized for the edge studs in the group arrangement of the joint. The results showed that the details of the joint structure were enhanced. Thereafter, design guidelines were proposed.

Performance Improvement of Overpass Bridge by Weight Reduction (고가교 경량화에 따른 성능개선)

  • Kim, Sung Bae;Nam, Sang Hyeok;Kim, Jang-Ho Jay
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.51-60
    • /
    • 2011
  • In this study, structural safety capacity analysis of the overpass railway bridge between Konkuk Univ. and Guui station railroad has been performed. The overpass is expected to have suffered durability reduction by deterioration. The weight reduction of the overpass has been implemented to prevent further durability reduction and to improve performance capacity. To reduce the weight, 3 procedures of replacing concrete soundproofing wall to light-weight soundproofing wall, replacing gravel ballast to concrete ballast, and reducing the weight of trough have been performed. The analysis of static/dynamic behaviors and improved capacity of the light-weighted overpass bridge has been performed. The structural safety verification of the improved structure has been implemented by using rating factors of load carrying capacity of PSC I girder. The results have shown that the deflection has been reduced by 2.6mm and tensile strength has been improved by 1.07MPa, which indicate that the structural capacity has effectively been improved. Also, the natural frequency has improved by approximately 30% where vibration reduction and dynamic behavior improvement have been achieved. Moreover, in the rating factor evaluation based on analysis and test results, an improvement from 1.82 to 1.93 has been observed. Therefore, weight reduction method for the overpass is effective considering overall results.

Estimation of Design Wind Speed Compatible for Long-span Bridge in Western and Southern Sea (서남해안 장대교량에 적합한 설계 풍속 산정)

  • Kim, Han Soo;Lee, Hyun Ho;Cho, Doo Young;Park, Sun Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.153-160
    • /
    • 2011
  • Recently there are many long span cable supported bridges like Cable Stayed Bridge and Suspension Bridge already constructed or planned. Reconsidering of proper design wind load of long span bridge is required since the meteorological value based on the data only from 1960s to 1995 has been used when we estimate the wind load for designing long span bridges. In this paper, the research area was confined to western and southern coasts where many long span bridges have constructed. The method of moment and the least-squares method were used to estimate the expected wind speeds of 100 year's return period for girder bridges and for 200 year's return period for long span bridges based on the Gumbel's distribution. As the return-period wind speed on the land face was revised because of recent high speed velocity, the revised return-period wind speed is increased by 17%. Compatibility of return-period wind speed was also evaluated using RMS (Root Mean Square) error method. Aa a result of this paper, the least-squares method is more compatible than the method of moment in the case of western and southern coasts in Korea.

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

Magnetic Hysteresis Monitoring according to the Change of Tensile Force and Steel Class of PS Tendons (PS 텐던 강종별 긴장력 변화에 따른 자기이력 모니터링)

  • Kim, Junkyeong;Park, Seunghee;Lee, Hwanwoo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.31 no.2
    • /
    • pp.115-120
    • /
    • 2018
  • This paper introduces a magnetic hysteresis monitoring result to apply an EM sensing technique for estimating tensile force of PSC girder to various class of PS tendon. The tensile force of PS tendon is a very important factor in the performance evaluation of PSC bridges. However, in this time, the tensile force was just measured only during construction and it does not monitored after construction. To measure the tensile force of PS tendons, the EM sensing based NDT method was developed but the proposed method cannot be applied to various class of PS tendons. Thus this study performed the magnetic hysteresis measurement according to the tensile force for class B, C and D PS tendons through experimental study. The specific tensile forces(50, 100, 150, 180kN) were induced to the each specimens and the magnetic hysteresis curve was measured at each point. The permeability of specimens were gradually decreased according to increase of tensile force. Especially, the slopes of permeability variation of class B and C were similar while that of class D was different.