Abstract
During the construction of cable stayed bridge, errors are always caused by various reasons, accumulated and amplified through the complex construction steps. It is likely that the undesirable stress distribution of members and the large deflection of the bridge different from design values come out The adjustment of cables during construction is absolutely indispensable to correct the stress distribution of the members and the geometrical configuration of the bridge. In the conventional method, weight coefficients are used to consider the difference of units between cable forces and girder deflections during the optimization process of cable adjustment. However, it is not easy to determine weight coefficients and the adjustment must be repeated several times with the time consuming process of the determination of new weight coefficients in case that errors are out of design allowable limits. In this paper, fuzzy linear regression analysis is applied to the cable adjustment to overcome those problems. In the application of fuzzy linear regression analysis method the designer's intention and the design allowable limits can be formulated in the form of the constraints of the linear optimization problem. Therefore, the cable adjustment in construction site can be carried out with the fuzzy linear regression analysis more rapidly than with the convetional method.
사장교의 시공 특성상 여러 가지 원인에 의하여 오차가 발생하고, 복잡한 시공 과정을 거치는 동안 오차가 누적되어 점점 확대된다. 따라서, 설계와는 상당히 달리 부재에 불리한 응력분포와 교량의 과도한 처짐 등이 발생할 수 있다. 부재의 응력분포와 교량의 기하형상을 바람직한 방향으로 수정하기 위해 사장교의 시공 중에 케이블의 장력보정이 불가피하다. 기존의 장력보정 방법은 오차 단위의 차이를(케이블 장력과 주형의 처짐 등) 고려하기 위하여 최적화 과정 중에 가중치 계수를 사용하여야 한다. 하지만 이 가중치 계수를 결정하는 것이 쉽지 않고, 한 차례의 보정을 실시한 후에도 오차가 설계허용범위를 벗어날 때는 새로운 가중치 계수를 도입하여 여러 번 반복 수행해야하므로 상당한 시간이 요구된다. 본 연구에서는 이와 같은 점을 고려하여 선형퍼지회귀분석기법을 케이블 장력보정에 적용하였다. 이 방법은 설계자의 의도와 시방 규정을 선형최적화 문제의 구속 조건의 형태로 정식화 과정에 포함시킬 수 있고, 기존의 방법보다 빠르게 현장에서의 장력보정을 수행할 수 있다.