• Title/Summary/Keyword: Fuzzy linear programming

Search Result 64, Processing Time 0.022 seconds

Apply evolved grey-prediction scheme to structural building dynamic analysis

  • Z.Y. Chen;Yahui Meng;Ruei-Yuan Wang;Timothy Chen
    • Structural Engineering and Mechanics
    • /
    • v.90 no.1
    • /
    • pp.19-26
    • /
    • 2024
  • In recent years, an increasing number of experimental studies have shown that the practical application of mature active control systems requires consideration of robustness criteria in the design process, including the reduction of tracking errors, operational resistance to external disturbances, and measurement noise, as well as robustness and stability. Good uncertainty prediction is thus proposed to solve problems caused by poor parameter selection and to remove the effects of dynamic coupling between degrees of freedom (DOF) in nonlinear systems. To overcome the stability problem, this study develops an advanced adaptive predictive fuzzy controller, which not only solves the programming problem of determining system stability but also uses the law of linear matrix inequality (LMI) to modify the fuzzy problem. The following parameters are used to manipulate the fuzzy controller of the robotic system to improve its control performance. The simulations for system uncertainty in the controller design emphasized the use of acceleration feedback for practical reasons. The simulation results also show that the proposed H∞ controller has excellent performance and reliability, and the effectiveness of the LMI-based method is also recognized. Therefore, this dynamic control method is suitable for seismic protection of civil buildings. The objectives of this document are access to adequate, safe, and affordable housing and basic services, promotion of inclusive and sustainable urbanization, implementation of sustainable disaster-resilient construction, sustainable planning, and sustainable management of human settlements. Simulation results of linear and non-linear structures demonstrate the ability of this method to identify structures and their changes due to damage. Therefore, with the continuous development of artificial intelligence and fuzzy theory, it seems that this goal will be achieved in the near future.

Optimal Allocation Planning of Dispersed Generation Systems in Distribution System (배전계통에서 분산형전원의 최적설치 계획)

  • Kim, Kyu-Ho;Lee, Yu-Jeong;Rhee, Sang-Bong;Lee, Sang-Keun;You, Seok-Ku
    • Proceedings of the KIEE Conference
    • /
    • 2002.07a
    • /
    • pp.127-129
    • /
    • 2002
  • This paper presents a fuzzy-GA method to resolve dispersed generator placement for distribution systems. The problem formulation considers an objective to reduce power loss costs of distribution systems and the constraints with the number or size of dispersed generators and the deviation of the bus voltage. The main idea of solving fuzzy nonlinear goal programming is to transform the original objective function and constraints into the equivalent multi-objectives functions with fuzzy sets to evaluate their imprecise nature and solve the problem using the proposed genetic algorithm, without any transformation for this nonlinear problem to a linear model or other methods. The method proposed is applied to the sample systems to demonstrate its effectiveness.

  • PDF

Evaluation of Technical Efficiency with Fuzzy Data in the Korean RCC/RSC (퍼지환경하의 RCC/RSC별 운영효율성 평가)

  • Keum, Jong-Soo;Jang, Woon-Jae
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2006.11a
    • /
    • pp.253-258
    • /
    • 2006
  • This paper aims to measure and evaluates the technical efficiency with two inputs and four outputs with the use of fuzzy DEA(Data Envelopment Analysis) in Korean RCC(Rescue Co-ordination Center)/RSC(Rescue Sub-Center). Especially, this paper included not only the marine accident data which occurred for the analysis in particular but also the possibility data of a potential marine accident by an Environmental Stress value and analyzed the technical efficiency. And in this paper, asymmetrical triangular fuzzy number is presented about inputs/ outputs data and a procedure is suggest for it solution. The basic idea is to transform the fuzzy CCR model into a crisp linear programming problem by applying an alternative ${\alpha}-cut$ approach. Also this paper propose a ranking method for fuzzy RCC/RSC using presented fuzzy DEA approach. The result, when ${\alpha}-cut$ is 0.5, efficiency priority should be in order to YS, BS, MP, TS, JJ, PH, US, IC, SC, DR, GS, TA, WD RCC/RSC. Finally, Inefficiency TA, WD RCC/RSC have to benchmarking with reference sets.

  • PDF

Evaluation of Operation Efficiency in the Korean SRRs using Ranking of DMUs with Fuzzy Data (순위결정 퍼지DEA법을 이용한 수색구조구역의 운영효율성 평가)

  • Jang, Woon-Jae;Keum, Jong-Soo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.13 no.3
    • /
    • pp.207-212
    • /
    • 2007
  • This paper aims to measure and evaluate the technical efficiency with two inputs and four outputs with the use of fuzzy DEA in Korean RCC/RSC. Especially, this paper included not only the marine accident data which occurred for the analysis in particular but also the possibility data of a potential marine accident by an Environmental Stress value and analyzed the technical efficiency. And in this paper, asymmetrical triangular fuzzy number is presented about inputs/ outputs data and a procedure is suggested for it's solution. The basic idea is to transform the fuzzy CCR model into a crisp linear programming problem by applying an alternative ${\alpha}$-cut approach. Also this paper propose a ranking method for fuzzy RCC/RSC using presented fuzzy DEA approach. The result, when ${\alpha}$-cut is 0.5, efficiency priority is found in the order of YS, BS, MP, TY, JJ, PH, US, IC, SC, DH, GS, TA, WD RCC/RSC. Finally, Inefficiency TA, WD RCC/RSC have to benchmarking with reference sets.

  • PDF

Option of Network Flow Problem Considering Uncertain Arc Capacity Constraints (불확실한 arc용량제약식들을 고려한 네트워크문제의 최적화)

  • 박주녕;송서일
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.21
    • /
    • pp.51-60
    • /
    • 1990
  • In this paper we deal with the miniaml cost network flow problem with uncertain arc capacity constraints. When the arc capacities are fuzzy with linear L-R type membership function, using parametric programming procedure, we reduced it to the deterministic minimal cost network flow problem which can be solved by various typical network flow algorithms. A modified Algorithm using the Out-of-kilter algorithm is developed.

  • PDF

Fuzzy Optimal Reservoir Operation Considering Abnormal Flood (이상홍수를 고려한 퍼지 최적 저수지 운영)

  • Choi, Changwon;Yu, Myung Su;Yi, Jaeeung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4B
    • /
    • pp.221-232
    • /
    • 2012
  • In this study, the model enhancing the safety of reservoirs and reducing the downstream flood damage by reservoirs system operation during abnormal flood was developed. Linear programming was used for the optimal reservoirs system operation during an abnormal flood and fuzzy inference system was introduced to solve the uncertainty problem which is included in hydrological factors like inflow, water level and inflow variation of reservoir operation. The linear programming model determined the optimal reservoir system operation rules and could be used in situation where water demands varies rapidly during the abnormal flood events using fuzzy control technique. In this study, the optimal reservoirs system operation for Andong and Imha reservoirs located in the upper basin of Nakdong river was performed in order that the design flood discharge at Andong city would not be exceeded for the design flood of 100 year and PMF(Probable Maximum Flood). And the model that determines the release according to the downstream flow discharge, the reservoir storage, the inflow and the inflow variation of each reservoir was developed using the optimal system operation result and fuzzy control technique. The developed model consisted of 224 fuzzy rules according to the conditions of Andong reservoir, Imha reservoir and Andong city. And the release from each reservoir could be determined when the current data are used as input data through the developed GUI.

On the Minimax Disparity Obtaining OWA Operator Weights

  • Hong, Dug-Hun
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.19 no.2
    • /
    • pp.273-278
    • /
    • 2009
  • The determination of the associated weights in the theory of ordered weighted averaging (OWA) operators is one of the important issue. Recently, Wang and Parkan [Information Sciences 175 (2005) 20-29] proposed a minimax disparity approach for obtaining OWA operator weights and the approach is based on the solution of a linear program (LP) model for a given degree of orness. Recently, Liu [International Journal of Approximate Reasoning, accepted] showed that the minimum variance OWA problem of Fuller and Majlender [Fuzzy Sets and Systems 136 (2003) 203-215] and the minimax disparity OWA problem of Wang and Parkan always produce the same weight vector using the dual theory of linear programming. In this paper, we give an improved proof of the minimax disparity problem of Wang and Parkan while Liu's method is rather complicated. Our method gives the exact optimum solution of OWA operator weights for all levels of orness, $0\leq\alpha\leq1$, whose values are piecewise linear and continuous functions of $\alpha$.

Stability Analysis of Fuzzy Control Systems via Convex Optimization (볼록 최적화 기법을 이용한 퍼지 제어기의 안정도 해석)

  • Kim, Eun-Tai;Lee, Hee-Jin
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.38 no.6
    • /
    • pp.38-45
    • /
    • 2001
  • In this paper, numerical stability analysis methodology for the singleton-type linguistic fuzzy control systems is proposed. The proposed stability analysis is not the analytical method but the numerical method using the convex optimization of Quadratic Programming (QP) and Linear Matrix Inequalities (LMI). Finally, the applicability of the suggested methodology is highlighted via simulation results.

  • PDF

Evolutionary Nonlinear Regression Based Compensation Technique for Short-range Prediction of Wind Speed using Automatic Weather Station (AWS 지점별 기상데이타를 이용한 진화적 회귀분석 기반의 단기 풍속 예보 보정 기법)

  • Hyeon, Byeongyong;Lee, Yonghee;Seo, Kisung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.1
    • /
    • pp.107-112
    • /
    • 2015
  • This paper introduces an evolutionary nonlinear regression based compensation technique for the short-range prediction of wind speed using AWS(Automatic Weather Station) data. Development of an efficient MOS(Model Output Statistics) is necessary to correct systematic errors of the model, but a linear regression based MOS is hard to manage an irregular nature of weather prediction. In order to solve the problem, a nonlinear and symbolic regression method using GP(Genetic Programming) is suggested for a development of MOS wind forecast guidance. Also FCM(Fuzzy C-Means) clustering is adopted to mitigate bias of wind speed data. The purpose of this study is to evaluate the accuracy of the estimation by a GP based nonlinear MOS for 3 days prediction of wind speed in South Korean regions. This method is then compared to the UM model and has shown superior results. Data for 2007-2009, 2011 is used for training, and 2012 is used for testing.

Optimization of the Korean Nuclear Fuel Cycle Using Linear Programming (선형계획법을 이용한 한국 원전연료주기의 최적화)

  • Kim, J.I.;Chae, K.N.;Lee, B.W.
    • Nuclear Engineering and Technology
    • /
    • v.27 no.5
    • /
    • pp.721-729
    • /
    • 1995
  • The Korean optimal nuclear fuel cycle strategy from the year 2000 to 2030 is derived using linear programming. The fuel cycle cost, the cost uncertainty, and the natural uranium consumption are used as the criteria for the optimization. These objectives are compromised by fuzzy decision-making technique which maximizes the minimum degree of satisfaction among the three objectives. The options for the back-end fuel cycle are direct disposal, reprocessing, and DUPIC. The optimal fuel cycle strategy of Korea is to start reprocessing in around 2010 and increase its capacity with the maximum of 800 tHM in around 2025, and to star DUPIC processing in 2025. The cot uncertainty and the natural uranium consumption of the optimal fuel cycle strategy are reduced by 7.1% and 6.1%, respectively, at the cost penalty of 5.4% compared with the cost-only optimal solution.

  • PDF