• 제목/요약/키워드: Fuzzy assessment

검색결과 257건 처리시간 0.025초

공식안전평가시스템에 의한 선박 충돌사고 위험성 평가에 관한 연구( I ) (Risk Assessment of the Ship′s Collision using Formal Safety Assessment Methodology)

  • 양원재;전승환;금종수
    • 해양환경안전학회지
    • /
    • 제7권3호
    • /
    • pp.61-74
    • /
    • 2001
  • The prevention of marine accidents has been a major topic in marine society and various policies and countermeasures has been developed, applied to the industries. Formal Safety Assessment is a structured and systematic methodology, aimed at enhancing maritime safety, including protection of life, health, the marine environment and property, by using risk and cost-benefit assessments. In addition, it provides a means of being proactive, enabling potential hazards to be considered before a serious accident occurs. In this paper, we has been screening and ranking of hazards using fuzzy structural modeling method and quantitative risk assessment for the ship's collision in the last 10 years marine accidents.

  • PDF

불확실 상황에서 질산 폭로 평가 (Nitrate Exposure Assessment under Uncertainty)

  • 이용운
    • 환경영향평가
    • /
    • 제4권2호
    • /
    • pp.105-121
    • /
    • 1995
  • 지하수의 질산오염 문제는 한국을 포함한 세계의 여러나라에서 보고되어 왔다. 질산염은 청색증 유발물질로서 뿐만 아니라 발암물질일 가능성도 동물실험을 통해 제기되고 있다. 대부분의 경우에 지하수 질산염의 주요 오염원은 농작물 생산량의 향상을 위해 사용하는 비료이다. 그밖에 가축의 분뇨, 산업폐기물 및 생활하수도 지역에 띠라 질산염 오염원이 될 시기는 언제인가를 결정하기 위하여 의사결정권자는 여러가지의 작물경작방법에 따라 지하수 질산오염이 어떻게 변하는지를 시계열로 예측할 필요성이 있다. 그러나 직물경작방법에 따른 지하수 질산오염을 예측하는데 필요한 토질특성, 비료의 사용량, 작물의 종류 같은 자료의 대부분은 불확실성을 내포하고 있다. 이러한 불확실성은 경제성 때문에 자료의 불충분한 조사와 인간지식의 부족으로 인해 발생한다. 본 논문에서는 불확실성을 고려하면서 작물경작방법에 따른 지하수 질산오염의 변화를 예측하는 방법을 실제적인 사례를 통해 보여준다. 그리고 자료의 불확실성을 표현하기 위해 퍼지집합이론(fuzzy set theory)은 본 논문에서 응용되었다.

  • PDF

퍼지이론과 전문가 시스템을 이용한 철도 전력 설비의 고장률 평가와 유지보수 우선순위의 결정 (Estimation for Failure Rate of Railway Power Facility and Determination of Maintenance Priority Order using Fuzzy Theory and Expert System)

  • 이윤성;권기량;김진오;김형철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.495-504
    • /
    • 2009
  • As the Reliability Centered Maintenance(RCM) is being studied, maintenance tasks can be performed effectively through the Risk Priority Number(RPN) evaluation about the components in the system. The RPN is usually calculated through arithmetical operations of three values, Severity, Occurrence, and Detection for each facility. This RPN provides information that includes risk level of the facility and the priority order of maintenance tasks for facility. However, if there is no sufficient historical failure data, it is difficult to calculate the RPN. In this case, historical failure data from other sources can be used and apply this data to korean railway system. In this paper, it is proposed that a new methodology to model the failure rate as a fuzzy membership function. This method is based on failure data from other sources by means of the fuzzy theory and the expert opinion system. And considering assessment tendency of each expert, distortions that happened when the failure rate of facilities is estimated were minimized. This results determine Occurrence values of facilities. Taking advantage of this result., the RPN can be calculated with Severity and Detection of facilities by using the fuzzy operation. The proposed method is applied the rail-way power substation.

  • PDF

언어 값을 다루기 위한 알고리즘적인 접근법 (Algorithmic approach for handling linguistic values)

  • 최대영
    • 정보처리학회논문지B
    • /
    • 제12B권2호
    • /
    • pp.203-208
    • /
    • 2005
  • 같은 언어 변수에서 정의된 인접 언어 값을 다루기 위한 알고리즘을 제안하였다. 제안된 방법을 사용해서 인접 언어 값에 대한 개인의 주관성의 차이를 명확히 발견할 수 있다. 제안된 방법은 같은 언어 변수에서 정의된 인접 언어 값들 사이의 숨겨진 관계를 발견하기 위한 유용한 도구로 이용될 수 있다. 결과적으로 제안된 방법은 퍼지 전문가시스템, 퍼지 의사결정 트리, 퍼지 인지 지도등과 같은 퍼지 시스템 개발 분야에서 지식 획득의 정확성을 개선하기 위한 기초를 제공해 줄 수 있다. 본 논문에서 제안된 방법을 다수의 전문가들 사이의 집단 언어 평가에 적용하였다.

퍼지-FMEA기법을 이용한 차량탑재형 고소작업대 사고의 주요 유해위험요소 위험우선순위 결정 (Determination of Critical Hazard Factors in Vehicle-Mounted MEWP using Fuzzy-FMEA)

  • 오세윤;이강돈;신재호;임재용
    • 한국안전학회지
    • /
    • 제38권1호
    • /
    • pp.9-17
    • /
    • 2023
  • In this study, we aimed to identify the important hazard factors and determine their criticality in causing serious accidents in vehicle-mounted mobile elevated work platforms (MEWPs). Fuzzy failure modes and effects analysis (FMEA)was performed using accident data and a survey of experts. To determine the hazard factors, the accident data for the last 10 years were used and a questionnaire survey was designed. The questionnaire survey was sent to four experts in the field of occupational safety to determine the severity, occurrence, and detectability of serious accidents in MEWPs. Furthermore, objective RPN scores and risk priority were obtained using fuzzy FMEA. Finally, the criticality of hazard factors in descending order was found to be overloading, non-installation or defective installation of outriggers, breakage due to wire rope aging, and illegal remodeling of vehicle structures. The results were verified by comparing the occurrence data of serious disasters.

Health monitoring of pressurized pipelines by finite element method using meta-heuristic algorithms along with error sensitivity assessment

  • Amirmohammad Jahan;Mahdi Mollazadeh;Abolfazl Akbarpour;Mohsen Khatibinia
    • Structural Engineering and Mechanics
    • /
    • 제87권3호
    • /
    • pp.211-219
    • /
    • 2023
  • The structural health of a pipeline is usually assessed by visual inspection. In addition to the fact that this method is expensive and time consuming, inspection of the whole structure is not possible due to limited access to some points. Therefore, adopting a damage detection method without the mentioned limitations is important in order to increase the safety of the structure. In recent years, vibration-based methods have been used to detect damage. These methods detect structural defects based on the fact that the dynamic responses of the structure will change due to damage existence. Therefore, the location and extent of damage, before and after the damage, are determined. In this study, fuzzy genetic algorithm has been used to monitor the structural health of the pipeline to create a fuzzy automated system and all kinds of possible failure scenarios that can occur for the structure. For this purpose, the results of an experimental model have been used. Its numerical model is generated in ABAQUS software and the results of the analysis are used in the fuzzy genetic algorithm. Results show that the system is more accurate in detecting high-intensity damages, and the use of higher frequency modes helps to increase accuracy. Moreover, the system considers the damage in symmetric regions with the same degree of membership. To deal with the uncertainties, some error values are added, which are observed to be negligible up to 10% of the error.

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • 제28권6호
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

퍼지로직과 DEA를 이용한 RCC/RSC별 운영효율성 평가 (Evaluation of Operation Efficiency in the Korean RCC/RSC Using Fuzzy-Logic and DEA)

  • 장운재;금종수
    • 해양환경안전학회지
    • /
    • 제12권4호
    • /
    • pp.233-239
    • /
    • 2006
  • 본 연구는 우리나라 RCC/RSC의 효율성을 2개의 투입자료와 4개의 산출자료를 이용하여 DEA법을 이용하여 측정하였고, 정성적 자료는 전문가의 설문 및 면접결과로 평가하였다. 또한, 이러한 자료를 통합하기 위한 방법은 의사결정지원시스템인 퍼지로직을 적용하였고, 이 평가방법을 이용하여 RCC/RSC의 운영효율성의 우선순위를 평가하였다. 그 결과 목포, 제주, 부산, 통영, 인천, 여수, 동해, 울산, 포항, 속초, 태안, 완도, 군산RSC 순으로 효율성이 높은 것으로 나타났다.

  • PDF

밀도함수를 이용한 근사적 퍼지 클러스처링 (Approximate Fuzzy Clustering Based on Density Functions)

  • 권석호;손세호
    • 한국지능시스템학회논문지
    • /
    • 제10권4호
    • /
    • pp.285-292
    • /
    • 2000
  • 자료 분석 과정을 살펴 보면 1) 자료가 갖는 경향 평가, 2) 클러스터 분석, 3) 클러스터의 타당성 조사라는 과정을 거쳐 이루어진다. 이 분석법은 2) 및 3) 단계의 반복 수행으로 인하여 많은 계산 시간이 소요되므로 비효율적인 방법이라 할 수 있다. 본 논문에서는, 이와 같은 단점을 보완하기 위하여 자료가 갖는 개략적 특성을 파악하여 자료 속에 존재하는 클러스터의 근사적 개수 및 중심을 정한 후, 이 정보를 기존의 일반적인 퍼지 클러스터링 알고리즘에 입력하여 클러스터링을 수행하는 밀도함수를 이용한 계층적 구조의 근사적 클러스터링 알고리즘을 제안하고, 예제를 통하여 제안된 알고리즘의 타당성을 보인다.

  • PDF

요양보호사의 서비스평가에 대한 퍼지적 접근 (A Fuzzy Approach to Evaluation of Home-helper's Service)

  • 장윤정
    • 한국지능시스템학회논문지
    • /
    • 제21권1호
    • /
    • pp.62-67
    • /
    • 2011
  • 본 연구는 요양보호사의 서비스평가에 관련된 요인을 파악하고자 한다. 나아가 퍼지ID3를 이용한 패턴분석을 통해 서비스 평가 수준을 결정하는 일정한 룰을 발견하여 요양보호서비스의 질을 높이기 위한 방안을 제시하고자 한다. 요양보호사 230명의 설문지를 분석한 결과, 요양보호사의 서비스평가에는 요양서비스를 제공하는데 필요한 지식 및 기술과 담당하고 있는 이용자의 정보파악이 통계적으로 유의미한 관계가 있다는 것을 알 수 있었다. 한편, 퍼지 ID3를 이용한 패턴분석에 의하면 요양보호사의 지식 및 기술수준이 상대적으로 낮다고 하더라도 이용자정보 파악 수준이 높으면 서비스평가 수준이 높다는 것을 알 수 있었다. 따라서 본 연구에 의하면 요양보호사의 서비스평가에는 지식 및 기술 보다 이용자정보 파악이 보다 중요한 변인이라는 사실이 시사되었다.