• 제목/요약/키워드: Future contract

검색결과 242건 처리시간 0.028초

베스팅계약 전력시장에서 선물 최적헷지전략 연구 (Optimal Hedge Strategy Using Future Contract in the Vesting Contract Electricity Market)

  • 맹근호;송광재;박종근
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권7호
    • /
    • pp.414-419
    • /
    • 2004
  • In TWBP new uncertainty will be increased. Risk management is risen to a important problem. Vesting contract makes market Players trade at fixed price in TWBP early stages. In the case of advanced country, market players manage risk with a future contract. When a risk management method moves from vesting contract to future contract, it may have to use together two contracts for schedule period. In this paper, risk management strategy that use vesting contract and forward contract at the same time is proposed.

위탁급식 업체선정에 영향 미치는 요인에 대한 고객사의 중요도 인식 조사 (A Study of the Client′s Importance Perception on the Factors Affecting the Foodservice Management Contract)

  • 김현아;양일선;이보숙;박진영
    • Journal of Nutrition and Health
    • /
    • 제37권5호
    • /
    • pp.406-414
    • /
    • 2004
  • The purposes of this study were 1) to investigate the importance level on factors affecting the foodservice management contract perceived by the clients in the office building, government and public offices and manufacturing company in Seoul and Kyungi 2) to compare the perceived importance levels of the present contract and future contract 3) to compare the perceived importance levels of the competitive bid with those of the private contract. To collect the data on the perceived importance level on the affecting the foodservice management contract, the questionnaires were developed by the delphi technique and modified by the pilot test. The questionnaires consisted of 4 categories and 19 items on the factors affecting the foodservice management contract and the importance level on the factors were measured by 5-likert scale. From March 12 to April 13 in 2003, the self-administrative questionnaires were mailed to 280 clients. The questionnaires were responded from the 50 clients (respondent rate: 25%). On the factors affecting the present contract and the future contract, among the 4 categories (the appropriateness of foodservice operation plan, the evaluation of the foodservice company, sales ability, the conditions of the cost in the contract), the importance level of the appropriateness of foodservice operation plan was higher than those of the other categories. In the comparison of the perceived importance level between the present contract and the future contract, the importance level of 4 items (sanitation and safety management plan, menu management plan, service management plan, food cost per meal) in the future contract were significantly higher than those in the present contract (p<.01, p<.05, p<.05, p<.01). There were the significant differences between the private contract and competitive bid on the factors affecting the present contract in the 3 items, which were $\ulcorner$renewal plan for interior and environment$\lrcorner$, $\ulcorner$strategic alliance with the contractor$\lrcorner$, $\ulcorner$lobby of the foodservice company$\lrcorner$ (p<.05, p<.05, p<.05). And on the factors affecting the future contract, there were significant differences in the 2 items, which were $\ulcorner$renewal plan for interior and environment$\lrcorner$and $\ulcorner$cost per meal$\lrcorner$in comparing the competitive bid and private contract (p<.05, p<.01). The clients perceived the appropriateness of foodservice operation plan was more important than the other categories in the future foodservice management contract. It was proposed that the foodservice management contract company should focus on the foodservice operation to satisfy the customers and clients in order to get more contract in the future.

ARIMA 수요자정을 고려한 장기보충계약 (A Long-term Replenishment Contract for the ARIMA Demand Process)

  • 김종수;정봉룡
    • 한국산업경영시스템학회:학술대회논문집
    • /
    • 한국산업경영시스템학회 2002년도 춘계학술대회
    • /
    • pp.343-348
    • /
    • 2002
  • We are concerned with a long-term replenishment contract for the ARIMA demand process in a supply chain. The chain is composed of one supplier, one buyer and consumers for a product. The replenishment contract is based upon the well-known (s, Q) policy but allows us to contract future replenishments at a time with a price discount. Due to the larger forecast error of future demand, the buyer should keep a higher level of safety stock to provide the same level of service as the usual (s, Q) policy. However, the buyer can reduce his purchase cost by ordering a larger quantity at a discounted price. Hence, there exists a trade-off between the price discount and the inventory holding cost. For the ARIMA demand process, we present a model for the contract and an algorithm to find the number of the future replenishments. Numerical experiments show that the proposed algorithm is efficient and accurate.

  • PDF

A Future Contraction Effect in Intertemporal Choice for Durable Goods

  • Kim, Byung Kyu
    • Asia Marketing Journal
    • /
    • 제20권2호
    • /
    • pp.29-40
    • /
    • 2018
  • Recent research reported that perception of future time is non-linearly scaled. That is, as objective time gets longer, subjective perception of the objective time does not grow proportionally. The non-linear time perception implies that the same future time feels shorter when it starts in the future than when it starts immediately. The authors call this as a future contraction effect. The current research tests two important implications of the effect regarding consumers' intertemporal preference for durable goods. First, consumers who contract future more will be more impatient for durable goods compared to those who contract less because the former would feel to use the same durable goods longer when it is purchased immediately. Second, consumers' impatience will be alleviated when their tendency to contract future is reduced. The authors find support for these predictions through two studies. Taken together, the current research demonstrates a property of time perception that has important ramifications for understanding consumers' intertemporal preference for durable goods.

국제거래(國際去來)에서 전자계약(電子契約) 성립(成立)의 장애요인(障碍要因)에 관한 연구(硏究) (A Study on the Obstacles of international Contract in Electronic Commerce)

  • 서백현
    • 통상정보연구
    • /
    • 제5권2호
    • /
    • pp.207-225
    • /
    • 2003
  • The purpose of this study is to examine the legal aspects on the formation of international contract in electronic commerce. The findings could be summarized as follows. rug, the contract doctrine of the contract formation by electronic data message, time of dispatch and receipt of data message, error in electronic communication, contract form and electronic signature could be supported or protected by the existing contract doctrine. Second, In relation to the contract formation arranged by electronic agents, the established contract doctrine provides no clear answer to the question whether changes provided by the interaction of electronic agents are enforceable. The enforceability question is left to future legislation. Finally, It is necessary that a significant level of formality together with the disclosure on the contract formality by certain act be conveyed 10 a potential buyer so that the buyer is impressed that the contact by the certain act could be valid.

  • PDF

가상기업 구현을 위한 계약중개 자동화 시스템의 설계 (Design of An Automated Contract Match-making System for VE Implementation)

  • 정동길
    • 한국전자거래학회지
    • /
    • 제6권1호
    • /
    • pp.1-16
    • /
    • 2001
  • This paper describes a preliminary investigation of contracts with a view towards automating the process of contract match-making. A novel approach based on exploiting Standard Form Contracts(SFC) is described. The approach is shown to be implementable with current technology. A second approach based on Standard Contract Clauses(SCC) which overcomes some of the limitations of Standard Form Contracts, is briefly outlined. The flexibility offered by this approach however, is accompanied by a considerable increase in the complexity of contract match-making. Both Standard Form Contracts and Standard Contract Clauses based match-making point towards an exciting area of future research.

  • PDF

Review of Revenue Sharing Contract: Evaluating its Role for Supply Chain Coordination

  • RYU, Chungsuk
    • 산경연구논집
    • /
    • 제13권3호
    • /
    • pp.1-12
    • /
    • 2022
  • Purpose: The revenue sharing contract has been widely used in industries, and its ability to coordinate the supply chain system has been studied by numerous researchers. By reviewing the representative studies on the revenue sharing contract, this study intends to analyze the key features of this coordinating contract and identify its potential to be a more advanced coordination program than the original contract. Research design, data, and methodology: This study reviews past studies on the revenue sharing contract. The selected studies are investigated with a focus on how this contract is described to realize the supply chain coordination and the key issues that they address. Results: The literature review reveals that the revenue sharing contract requires standardized details about what and how to share. This study also finds additional issues that need to be addressed by researchers to improve this coordinating contract. Conclusions: Future researchers are advised to unify the detailed contents of the revenue sharing contract to confirm that it successfully coordinates the supply chain system. In addition, this study proposes key research issues that would enhance the role of revenue sharing contract as a supply chain coordination program.

Basic Research on Nuclear Power Plant Construction Claims and Dispute Management Processes Development

  • Son, HyeJin;Lee, SangHyun;Byon, SuJin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.710-711
    • /
    • 2015
  • A nuclear power plant construction is a complex form of construction which comprises various stakeholders and contractors. Therefore, contract disputes will occur due to conflicting interests of contracting parties and unpredictable factors which arise during construction work. Even if the contract is well prepared, it cannot fully prepare for future situations in actuality. Claims management is very important in carrying out construction management. This study intends to define claim, and delve into development of claims management processes from the viewpoint of owners and contractor through consideration on international contract terms on claims management and the details of the claims management of the Construction Extension to the PMBOK. In addition, it is needed to accumulate and manage data on claims that have occurred so that they can be referenced in the future. As information should be accumulated so that type classification can be carried out and that lessons can be learned on claims that have occurred in each business site, study on establishing data-based systems relating to claims processes will be needed in the future.

  • PDF

A Study on Performance Analyses of Korea's Bidding and Contract Systems for Public Construction Projects

  • Beak, Seung-Ho;Kang, Tai-Kyung;Park, Wonyoung;Lee, Yoo-Sub
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권3호
    • /
    • pp.18-28
    • /
    • 2015
  • Bidding and contract systems are used for public construction projects to select contractors following fair competition principles and to execute national budgets effectively. Many challenges have arisen due to a lack of transparency and fairness and because bidding practices have been luck-based. Few comprehensive or comparative analyses have been conducted on the performance and limitations of bidding and contract systems, and empirical analyses designed to improve policies on and the practice of such systems are lacking. This study empirically analyzed current bidding and contract systems to seek ways of improving them. The study proposes several alternatives to resolve the problems with and irrationalities of the current system: 1) improving bidding and selection systems by changing them from a luck-based price competition into a technical merit- and value-based competition; 2) improving the assessment criteria to meet the current market level of bid and winning prices; 3) adjusting contractual responsibilities and sharing structures to meet the current trend; and 4) strengthening the competitiveness and expanding the social responsibility-based procurement systems of construction companies.

시스템 다이나믹스를 이용한 부에노스아이레스 수도사업 양여계약사례의 고찰 (Reviewing Contract of the Buenosaires Water Concession Case with System Dynamics)

  • 이상은;차동훈;박희경
    • 상하수도학회지
    • /
    • 제20권1호
    • /
    • pp.104-114
    • /
    • 2006
  • Recently, the PPP (Public-Private-Participate) program on water and wastewater services in Korea has been under an active debate. However, the controversy has reached the limits of getting more valuable implications from past foreign experience beyond conceptual and/or qualitative case studies. This paper analyze scientifically and quantitatively the Buenos Aires Water Concession Project focused on propriety of the contract using system dynamics modeling. The results show that Buenos Aires's Project has several problems in the contract phase even though Argentina government spent much time to design it. Analysis results suggest that estimation of K factor considering delay effect and future uncertainty, reduction of the first fixed terms of contract, etc., are needed for a proper contract.