The magnitude of constraint effect $A_2$ value was experimentally estimated by using crack tip opening displacement(CTOD) between elastic and plastic regions near crack tip front for CT specimen with $25.4t{\ss}{\AE}$ SS400 steel. The constraint effect, $A_2$ was dependent on specimen configuration and on the measured positions of CTOD near crack front. $A_2$ should be estimated using the opening displacement calculated within crack front plastic region. If not, it's not reliable to evaluate of constraint effect at crack growth initiation in this paper.
Journal of Advanced Marine Engineering and Technology
/
v.33
no.4
/
pp.533-538
/
2009
The magnitude of constraint effect $A_2$ values on the non-linear elastic plastic fracture toughness was experimentally estimated by using displacement at various measuring positions near crack tip. Constraint effect $A_2$ value was dependent on specimen configuration and on the measured displacement near crack front. The crack tip opening displacement in the vicinity of the crack tip front should be estimated within plastic region when appropriately constraint effect was calculated. It was found that the magnitude of constrain effect |$A_2$| is below 8.0 at the crack tip. But an appropriate location to measure the effective constraint effects $A_2$ at the critical value of J that crack initiation is characterizable by is r = 2mm and ${\theta}=90^{\circ}$ away from original crack tip, and the constraint effect |$A_2$| estimated is 5.3.
Nowadays many urban subways are frequently constructed under the building and the river by the use of tunneling method. Especially, the majority of the tunnel are constructed even with shallow depth under the ground in the weathered soil. Since the tunnel are generally designed on the basis of the geographic soil investigation, the stability of the tunnel should be checked with the realistic data instrumented during construction. The displacement of the tunnel occurs in front of the end face during the excavation of the tunnel, which is called as pre-displacement. The total displacement can be figured from the exact pre-displacement, which is very difficult to measure without using any device installed in front of the tunnel end face. In this study, the pre-displacement measured from horizontal inclinometer was analyzed to know the co-relation with the total displacement and also, the trend and the characteristics of the tunnel deformation during construction was suggested through the regression analysis of the measured data.
The magnitude of constraint effect $A_{2}$ values were experimentally estimated using displacement according to measuring positions on the non-linear elastic plastic fracture toughness estimate. For 25.4 mm thickness SS400 steel CT specimen, constraint effect $A_{2}$ values we re dependent on specimen configuration and on measured displacement near crack front. Commonly, Estimating constraint effect $A_{2}$ measuring position for displacement should be existed inside plastic region. Therefore, the ${\delta}_{5}$ method was not reliable for evaluation of constraint effect $A_{2}$ values because measuring position for displacement is in elastic region at crack growth initiation in this paper.
Journal of the Korean Society of Manufacturing Technology Engineers
/
v.20
no.3
/
pp.280-283
/
2011
This study investigates the durability of car body and the safety of passenger inside car body in the case of the impact contact at passenger and car body. In case of front impact contact, maximum von Mises equivalent stress and principal stress become 3240.7MPa and 1634MPa respectively at the rear part of car body and the neck of dummy. And maximum total deformation occurred with 14.145mm at the hand of dummy. In case of side impact contact, maximum von Mises equivalent stress and principal stress become 7687.9MPa and 1690.7MPa respectively at the front part of car body and the lap of dummy. And maximum total deformation occurred with 16.414 mm at the foot of dummy. In case of rear impact contact, maximum von Mises equivalent stress and principal stress become 2366.6MPa and 1447MPa respectively at the front part of car body and the neck of dummy. And maximum total deformation occurred with 7.548mm at the rear part of car body. As the maximum von-Mises stress at side impact is shown with more than 700MPa as over two times at front or rear impact the danger of car body is increased. The great possibility of damage is shown at neck and hand of dummy with more than total displacement of 10mm.
The Inclined Earth Retaining Structure (IER) is the structure using an integrated system of both front supports and inclined back supports to increase the stability for excavation. The IER is a structurally stable temporary excavation method using the back supports restraining the lateral displacement of the front supports as stabilizing piles. The back supports connected to the front supports significantly reduce the earth pressure acting on both the front wall and the front supports by distributing it to the back supports in order to increase the structural stability. In this study, mechanical behaviors of IER according to the head connection type using fixed- or hinge-connection were found by performing numerical analysis and laboratory model tests in the sandy ground. The maximum lateral displacement of fixed-connection was 88% of that of hinge-connection in the numerical analysis. The lateral displacement of fixed-connection was 7% of that of hinge-connection in the laboratory model test results. Furthermore, the earth pressure of the fixed-connection was 67% of that of the hinge-connection in the shear-strain analysis results of the model ground.
We analysed the affection to subgrade that railway underground crossing construction make with studying displacement of subgrade of each construction methods and processing of Front jacking method and Pipe roof method with already-measured data(during the construction) and additionally-measured field test data in railway underground crossing construction. We measured vertical and horizontal displacement at two construction places of front jacking method and pipe roof method each, and we analysed the results of the measurement at each stage of construction to applied to the excution of construction.
The purposes of this study to provide quantitative data in necessary to advance techniques kinematic analysis of Cucarachas which is an action of Rumba. Then, this study is performed on 5 female players who have won within the third prize at a national athletic meeting. When whole foot reached to floor, Displacement of right-left hip joint (until $E1{\sim}E3$ average moved 15.15cm)is found at right-left direction since the hip joint is turned to right back. On the other side, large displacement is shown because Rumba Cucaracha Movement is expressed by maximum shift of hip joint to right and left direction. Displacement of right hip joint(E3$57.40{\pm}7.46$) is found in front and in rear direction since hip joint is moved in rear and in front to turn the hip joint. It may be stated that this is ideal displacement expressed by movement of whole body with artistic poise and presentation because role of hip joint is very important in technical and artistic side. Angle of right shoulder joint E2($105.44{\pm}9.64$) is got wider. It may be stated that player shifts up and abduct elbow joint to right since center of gravity of player is exceedingly shifted to right in this motion of Cucarachas. On the other hand, since this motion is abducted right elbow and shrunk external abdominal oblique to him center of body to left front of hip joint, the angle becomes narrow. It is shown that angle of knee in right knee joint E4($75.44{\pm}2.61$) is large since right leg and hip joint is turned by foot using reaction of ground and so center of body is shifted to left. Large angle of ankle E4($134.40{\pm}10.50$) in Cucaracha Movement is shown by the action of twist force using narrow part of foot and compression force against ground with adduction speed of arm. The various kinematic analyses associated with motions of dance sport have not been sufficiently peformed so far, and thus a number of research projects for dance sport should be proposed and performed to be continuous.
Journal of Korean Tunnelling and Underground Space Association
/
v.8
no.2
/
pp.101-113
/
2006
Arching effect occurs around the unsupported excavation surface near to tunnel face when a tunnel is excavated in a stable rock mass. If a weak fracture zone exists in front of tunnel face, a displacement occurs between tunnel face and weak fracture zone due to stress concentration. If three-dimensional absolute coordinates (longitudinal, transverse, vertical direction) is measured at tunnel face by geodetic method, the ground change in front of the tunnel face can be predicted by analysing three-dimensional absolute displacement. The purpose of this study is to verify the analysis method of three-dimensional absolute displacement by comparing the trend of displacement ratio at crown and sidewall of tunnel and the influence line/trend line of crown settlement compared with TSP results in the same section.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.