• Title/Summary/Keyword: FrameWork

Search Result 805, Processing Time 0.029 seconds

Shape Optimal Design to Minimize the Weight of a Mask-Frame for OLED Vapor Deposition (OLED 증착용 마스크 프레임의 무게 최소화를 위한 형상최적설계)

  • Lee, Boo-Youn
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.10
    • /
    • pp.4685-4693
    • /
    • 2013
  • Present work deals with a shape optimal design to minimize the weight of the mask-frame used in the process of OLED vapor deposition by the fine metal mask. A design concept for an optimal shape of the frame to increase the stiffness and to reduce the weight is derived using the topology optimization, shape design variables of the frame by adopting slots being defined. An optimal shape is determined by solving the shape optimization problem to minimize the weight of the frame under constraints of the maximum displacement. Weight of the optimal design is 117.6 kg, which is reduced by 138.4 kg(54.1%) of that of the first design, 256 kg.

Improvement of the PVC Window Frame Installation Method Integrated with Gangform and Field Applicability Analysis

  • Choi, Hyo-Sung;Lee, Jeong-Ho;Yoo, Huyn-Seok;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.482-500
    • /
    • 2011
  • In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.

Case Studies: Schedule Delay Factors and Delay Prevention Program for Concrete Frame Works in Apartment Construction Project (사례분석을 통한 아파트 골조공사의 공기지연 요인 도출 및 개선방안)

  • Cho, Tae-Jea;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.9-17
    • /
    • 2011
  • Project delay is one of the most crucial impact factors in the construction process from a schedule and cost management perspective. This study focused on analyzing the causes of concrete frame work delay in the apartment construction project. According to the analysis of project cost composition, the direct cost of concrete works was highest in most samples. Actual delays of concrete works were analyzed for the six different construction components. Causes of delay were grouped into two categories; preconstruction and construction phases and these two groups were further divided into sub-groups. Analysis results revealed that the most significant delay was occurred in the 1st. floor concrete skeleton work. For each delay factor, implications of delay as well as suggestion(s) for reducing the possibility of schedule delay are provided.

A Study on a design for an interior space accompanied by an using pattern in behaving As a family types in housing space (주거공간 내 가족유형별 사용행태에 따른 실내공간계획에 관한 연구)

  • 이병영;최경란
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2003.05a
    • /
    • pp.117-122
    • /
    • 2003
  • This study deals with apartments, the representative form of residence in Korea, and analyzes the residential plane of 30-pyong apartments that are constructed by the 5 construction companies within in the past three years. It is discovered that these apartments show a certain form and that developing the frame work of interior elements according to the characteristics of family types of 30-pyong apartment residents and the process for such a frame work are needed. Therefore, by analyzing the differences of residential forms according to resident types, this investigation tries to approach the design centering around users. To summarize the steps and contents of this study, first, it draws the understanding and the study field of common residential space, second, it shows the characteristics of family types within residential space, third, it analyzes and verifies the differences of characteristics according to family types within the representative size and form of plane. This investigation is aimed to provide the reasons for developing different planes according to family types despite they may be of the same size, to show the frame of the study method for developing the plane design and the interior element design for users and to suggest the way of designing residence in a conditional approach applying the conditions of users within common residential space.

  • PDF

Appropriate Package Structure to Improve Reliability of IC Pattern in Memory Devices (메모리 반도체 회로 손상의 예방을 위한 패키지 구조 개선에 관한 연구)

  • 이성민
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2002.07a
    • /
    • pp.32-35
    • /
    • 2002
  • The work focuses on the development of a Cu lead-frame with a single-sided adhesive tape for cost reduction and reliability improvement of LOC (lead on chip) package products, which are widely used for the plastic-encapsulation of memory chips. Most of memory chips are assembled by the LOC packaging process where the top surface of the chip is directly attached to the area of the lead-frame with a double-sided adhesive tape. However, since the lower adhesive layer of the double-sided adhesive tape reveals the disparity in the coefficient of thermal expansion from the silicon chip by more than 20 times, it often causes thermal displacement-induced damage of the IC pattern on the active chip surface during the reliability test. So, in order to solve these problems, in the resent work, the double-sided adhesive tape is replaced by a single-sided adhesive tape. The single-sided adhesive tape does net include the lower adhesive layer but instead, uses adhesive materials, which are filled in clear holes of the base film, just for the attachment of the lead-frame to the top surface of the memory chip. Since thermal expansion of the adhesive materials can be accommodated by the base film, memory product packaged using the lead-flame with the single-sided adhesive tape is shown to have much improved reliability. Author allied this invention to the Korea Patent Office for a patent (4-2000-00097-9).

  • PDF

Development of Revegetation Technique for Water Attacking Point Using Waterlogged Prevention Frame Revetment (침수방틀을 이용한 자연형 하천의 수충부 녹화공법 개발)

  • Moon, Seok Ki;Lee, Eun Yeob;Han, Sung Sik;Lee, Ki Joon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.4 no.1
    • /
    • pp.98-109
    • /
    • 2001
  • This study aimed to investigate the effect of revegetation technique for water attacking point using waterlogged prevention frame revetment. In this study, we evaluate frame revetment stability, water quality, plant growth and ecological and envirnomental changes in Mooshim streamside landscape. The results are as follows; 1) The waterlogged prevention frame revetment appeared to be stable despite of two big floods. The materials used for the revetment were not eroded on the water attacking point. Thus, we confirmed the effect of scour prevention of the frame work. 2) The effects of the frame revetment on the water quality appeared to be good for the surrounding environment. Dissolved Oxygen(DO) was higher about $0.4{\sim}0.6mg/{\ell}$ at the frame revetment than that of the main stream flow. pH value was lower about 0.4~0.5. Electric Conductivity(EC) showed lower about $0.8{\sim}1.1{\mu}s/cm$. at submersion prevent frame than the low-flow of the stream. Turbidity was lower about $0.6{\sim}1.2mg/{\ell}$. 3) As the effects on ecological and environmental conditions, we discovered a number of carassius auratus and Zacco platypus in the frame revetment area. Also, sympetrum balteata, coenagrionidae was observed frequently. 4) The plant growth did not appear to tumble or wither despite of two big floods. The visual rating of plant growth was evaluated as medium (around 5 point) 5) The landscape analysis derived four factors(i.e. the harmony, the variation, the flexibility and the provincial characteristics) from the factor analysis.

  • PDF

Priority on Work Improvement for Automation of Ceiling Finishing Work (천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출)

  • Lee, June-Hyuck;Lee, Dongyoun;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

A Study on the Survey of Worker's Satisfaction with Safety Gear in Structural Frame Work (골조공사 관련 공종 근로자의 안전보호구별 만족도 조사)

  • Shin, Han-Woo;Kim, Tae-Hui;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.131-136
    • /
    • 2008
  • Safety management is the most important factor in the construction industry. If the construction company don't control the risk, it causes the accident which give the company fatal loss. According to the Korea industrial safety analysis reports, the 25.72% of the disasters are from the construction industry, and the 13.6% construction disasters are caused by not properly using the safety gears. Therefore, this study is to investigate the Wearing Safety Gear by Occupational Classification and the Satisfaction in the Construction Field. The results are ; Carpenters are dissatisfied with the safety shoes and belt, re-bar workers are dissatisfied with the safety helmet and shoes, Concrete workers are dissatisfied with the safety helmet and goggles.

A Study on the Influence of information in the Facorty Automation (자동화에서의 정보의 역할에 관한 연구)

  • 허성관;권택진;박종락;박동은
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.4 no.4
    • /
    • pp.53-59
    • /
    • 1999
  • This study suggests that present conceptual frame work of factory automation technique that is the start point of factory automation is achieved and display a conceptual frame work for it's strategic effect under this documental research. This paper examines influence of information in the factory automation.

  • PDF

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF