• Title/Summary/Keyword: Foundation part

Search Result 618, Processing Time 0.026 seconds

Pattern Grading 법(法)의 원리(原理)와 분석(分析)

  • Kim, Hye-Sun
    • Journal of the Korean Society of Costume
    • /
    • v.11
    • /
    • pp.5-30
    • /
    • 1987
  • This thesis attempts to contribute to analyze the methods of pattern grading which is in common fashion in America and Japan and to make the foundation for the basic technique of pattern grading fitting to Korean body shape. There are two types in pattern grading. The results are as follows: 1) The pattern grading according to body shape contains A, B, C, D, F, and G. A is suitable for the bulging part of a body and F is the most suitable for the general part of a body. 2) The pattern grading not depending on body shape has no relation to the quantity of grading in the size of a body but includes silhouettes or design details. The standards of its methods are as follows: a) by the part of body b) by the balance of whole pattern c) by adjusting to the mutual balance of besign details.

  • PDF

A Vibration Isolation Design for Engine Room Opening Deck around Heavy Spare Parts of the Main Engine (Main Engine의 Heavy Spare Parts가 설치된 Engine Room Opening Deck의 방진 설계 사례)

  • Jeon, Yong-Hoon;Lim, Gu-Sub;Jeong, Tae-Seok
    • Special Issue of the Society of Naval Architects of Korea
    • /
    • 2009.09a
    • /
    • pp.93-96
    • /
    • 2009
  • Foundation structure for the main engine heavy spare parts in the engine room is susceptible to resonance problem due to outfitting weight. In addition the deck floor has a large opening for the main engine installation and maintenance, which further weakens the foundation structure. To reinforce the weak structure, two types of approaches have been used; 1) insert an H-pillar below or above the floor and 2) increase the stiffener size. In this paper, the H-pillar approach is used to solve the vibration problem of the foundation structure in the engine room opening area. A commercial program is used to analyze the vibration problem ad to find the location and the size of the H-pillar. Modal test at the quay and on-board vibration measurement during the sea trial have confirmed the validity of inserting an H-pillar below the floor.

  • PDF

Structural Design and Construction for Tall Damped Building with Irregularly-Shaped Plan and Elevation

  • Yamashita, Yasuhiko;Kushima, Soichiro;Okuno, Yuuichirou;Morishita, Taisei
    • International Journal of High-Rise Buildings
    • /
    • v.7 no.3
    • /
    • pp.255-264
    • /
    • 2018
  • This paper introduces three distinctive means for the use of a 189-meter high damped structure ensuring safety against earthquake: 1. Realization of L-shaped elevational structural planning: The bottom and top of the tower have belt trusses and hat trusses respectively to restrain the bending deformation. Furthermore, large-capacity oil dampers (damping force 6,000 kN) are installed in the middle part of the tower to restrain the higher-mode deformation. 2. Realization of L-shaped planar structural planning: We devised a means of matching the centers of gravity and rigidity by adjusting planar rigidity. Moreover, viscous damping devices are located at the edges of the L-shaped plan, where torsional deformation tends to be amplified. We call this the "Damping Tail" system. 3. Composite foundation to equalize deformations under different loading conditions: We studied the vertical and horizontal deformations using sway-rocking and 3D FEM models including the ground, and applied multi-stage diameter-enlarged piles to the tower and a mat foundation to the podium to keep the foundations from torsional deformations and ensure structural safety.

The Development of Brassiere Pattern for Middle School Students (성장기 소녀용 브래지어 패턴개발)

  • Na, Mi-Hyang;Kim, Mi-Sun;Jung, Heh-Soon
    • Fashion & Textile Research Journal
    • /
    • v.6 no.5
    • /
    • pp.648-654
    • /
    • 2004
  • The purpose of this study was to develops of brassiere pattern for middle school students (15 ages ${\mp}$ 3). In order to design a brassiere pattern, the body surface shell was used as the basic pattern. The foundation pattern and the four-piece brassiere pattern with wire were designed and sewed. The results of this study can be summarized as follows. 1. The foundation pattern of the size 75A was proved proper for the body by the wearing tests. Each angle and length of the parts on the base line of the breasts played an important role on setting the pattern. 2. As based on the body surface shell extracted from a plaster mold, the cups of brassiere pattern were applied to the body surface shell, and full side stretch -wings were applied to 8% reduced body size. 3. As the result of the wearing test, the excellence of the experimental brassiere was recognized objectively, with high marks in all the items of clothing compensation, body motion, clothing pressure and breasts growth. The experimental brassiere was covering the whole breasts to cope with change according to breasts growth, It was designed to support the breasts firmly, not to press the middle part of them. Simultaneously, this has the advantages that satisfy a characteristic of a figure and the purpose of putting it on.

Characteristics of Temperature History at Each Section of Mat Foundation Concrete Applying Double Bubble Sheets (이중버블시트를 적용한 매트 기초콘크리트의 부위별 온도이력 특성)

  • Kim, Tae-Cheong;Kim, Jong;Jeon, Chung-Keun;Shin, Dong-An;Oh, Seon-Kyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.13-14
    • /
    • 2016
  • This study is aimed to analyze temperature history at each section of mat foundation concrete applying double bubble sheets. The results of the study are as follows. Firstly, the results of measuring the temperature history indicate that the lowest external temperature has been recorded at -5.6℃ for the three-day measurement period. For the central section, the result indicates that the lower, center and upper part have all secured the concrete curing temperature of 18℃ or higher. This results are believed to have resulted from excellent heat insulation performance of double bubble sheets. For the edge section between the edge form and the concrete interface, the temperature has been measured, on average, approximately 12℃ lower than the central section. However, all measured sections have indicated the temperature of 5℃ or higher. Meanwhile, an analysis has been conducted through the estimation equation of compressive strength of maturity during the curing period in order to examine the possibility of early frost damage and the aspect of securing strength. It has been confirmed that the compressive strength is higher than 50°D·D, namely, 5MPa, on the 3rd day of the aging process, which allows early frost damage to be avoided.

  • PDF

RECENT AND CURRENT TRENDS IN BASIC TRIBOLOGY RESEARCH

  • LARSEN-BASSE, J
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 2002.10b
    • /
    • pp.11-12
    • /
    • 2002
  • Tribology research is constantly changing focus as new drivers for the research emerge. They include new industrial needs and barriers to performance, new possibilities brought about by new observation and modeling tools, and new people with different backgrounds. We outline the changes in basic academic tribology research over the past 15-20 years, as it is reflected in the research portfolio of the US National Science Foundation. While independent tribology programs may be a thing of the past there is a clear tendency for tribology research to continue as part of other activites, such as nano- and biotechnology and computational materials research.

  • PDF

Design of Dang-San Steel Railway Bridge (당산철교의 설계)

  • 유동호;김선일
    • Computational Structural Engineering
    • /
    • v.12 no.4
    • /
    • pp.69-69
    • /
    • 1999
  • Design of Dangsan Steel Railway Bridge(a part of Seoul Subway Line NO. 2), which is supposed to be replaced after its 15years survice, was done, and the reconstruction has begun in Dec. 1997. The design include new superstruc-ture and bridge piers, retrofitting of the foun-dation, rail system, electric and signal, etc. In this paper, design of the structure is mainly summarized. The main span superstructure, across Han river, is composite section which is com-posed of steel box and reinforced concrete deck slab with 9 span continuous. The superstructure for the approaches is bottom througth type 2-cell steel box girder with steel floor system and concrete deck slab with 3 or 4 span continuous. The bridge piers was planned to be reconstructed based upon the result from the various investi-gations, while the foundation(cassion and pile foundation) was planned to be retrofitted. For superstructure erection, the method of combination of barge bent and heavy lifting and the launching truss method was investigated for the main span and approach spans, respectively.

  • PDF

Temperature Crack Control Foundation in LG IPP Project (부공복합화력발전소 기계기초의 오돈균열제어)

  • 양주경;조경연;심재홍
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.309-312
    • /
    • 2000
  • Nonuniform temperature distribution due to hydration heat induces thermal stress in mass concrete. At early ages, such thermal stress may induce thermal cracks which can affect on the durability ad safety of the structure. Steel fiber reinforced concrete may be useful when a large amount of energy has to be absorbed, when a high tensile strength and reduced cracking are desirable, of an improvement of thermal conductivity is desirable. In LG IPP Project, the upper part(50cm) of turbine foundation was replaced with steel fiber reinforced concrete to reduce the thermal crack induced by hydration heat. It was shown that the thermal crack control could be successfully achieved by steel fiber reinforced concrete.

  • PDF

Analytical Study of HAT Joint between PHC Pile and Steel Pipe Column (강재기둥과 PHC 파일을 연결하는 반구형 접합부(HAT Joint)의 유한요소 해석 PART I : 원형강관기둥)

  • Oh, Jin-Tak;Lee, Yeun-Seung;Kim, Sang-Bong;Ju, Young-Kyu
    • Journal of Korean Association for Spatial Structures
    • /
    • v.15 no.1
    • /
    • pp.103-110
    • /
    • 2015
  • To overcome disadvantages of usual spread foundation in large space structure, some prototypes of a joint of the PHC pile to steel pipe column that directly connects a column to a PHC pile are analytically studied. With the consideration of strength requirement and stress concentration of joint of the PHC pile to column, we suggest the most appropriate one.

An Experimental Study on the Development of Unit Column Wall Form System Using (Focusing on the Lateral Pressure) (기둥식 벽체 거푸집 시스템 개발에 관한 실험적 연구)

  • Kang, Chang-Soo;Lee, Han-Seung;Tae, Sung-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.507-510
    • /
    • 2005
  • Euro form which constructs the present RC structures is used widely by the form method of construction of a wall type structure had much consumption of the human power and equipments by the assembly and the demolition, and the complement was required according to demerit with much leakage of cement paste by the form joint, so it developed the new pillar type form system. On the study, in order to consider the modification characteristic by lateral pressure which does the influence most important for the new developed pillar type form system performance, research of a paper manufactured a miniature wall form model, and advanced performance evaluation focusing on lateral pressure. Moreover, lateral pressure evaluation of a new style system was actually gone on through the on-site experiment about a part of wall type srutcture spot for a model experiment and its result on the foundation which is the purpose in evaluating on-site application possibility propriety at the foundation time of wall type concrete structure construction of a pillar type form system.

  • PDF