• 제목/요약/키워드: Fossil power plant

검색결과 216건 처리시간 0.036초

화력발전소 주배관 3차원 변위측정시스템 개발 (Development of 3-D. Displacement Measurement System for Critical Pipe of Fossil Power Plant)

  • 송기욱;현중섭;하정수;조선영
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2003년도 추계학술대회
    • /
    • pp.1198-1205
    • /
    • 2003
  • Most domestic fossil power plant have exceeded 100,000 hours of operation with the severe operating condition. Among the critical components of fossil power plant, high temperature steam pipe system have had a many problems and damage from unstable displacement behavior because of frequent start up and shut down. In order to prevent the serious damage and failure of the critical pipe system in fossil power plant, 3-dimensional displacement measurement system were developed for the on-line monitoring system. 3-D Measurement system was developed with using the LVDT type sensor and rotary encoder type sensor, this system was installed and operated on the real power plant successfully. In the future time, network system of on-line diagnosis for critical pipe will be designed.

  • PDF

화력발전설비 진단기술 및 전문가 시스템개발에 관한 연구 (A study on the developing the diagnosis technology and expert system in fossil power plant)

  • 백영민;정희돈;신은주
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.642-648
    • /
    • 2008
  • In order to analyze the causes of fossil power plant facilities due to a degradation and corrosion, artificial degraded materials composed of the facilities were manufactured. Various experiment were performed based on mechanical test, microstructure observation, hardness test, electrochemical potentiokinetic reactivation test(EPR) and corrosion scale thickness measurement test. The master curves were write out using Larson-Miller parameter to evaluate the degree of degradation with the above diagnosis methods. These data were applied to materials database of fossil power plant diagnosis. Finally expert system on the fossil power plant diagnosis was developed using the master curves and diagnosis algorithms.

  • PDF

화력발전소 고온 증기배관 실시간 변위감시 시스템 개발 (Development of On-line Displacement Monitoring System for High Temperature Steam Pipe of Fossil Power Plant)

  • 이영신;현중섭
    • 한국정밀공학회지
    • /
    • 제22권6호
    • /
    • pp.83-89
    • /
    • 2005
  • Most domestic fossil power plants have exceeded 100,000 hours of operation with the severe operating condition. Among the critical components of fossil power plant, high temperature steam pipe systems have had a many problems and damage from unstable displacement behavior because of frequent start up and shut down. In order to prevent the serious damage and failure of the critical pipe system in fossil power plants, 3-dimensional displacement measurement system was developed for the on-line monitoring. Displacement measurement system was developed with a use of a LVDT type sensor and two rotary encoder type sensors. This system was installed and operated on the real power plant successfully.

변압 관류형 초임계압 화력발전소 전범위 시뮬레이터 개발 (The development of full-scope replica simulator for variable supercritical pressure once-through fossil power plants)

  • 이중근;안연식;정훈;이용관;한병성
    • 제어로봇시스템학회논문지
    • /
    • 제4권3호
    • /
    • pp.392-399
    • /
    • 1998
  • A full-scope replica type simulator whose MCR(main control room) has the same features and operation functions as MCR of the reference power plant has been developed for a fossil power plant. This simulator was developed with the model of Poryung Fossil Power Plant #3,4 which is the standard model of the Korean fossil power plant. It is the first localized simulator for the supercritical, variable boiler pressure type fossil power plant. The simulator provides various kinds of accidents which are in normal plant operation and thus enables operators to recover or reduce possible damages. To design and develop this kind of simulator, we need to integrate high technologies such as system analysis, plant operation and system integration of mechanics, physics, computer science. CASE(Computer Aided Software Engineering) tools were used to develop the dynamic model. This simulator will greatly contribute to the improvement of the safety and efficiency of the fossil power plant by implementing operator training. In this paper, the outline of software and hardware configuration and characteristics of the simulator are described, and the results of 30%, 50%, 75%, 100% load operation test will be discussed.

  • PDF

북제주화력 발전제어설비에 대한 최적 DCS 개발 (Development of Optimal DCS in Bookjeju fossil Plant Control System)

  • 이주현;정창기;류홍우;김관행
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 B
    • /
    • pp.663-666
    • /
    • 1997
  • This paper presents the development of Distributied Control System for Bookjeju fossil plant. The original analog control system for the power plants has a complex and large-scale structure in their hardware configuration and much difficulties have been experienced for maintenance due to lack of original components. This system connects three different control systems in Bookjeju fossil plant by cue network, The result shows that optimal Distributied Control System has standardization of control system, effective operation management and convenient maintenance of power plant.

  • PDF

화력발전 보일러를 위한 퍼지제어기의 설계 (A Fuzzy Control for Boiler System of Fossil-Power Plant)

  • 문운철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 A
    • /
    • pp.140-142
    • /
    • 2001
  • Three single loop fuzzy logic controllers are designed independently for the control of boiler system of fossil-power plant. The control rules and the membership functions of proposed fuzzy logic control system are generated automatically without using plant model. The simulation shows successful results for wide range operation of boiler system of fossil-power plant.

  • PDF

국산개발 DCS시스템 기술동향 및 구조분석 (Technological and Architectural trends of a domestically developed DCS system)

  • 이주현;김응석;김관행
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 B
    • /
    • pp.778-780
    • /
    • 1998
  • The distributied control system consists of PCS(Process Control System), OIS(Operator Interface System), Communication Network and EWS(Engineering Workstation). This parer describes the system structures and the technological trends of domestically developed distributied control system (DCS).

  • PDF

추정모델에 의한 화력발전 플랜트 계측데이터의 검증 및 유효화 (Estimation Model-based Verification and Validation of Fossil Power Plant Performance Measurement Data)

  • 김성근;윤문철;최영석
    • 한국정밀공학회지
    • /
    • 제17권2호
    • /
    • pp.114-120
    • /
    • 2000
  • Fossil power plant availability is significantly affected by gradual degradations of equipment as operation of the plant continues. It is quite important to determine whether or not to replace some equipment and when to replace the equipment. Performance calculation and analysis can provide the information. Robustness in the performance calculation can be increased by using verification & validation of measured input data. We suggest new algorithm in which estimation relation for validated measurement can be obtained using correlation between measurements. Input estimation model is obtained using design data and acceptance measurement data of domestic 16 fossil power plant. The model consists of finding mostly correlated state variable in plant state and mapping relation based on the model and current state of power plant.

  • PDF

최소 컷셋법에 의한 화력발전소 기동전원의 신뢰도 예측에 관한 연구 (A Study on the Reliability Evaluation of Start-up Power Supply in Fossil Power Plant by Minimal Cut-Set Method)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권4호
    • /
    • pp.358-364
    • /
    • 1999
  • The auxiliary transformers or start-up/stand-by transformer(s) are installed against the start-up and shut-down of generator and emergency status in fossil power plant. The on-site power supply configuration using these transformers must be determined, considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and ecfonomy of plant. The auxiliary or start-up/stand-by power supply configuration has been determined considering only safety requirements and construction cost until now in Korea. This paper presents general theorems for the reliability estimation and proposes 2-unit based 4 alternatives for the start-up power supply stystem of 500㎿ standardized fossil power plant. The reliability and unavailability of equipment, system and configuration are determined using minimal cut-set methodology. The optimized plan of 4 alternatives is determined based on this ultimate reliability and unavailability.

  • PDF

1000MW 보일러 프로세스의 모델링과 데이터 추출 및 시뮬레이션 (Simulation and Data Sampling Modelling for 1000MW Boiler Process)

  • 박두용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.301-302
    • /
    • 2007
  • Maximum power consumption was up to 6,228kW in the summer of 2007 due to steady development of industry as well as increased demand of individual. Twenty fossil-Fired Thermal Power Plant for 500MW were underconstructed at present. KEPRI(Korea Electric Power Research Institute) manage 'Development of Advanced Fossil-Fired Thermal Power Generation System' project to construct high efficient power plant of 1000MW capacity for preparing increased demand of power. Design of control logic and data sampling were explained and high efficient control logic was simulated in detail in 'The Development of Next Generation Power Plant Instrument and Control System'(sub-project of 'Development of Advanced Fossil-Fired Thermal Power Generation System' project).

  • PDF