• Title/Summary/Keyword: Formwork Design

Search Result 82, Processing Time 0.024 seconds

Artificial Intelligence Image Segmentation for Extracting Construction Formwork Elements (거푸집 부재 인식을 위한 인공지능 이미지 분할)

  • Ayesha Munira, Chowdhury;Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2022
  • Concrete formwork is a crucial component for any construction project. Artificial intelligence offers great potential to automate formwork design by offering various design options and under different criteria depending on the requirements. This study applied image segmentation in 2D formwork drawings to extract sheathing, strut and pipe support formwork elements. The proposed artificial intelligence model can recognize, classify, and extract formwork elements from 2D CAD drawing image and training and test results confirmed the model performed very well at formwork element recognition with average precision and recall better than 80%. Recognition systems for each formwork element can be implemented later to generate 3D BIM models.

Application of BIM on Quantity Estimate for Reinforced Concrete and Formwork

  • Cheng, Ying-Mei;Lin, You-Lun;Li, Cheng-Wei;Lin, Chi-Ting
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.227-231
    • /
    • 2015
  • The focus of this study is on the accuracy in quantity estimates made by BIM for materials needed during construction. BIM-Revit Architecture 2014 is utilized to establish the information for an actual case to conduct estimates for the amount of reinforced concrete and formwork needed. The actual case is with a total construction area of 5,438 square meters and a total floor area of 31,623 square meters. The building commenced in December 2012 and the major structure has been completed in 2014. It is a RC structure with 4 stories underground, 12 stories above and 3 roof floors. The result shows that both of the quantity estimates of reinforced concrete and formwork are higher than that of actual use in the case. The estimate of reinforced concrete is higher than that of actual use by 2.18%, while the estimate of formwork is higher than that of the actual use by 13.04%. The results indicate that the estimate of reinforced concrete made by BIM has high accuracy, but the accuracy of the formwork estimate still needs improvement.

  • PDF

A Study on the Development of 3D Software for Automated Formwork Design (거푸집 자동화 설계를 위한 3차원 기반 소프트웨어 개발에 관한 연구)

  • Lee, Bo-Kyeong;Lee, Tae-Hoon;Kim, Jin-Sung;Lee, Dong-Eun;Choi, Hyeong-Gil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.112-113
    • /
    • 2019
  • In this study, development of 3D software for automated formwork design was conducted to achieve optimization and reduction of labor for temporary work. Through the literature review, the current technical level was identified and the required functions of 3D software for automated formwork design were derived. The 3D software should be developed with the aim of automating 3D design, improving construction quality and utilizing the Internet of Things. As a preliminary step to develop 3D software, the prototype demo version was developed to implement 3D design automation function, which confirm the possibility of 3D software development.

  • PDF

A Study on the Collapse Accidents of the Temporary Structures (가설구조물의 붕괴재해에 관한 연구)

  • 백신원;최순주
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.4
    • /
    • pp.142-147
    • /
    • 1999
  • Formwork is a temporary structure that supports its own weight and that of the freshly placed concrete as well as construction live loads including materials, equipments, and workmen. In designing and building formwork, the contractor should plan for economical construction without sacrificing quality or safety. But these temporary structures sometimes collapse during the concrete placing. Among the accidents and failures that occur during concrete construction, many are formwork failures, which usually happen at the time concrete is being placed. Generally some unexpected events cause one member to give way, then others become overloaded or misaligned and the whole formwork structure collapses. In this study, formwork failure events from 1994 to 1997 are analyzed using the structural analysis program. So the causes of the respective formwork failure are explored. Therefore, the present study provides a firm base to design the temporary structures such as formwork.

  • PDF

An Experimental Study on the Measuring Lateral Formwork Pressure Controlled by Super-Workable Fresh Concrete (고유동 콘크리트의 거푸집 측압 측정에 관한 실험적 연구)

  • 이준구;박광수;김한중;배수호
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.142-145
    • /
    • 1998
  • The purpose of this study is to estimate lateral formwork pressure controlled by super-workable fresh concrete using prototype structrues such as, tall wall, retaining wall, and beam quantitativly. As a result of this experiment, a function which can be used to design a formwork system and to predict formwork pressure curve is formulated.

  • PDF

Development of A Prototype for Wall Formwork Designs using Open BIM (개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발)

  • Jin, Chengquan;Kim, Hyunjoo;Hyun, Chang-Taek;Han, Sang-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.3-13
    • /
    • 2018
  • The formwork cost amounts for a significant proportion of project construction costs. It costs 10-15% of the total construction cost and 30-40% of the frame structure construction cost. In addition, the formwork collapse accidents are frequently causing deaths in the construction industry, and thus, is known to be of relatively high degree of risk. As so, the accuracy of structural calculation and quantity take-off when planning the formwork in a construction project are a very important matter. Accordingly, this study develops a BIM based formwork design prototype, that enables the construction manager to optimize the design through applying the proposed new IFC entities associated with the formwork design. The approach proposed in this study is expected to support the construction manager with accurate quantity calculation and rapid planning and construction. Since this study considered specific small-scale buildings using Euro-form and show the possibility of utilizing BIM entities in the formwork design process, further research is recommended towards the limitations in applying the system to other types of formworks.

Development of Corner-Supported Auto Climbing Formwork System (강합성코어벽을 활용한 코너지지형 거푸집시스템 개발)

  • Hong, Geon-ho;Shim, Woo-Kyung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.7
    • /
    • pp.171-178
    • /
    • 2019
  • Auto Climbing Formwork System (ACS) for construction of high-rise building is a construction method for automatically lifting the formwork system supported by the anchor on the pre-constructed concrete wall. It has excellent construction speed and quality, but it has the possibility of structural failure depending on the quality of concrete and also has low economical efficiency due to the use of foreign technology. In order to overcome these problems, this study conducted an optimum design for the development of a new concept of Corner Supported Auto Climbing System (CS-ACS) in conjunction with the development of corner steel-reinforced concrete core wall system. For the design the formwork system, the basic module and structural member compositions were planned, and the structural analysis program was used to analyze the optimum member's cross section and spacing. As a result, the horizontal displacement and the stress of the horizontal members were influenced by the spacing more than the cross-section of the member. On the other hand, vertical members did not affect the displacement and stress of the formwork system. The form tie was very effective in controlling the displacement when adjusting the spacing of the horizontal members, but when the spacing of the form tie is more than 1,500mm, it is analyzed that form tie is yielding in basic module. When the span of the formwork system is more than 30m, it is analyzed that the basic module needs to be changed because of the increase of overall displacement.

An Experimental Study on Extimation for Formwork Pressures with High Flowable Concrete (고유동콘크리트의 거푸집측압 예측을 위한 실험적 연구)

  • 김종우;이대근;김기수;강지훈;이영욱
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1996.10a
    • /
    • pp.295-300
    • /
    • 1996
  • The design of formwork system for vertical form faces is controlled by pressures predicted to act against the formwork by fresh concrete. An overestimation of pressure results in heavy, and ex-pensive formwork. An underestimation results in malformed structure, of in some cases, it causes the failure of the formwork. This study is a preliminary step in determination lateral pressures with High folwable concrete. To estimate lateral formwork pressures, we measured tensile strain of formtie in the movable part of the form. From the experimental results maximum lateral pressure and the location at which maximum pressures occurs, were determined. The experimental results are compared with the results predicted by the Gardner & Qureshi's proposed equation and the accepted Korean Standard Specification for concrete and ACI equation.

  • PDF

A Support Model of Optimum Layout Planning of Forms for Improving Constructability of Formwork (거푸집공사 시공성 향상을 위한 거푸집 배치 효율화 지원 모델 - 구조부재 조정을 중심으로 -)

  • Lee, Dongmin;Lim, Hyunsu;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.212-213
    • /
    • 2013
  • The constructability of Formwork has a importantly influence on the duration and cost in a construction project. However, the existing studies on the formwork are mainly focused on a method of construction. Although a layout planning of forms, especially, is an important factors affecting the constructability and cost, it is done by engineers empirically and intuitionally after completion of structure design. Therefore this study suggest a decision support model for optimal formwork layout model based on the rearrangement of structural members by using Genetic Algorithm to improve constructability of formwork.

  • PDF

Evaluation of Construction RCB Exterior Wall Formwork according to Placing Height on Nuclear Power Plant

  • Song, Hyo-Min;Sohn, Young-Jin;Shin, Yoonseok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.6
    • /
    • pp.653-660
    • /
    • 2015
  • Technologies for reducing construction duration are key factors in nuclear power plant construction projects, as a reduction in construction duration at the construction phase leads to a reduction in construction cost and an increase in profits through the early operation of the nuclear power plant. To analyze the constructability of the height of single-layer placement of formwork for the Reactor Containment Building (RCB) exterior wall through lateral pressure according to the height of concrete placement, the deformation criteria for formwork, and a new form design, 'MIDAS GEN (hereinafter referred to as MIDAS)' is used in this study. The cost and workload of formwork are derived according to the unit of height of the RCB exterior wall. Based on the result, it was found that the higher the RCB exterior wall, the higher the material cost, and the less the construction duration and the less the total number of formwork layers. Based on this result, it is believed that the material cost and the construction duration can be appropriately determined according to the formwork height.