• Title/Summary/Keyword: Flow manager

Search Result 82, Processing Time 0.024 seconds

Comparative Analysis of Dynamic Moisture Movement Testers

  • Lee, Duck-Weon;Shim, Woo-Sub;Lim, Ho-Sun
    • Journal of Fashion Business
    • /
    • v.15 no.6
    • /
    • pp.40-55
    • /
    • 2011
  • The purpose of this research is to review testing principle, testing design and experimental results of the four dynamic moisture movement testers. The research analyzes Moisture Manager Tester (MMT), Alambeta Instrument, Dynamic Surface Moisture Movement Tester, and Gravimetric Absorbent Testing Method based on American Society for Testing and Material (ASTM) E 96 which is an international standard testing method. Although many of researches use ASTM E 96 to measure moisture movement on a fabric, it has several weaknesses, such as long experimental time and a physical change of sample by a holder of the frame. Hence, lots of researchers have studied and developed the new measurement systems measuring moisture management on a fabric or garment and ultimately mimic heat energy and perspiration created by the human body. These moisture management systems use a variety of parameters, such as electricity, color, and sensor to measure their movement in the fabric. Through comparison with the existing tester (ASTM E 96), the research recognizes the strength and weakness in the dynamic moisture movement testers.

Causes of Delay in Construction Projects in Bangladesh

  • Islam, Mohammad Saiful;Trigunarsyah, Bambang;Hassanain, Mohammad;Assaf, Sadi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.82-86
    • /
    • 2015
  • Construction delay is a common problem worldwide, which is considered as one of the main reasons for project failure. Bangladesh construction industry is no exception. This study investigated the main causes of delay in large building construction projects in Bangladesh. A questionnaire survey was conducted to determine the causes of delay from owners, consultants, and contractors of large building construction projects. About 70 respondents participated in the survey. Using the importance index analysis, the study identified 10 most important causes of delay from a list of 30 different causes. Ten most important causes were: (1) lack of experienced construction manager, (2) lowest bidder selection, (3) funding shortage by owner, (4) lack of proper management, (5) improper planning and scheduling, (6) lack of skilled workers, (7) site constraints, (8) contractors' cash flow problems during construction, (9) escalation of resources price, and (10) contractors' excessive workload. Furthermore, Kruskal-Wallis test indicates that there is no significant variation exists among the three group of respondents, ie owners, consultants and contractors.

  • PDF

Accounting Conservatism and Excess Executive Compensation (회계 보수주의와 경영자 초과보상)

  • Byun, Seol-Won;Park, Sang-Bong
    • Management & Information Systems Review
    • /
    • v.37 no.2
    • /
    • pp.187-207
    • /
    • 2018
  • This study examines the negative relationship between accounting conservatism and excess executive compensation and examines whether their relationship increases as managerial incentive compensation intensity increases. For this purpose, a total of 2,755 company-years were selected for the analysis of the companies listed on the Korea Stock Exchange from December 2012 to 2016 as the final sample. The results of this study are as follows. First, there is a statistically significant negative relationship between accounting conservatism and manager overpayment. This implies that managers' incentives to distort future cash flow estimates by over booking assets or accounting profits in order to maximize their compensation when manager compensation is linked to firm performance. In this sense, accounting conservatism can reduce opportunistic behavior by restricting managerial accounting choices, which can be interpreted as a reduction in overpayment to managers. Second, we found that the relationship between accounting conservatism and excess executive compensation increases with the incentive compensation for accounting performance. The higher the managerial incentive compensation intensity of accounting performance is, the more likely it is that the manager has the incentive to make earnings adjustments. Therefore, the high level of incentive compensation for accounting performance means that the ex post settling up problem due to over-compensation can become serious. In this case, the higher the managerial incentive compensation intensity for accounting performance, the greater the role and utility of conservatism in manager compensation contracts. This study is based on the fact that it presents empirical evidence on the usefulness of accounting conservatism in managerial compensation contracts theoretically presented by Watts (2003) and the additional basis that conservatism can be used as a useful tool for investment decision.

A architecture and control method of Streaming Packet Scheduler at 100bps for Guaranteed QoS of Internet and Broadcasting Services (인터넷 및 방송서비스의 QoS 보장을 위한 10Gbps급 스트리밍 패킷 스케줄러 구조 및 제어방법)

  • Kim Kwang-Ok;Park Wan-Ki;Choi Byeoun-Chul;Kwak Dong-Yong
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.41 no.1
    • /
    • pp.23-34
    • /
    • 2004
  • This paper presents architecture and control method of packet scheduler to guarantee QoS of high quality streaming services in high-speed packet-switched networks. Since streaming services need far more stringent QoS requirements than the typical sort of burst data applications, they should be guaranteed minimum bandwidth and end-to-end delay bound to each flow, regardless of the behavior of other flows. To meet these requirements, a packet scheduler isolate a flow from the undesirable effects of other flows and provides end-to-end delay guarantees for individual flow and divides stringently the available link bandwidth among flows sharing the link. Until now, many vendors are developing traffic management chips running at 10Gbps, but most of chips have drawbacks to support high quality streaming services. In this paper, we investigate the drawbacks of commercial TM chips and traffic characteristic of streaming services and present implementation frameworks of the proposed packet scheduler. Finally, we analyze the simulation results of the proposed scheduler.

A Dynamic Queue Manager for Optimizing the Resource and Performance of Mass-call based IN Services in Joint Wired and Wireless Networks (유무선 통합 망에서 대량호 지능망 서비스의 성능 및 자원 최적화를 위한 동적 큐 관리자)

  • 최한옥;안순신
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.25 no.5B
    • /
    • pp.942-955
    • /
    • 2000
  • This paper proposes enhanced designs of global service logic and information flow for the mass-call based IN service, which increase call completion rates and optimize the resource in joint wired and wireless networks. In order to hanve this logic implemented, we design a Dynamic Queue Manager(DQM) applied to the call queuing service feature in the Service Control Point(SCP). In order to apply this logic to wireless service subscribers as well as wired service subscribers, the service registration flags between the Home Location Register(HLR) and the SCP are managed to notify the DQM of the corresponding service subscribers’ mobility. Hence, we present a dynamic queue management mechanism, which dynamically manages the service group and the queue size based on M/M/c/K queueing model as the wireless subscribers roam the service groups due to their mobility characteristics. In order to determine the queue size allocated by the DQM, we simulator and analyze the relationship between the number of the subscriber’s terminals and the drop rate by considering the service increment rate. The appropriate waiting time in the queue as required is simulated according to the above relationship. Moreover, we design and implement the DQM that includes internal service logic interacting with SIBs(Service Independent building Blocks) and its data structure.

  • PDF

A Study on the Theoretical Frameworks and the Implementation Effects of the Fishery Closures as Multi-strategical Measures of Fisheries Management (어업관리 휴어제의 이론체계와 도입 타당성 및 기대효과에 관한 연구)

  • Lee Sang-Go
    • The Journal of Fisheries Business Administration
    • /
    • v.37 no.2 s.71
    • /
    • pp.33-59
    • /
    • 2006
  • This study describes approaches to fisheries management that restrict access by fishers to an area in some way. When fishery closure is established as a technical conservation measure it is a form of input control as a Korea fisheries management system. There are many compelling reasons why a fisheries manager should seriously consider closed areas and/or time restrictions, either as a complement to other measures or as the primary facet of the Korean fisheries management strategy. Fishery closures have been shown to be effective in many fisheries and are an important tool in the management armoury. In many respects justifications for their use and the process of implementation are likely to be relatively straightforward compared to permanent area closures. From a Korean fisheries management perspective, the benefits that flow from fishery closures are usually less easy to predict than for other management measures. Moreover, even if one accepts that implementation of fisherg clossures will provide higher production levels in adjacent fished areas, the potential benefits may often be in danger of being largely dissipated. If, for example, the fishery remains open access, the increased production is likely to attract new entrants into the fishery, thereby driving it back towards bioeconomic equilibrium. From a Korean wider fisheries conservation perspective, however, fishery closures have important and clearly defensible roles to play and some form of zoning arrangement will often effectively serve conservation values. Given the increasing trend towards the establishment of national networks of fisherg closures, it seems likely that fisheries managers throughout the world will need to ensure that they are familiar with the issues surrounding these approaches. The importance of being explicit about the goals for fishery closures in Korea have been continually emphasised throughout this study. There may, of course, be multiple justifications for the measure, in which case it is important to try and specify them in order of priority.

  • PDF

Development of an Nursing Assessment Tool for Emergency Patients (응급환자 간호사정 도구개발)

  • Ahn, Mi-Hyun
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.4 no.2
    • /
    • pp.419-437
    • /
    • 1998
  • Nurses use a nursing process. that is a scientific approach method. in order to understand the clients' condition and to solve their problems. Professional nurses have accepted the nursing process as a standard framework for nursing activities, and the first step of the nursing process is nursing assessment. The purpose of this study was to develop a nursing assessment tool for emergency patients. Assessment is a first step in the nursing process, and scientific assessment helps to better understand the patients. Thus the development of an assessment tool for emergency patients will improve of nursing quality and advance to efficacy of emergency room(ER) management. The study involved the development of a conceptual framework, preliminary tool, content validity verification process. and reliability verification process. The conceptual framework was developed through a review of the literature. and preliminary tool was developed from the conceptual framework that based on care flow sheet' developed James A. Haley. The preliminary tool was evaluated for validity and reliability by seven experts, one ER nurse manager, two ER head nurses, two emergency medicine doctors. and two ER charge nurses and by ten nurses with one to five year careers in ER nursing. The results of this study was as follows 1. The conceptual framework which was developed was composed of three parts. They were triage criteria, first assessment and secondary assessment. 2. The preliminary tool which was developed had 31 items based on the conceptual framework. 3. To test expert validity a 4-point scale was used. items which had gained 3-4 points from six persons of the seven experts were selected. All 31 items from the preliminary tool were selected. 4. The reliability test was done by ten nurses educated in the use of the assessment tool. Two pairs of nurses simultaneously assessed the same patients. A total agreement percentile was calculated and result was 87.3% agreement. 5. After the validity and reliability testing. the final emergency patient nursing assessment tool was finalized with 31 items. and a check-list for the responses. This study concludes that the tool which was developed is both valid and reliable will advance quality care for emergency patients. This emergency nursing assessment tool was also found to be an adequate tool for assessment of emergency patients.

  • PDF

Design of Path Weighting Data Analysis System for Efficient Product Arrangement (효율적인 상품 배치를 위한 경로 가중치 데이터 분석 시스템 설계)

  • Kim, Bong-Hyun
    • Journal of Digital Convergence
    • /
    • v.14 no.10
    • /
    • pp.167-172
    • /
    • 2016
  • Commercial analysis has been used for a lot of reasons such as improving the distribution structure, operational cost savings. However, existing commercial assay system is mostly flow through the analysis of the population and the environment around the store. Therefore, in this paper, we design a path weighted data analysis system for efficient product arrangement. It is not applying the analysis method of the existing commercial sales center but the data analysis system applying the weight to the form of customers' paths in a store. In conjunction with the existing POS system, it provides effective product placement in department stores, such as supermarkets, convenience stores. To this end, a system that maximizes efficiency of product placement in stores, receiving path data, converting them into statistics data that apply the weight, and printing out them into a visualized monitering system for the manager to see was designed.

Computer modelling of fire consequences on road critical infrastructure - tunnels

  • Pribyl, Pavel;Pribyl, Ondrej;Michek, Jan
    • Structural Monitoring and Maintenance
    • /
    • v.5 no.3
    • /
    • pp.363-377
    • /
    • 2018
  • The proper functioning of critical points on transport infrastructure is decisive for the entire network. Tunnels and bridges certainly belong to the critical points of the surface transport network, both road and rail. Risk management should be a holistic and dynamic process throughout the entire life cycle. However, the level of risk is usually determined only during the design stage mainly due to the fact that it is a time-consuming and costly process. This paper presents a simplified quantitative risk analysis method that can be used any time during the decades of a tunnel's lifetime and can estimate the changing risks on a continuous basis and thus uncover hidden safety threats. The presented method is a decision support system for tunnel managers designed to preserve or even increase tunnel safety. The CAPITA method is a deterministic scenario-oriented risk analysis approach for assessment of mortality risks in road tunnels in case of the most dangerous situation - a fire. It is implemented through an advanced risk analysis CAPITA SW. Both, the method as well as the resulting software were developed by the authors' team. Unlike existing analyzes requiring specialized microsimulation tools for traffic flow, smoke propagation and evacuation modeling, the CAPITA contains comprehensive database with the results of thousands of simulations performed in advance for various combinations of variables. This approach significantly simplifies the overall complexity and thus enhances the usability of the resulting risk analysis. Additionally, it provides the decision makers with holistic view by providing not only on the expected risk but also on the risk's sensitivity to different variables. This allows the tunnel manager or another decision maker to estimate the primary change of risk whenever traffic conditions in the tunnel change and to see the dependencies to particular input variables.

Improving Productivity of Food Materials by Introducing Central Kitchen (호텔 식자재의 Central Kitchen도입을 통한 생산성 향상에 관한 연구 - rAr 호텔그룹 사례를 중심으로-)

  • 신재근;이수진
    • Journal of Applied Tourism Food and Beverage Management and Research
    • /
    • v.13 no.1
    • /
    • pp.29-41
    • /
    • 2002
  • Controlling food materials, is getting more significant in hotel management nowadays as the selling of food beverage continue to rise. F&B managers have been required to have new management of the food materials by a fierce competition, an increase in cost, the shortened span of product life and customer's demand that is becoming more various and sophisticated since Korea was placed under the influence of IMF. I'm going to analyze the factors that cause waste and loss through a series of the process to purchase inspect, store food materials, make a product with that materials and sell the product in order to make more profits by making the circulation of the food materials easier and more efficiently. I studied how 3 chain hotels of A group purchase, store the food materials and control stock. I made up questionnaires about the circulation and control of food materials to 107 cooks in order to know what the cooks who are working at the hotel regard as a real problem and a practical solution. This research indicates that purchasing, producing and selling departments don't establish the mutual connection, a professional purchasing manager is strongly needed and there is difficulty in predicting the proper timing to supply. Also the research shows that A hotel group controls the food materials by analyzing the amount of consumption, stock, setting up the period of validity and uses slowly moving food materials in stock mainly by introducing the menu that aims at four seasons. As a result, the research suggests that we should introduce the concept of food producing factory, as it were, Central Kitchen that is based on the network among various kitchens to improve the flow of the food materials.

  • PDF