• Title/Summary/Keyword: Flooding water

Search Result 722, Processing Time 0.034 seconds

A Study on Network Analysis of Flooded Roads (홍수범람에 따른 도로침수 네트워크 분석에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.241-242
    • /
    • 2016
  • Recently, the interests in safety and prevention from disaster are increasing. In particular, lifeline networks such as water line and sewerage, electricity, gas, and road would be damaged from a disaster. If the lifeline networks do not work in normal, national public service will not properly function. Researches in social network analysis have been conducted for analyzing the interdependency between individuals since 1970s. These network analysis are utilized to investigate a spread of information and disease. However, it is hard to discover the analyzed cases including characteristics of nodes of networks in the area of transportation and disaster. Therefore, this study conducts network analysis of flooded road with flooding scenarios, investigates safe evacuation routes in flooded road network, and suggests efficient approaches for preventing damages from a flooding.

  • PDF

Development of Inundation Flooding Simulation Program for Selecting Optimum Installation Site for Rainwater Infiltration Detention Block (빗물침투저류블록의 설치 최적지 선정을 위한 침수범람 시뮬레이션 프로그램의 개발)

  • Kim, Seongpyo;Lee, Taegyo;Ryu, Jungrim;Park seonmee;Choi, Heeyong;Choi, Hyeonggil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.129-130
    • /
    • 2023
  • This study proposes rainwater infiltration retention blocks as a solution to the flooding problems caused by recent climate change and developed a flood prediction simulation program to select the optimal site for installing rainwater infiltration retention blocks that can minimize damage from floods. By applying the existing 2D flood analysis model G2D and adding a reservoir function, the volume of water before and after installation can be determined through simulation results.

  • PDF

Removal and Release Velocities of Nutrients by Submerged Plants in Flood Control Reservoirs around Juam Lake (주암호 홍수조절용지내 침수 식물체의 영양염류 제거속도 및 용출속도)

  • Han, Jong-Hak;Seo, Dong-Cheol;Kim, Sang-Don;Kang, Se-Won;Lim, Byung-Jin;Park, Jong-Hwan;Kim, Kap-Soon;Lee, Jun-Bae;Kim, Hyun-Ook;Heo, Jong-Soo;Cho, Ju-Sik
    • Korean Journal of Environmental Agriculture
    • /
    • v.30 no.2
    • /
    • pp.144-152
    • /
    • 2011
  • BACKGROUND: Eutrophication occurs occasionally in flood control reservoirs around Juam lake in summer and early autumn. Lakeside macrophyte which is one of internal pollutants effects on water quality when it is submerged during water surface is rising after rainy season. METHODS AND RESULTS: To improve water the quality of water from water supply source and to establish the management plan of submerged plants in flood control reservoirs around Juam Lake, the removal and release velocities of nutrients by submerged plants in site 1 and 2 were investigated. Removal or release velocity constant (K) of COD by Carex dimorpholepis Steud in column was 0.07~0.18 $day^{-1}$ at 0~4 days after flooding, -0.23~-0.17 $day^{-1}$ at 5~19 days after flooding and -0.28~0.03 $day^{-1}$ at 20~33 days after flooding. Removal or release velocity constant (K) of T-N by Carex dimorpholepis Steud was 0.02 $day^{-1}$ at 0~4(8) days after flooding, -0.13~-0.10 $day^{-1}$ at 5(9)~33 days after flooding in column. Removal or release velocity constant (K) of T-P by Carex dimorpholepis Steud was 0.05~0.06 $day^{-1}$ at 0~4 days after flooding, -0.14~-0.09 $day^{-1}$ at 5~33 days after flooding. Release velocity constant (K) of nutrients by Miscanthus sacchariflorus Benth was lower than that by Carex dimorpholepis Steud. In site 1, the amount of nutrients release by Carex dimorpholepis Steud was 6,719 kg/month/area for COD, 2,397 kg/month/area for T-N and 466 kg/month/area for T-P. The amounts of nutrients release by Carex dimorpholepis Steud were higher than those by Miscanthus sacchariflorus Benth in both sites. CONCLUSION(s): The results of this study suggest that COD, T-N and T-P in water quality of Juam lake were strongly influenced by submerged plants in flood control reservoirs.

Seedling Stand Influenced by Water Management after Seeding and Seed Soaking with Plant Growth Regulators in Direct Wet Seeding Rice

  • Back, Nam-Hyun;Kim, Sang-Su;Kang, Si-Yong;Choi, Min-Gyu;Shin, Hyun-Tak;Kwon, Tae-Oh
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.44 no.3
    • /
    • pp.225-229
    • /
    • 1999
  • Unstable seedling stand establishment of wet direct seeding culture of rice is one of the major elements preventing the extension of its culture area. In order to develop methods of seedling stand improvement in direct seeded rice on flooded surfaces, three field experiments were conducted on silty loam soil using a cultivar 'Donjinbyeo' for three years, mainly focusing on water management after seeding and seed soaking with plant growth regulators (PGRs). Under the condition of shallow flooding after seeding, seedling stand rate increased and floating seedling rate decreased in both early and normal season seeding compared to deep flooding. With earlier draining time after seeding, there was a tendency towards preferential growth of the seminal root, increase of seedling stand and decrease of the floating seedling rate. Therefore the highest seedling numbers per unit area and the lowest floating seedling numbers were found upon drainage at 1 day after seeding (DAS), while a contrary tendency was shown upon conventional drainage at 7 DAS. Seed soaking with PGRs such as Metalaxyl or mixing of Metalaxyl with gibberellic acid (GA$_3$) significantly increased the seedling stand. In addition the effects of PGR treatment on seedling stand and the early growth of plants were greater under flooded conditions than under drained conditions after seeding, although draining of water after seeding improved the seedling establishment rate more when compared with the PGR treatment. These results suggest that draining management after seeding or maintaining of shallow flooding for a week is the most effective method to improve the seedling stand rate in wet direct seeding.

  • PDF

Operational Improvement of Small Urban Storm Water Pumping Station (1) - Simulation of Flood Hydrograph using GIS-based Hydrologic Model (도시 소유역 배수펌프장 운영개선 방안 연구 (1) - GIS 기반 수문모형에 의한 홍수유출수문곡선의 재현)

  • Gil, Kyung-Ik;Han, Jong-Ok;Kim, Goo-Hyun
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.6
    • /
    • pp.682-686
    • /
    • 2005
  • Recently some urban areas have been flooded due to heavy storm rainfalls. Though major causes of these floodings may be attributed to localized heavy rainfalls, other factors are related to urban flooding including deficiency of storm sewer network capacity, change of surface runoff due to covered open channels, and operational problems of storm drainage pump stations. In this study, hydrologic and hydraulic analysis of Sutak basin in Guri city were carried out to evaluate flooding problems occurred during the heavy storm in July, 2001. ArcView, a world most widely used GIS tool, was used to extract required data for the hydrologic analysis including basin characteristics data, concentration times, channel routing data, land use data, soil distribution data and SCS runoff curve number generation from digital maps. HEC-HMS, a GIS-based runoff simulation model, was successfully used to simulate the flood inflow hydrograph to Sutak pumping station.

AN EXPERIMENTAL STUDY ON AIR-WATER COUNTERCURRENT FLOW LIMITATION IN THE UPPER PLENUM WITH A MULTI-HOLE PLATE

  • NO HEE CHEON;LEE KYUNG-WON;SONG CHUL-HWA
    • Nuclear Engineering and Technology
    • /
    • v.37 no.6
    • /
    • pp.557-564
    • /
    • 2005
  • Air-water countercurrent flow limitation at perforated plates with four holes was investigated in a vertical tank to see the effects of the plate thickness, the number of hole, and the diameter of the hole on the onset of CCFL. The thickness of plates was 1 cm and 4 cm, with a relatively large hole diameter of 5 cm. The collapsed water level formed on the perforated plate and its distribution in the upper plenum were measured. The gas flow rate in the multi-hole plate is relatively higher than one in the single tube because some of holes in the multi-hole plate provide a flow path fur liquid with less air-liquid resistance than in the single tube. The onset of CCFL occurred at nearly the same air flow rate regardless of the plate thickness. The negligible effect of the plate thickness on CCFL means that the flooding is initiated at the top of the plate rather than at its bottom. It turns out that $j_k$ and $K_k$ better fit the data than $H_k$ when hole diameter is greater than 2.86 cm. In our experimental ranges, the collapsed water levels at the onset of CCFL ranged from 7.5 cm to 10.5 cm. There was no three dimensional distribution of water level before and after the onset of CCFL.

The development for flooding prevention apparatus of electrical equipment using air pressure (공기압을 이용한 전기설비 침수 방지 장치 개발에 관한 연구)

  • Kim, Gi-Hyun;Jean, Hyun-Jae;Lee, Sang-Ick;Bae, Suk-Myong;Lee, Jae-Yong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.281-284
    • /
    • 2008
  • Inundation of substation and ground power equipment breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. In case inundation excluding the exchanging cost of equipment, it occurs a great economic and social loss owing to recovery time and events of electric shock occur by inundation electrical equipment(Pad-mounted Transformer and Switch). In case of installing the power equipment at flood danger territory, we are necessary to the product development, the product is that water does not come in the inside the power equipment. Product of pressure maintaining are established on the basic frame and sensor operates at the flooding occurrence and is maintained a shutting tightly structure and it is a method. The product which is produced the reliability of the product it confirmed a flooding yes or no from the condition which puts in the water tank and it verified. We estimate that loss cost which is caused by with flooding and the power failure will be diminished if it is addition to advances the reliability evaluation and a security of the flood protection product.

  • PDF

Proposal of Flooding Time Nomograph (FTN) for Prediction of Flood Occurrence Time in Urban Stream: A Case Study of Dorimcheon Basin (도시하천의 홍수발생시간 예측을 위한 Flooding Time Nomograph (FTN) 제안: 도림천 유역을 중심으로)

  • Moon, Hyeon-Tae;Yoon, Sun-Kwon;Yoon, Jun-Seo;Moon, Young-Il
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.345-345
    • /
    • 2022
  • 기후변화의 영향으로 도시하천의 홍수피해가 증가추세이며, 여름철 돌발호우 발생으로 하천내 고립사고 피해가 빈번히 발생하고 있다. 특히 중·소규모 도시하천은 홍수유출 도달시간이 매우 짧고 수위가 급격히 상승하여 돌발호우에 매우 취약하므로, 정확한 홍수발생 가능성 및 시점 예측을 통한 신속한 홍수 예·경보가 필요하다. 따라서 본 연구에서는 강우강도, 강우시간분포, 강우지속시간 등에 따른 홍수발생여부 뿐만 아니라 홍수발생시간을 예측할 수 있는 Flooding Time Nomograph (FTN)를 개발하였다. 본 연구의 대상유역은 도림천 유역으로, FTN 개발을 위하여 도시하천의 강우-유출모의에 적합한 XP-SWMM 모형을 구축하여 활용하였다. 또한 Huff의 4분위 강우분포를 이용한 다양한 형태의 가상 강우시나리오를 설정하여 강우유출모의를 수행하였으며, 모의결과를 기반으로 강우강도와 홍수발생시간의 관계식을 산정하여 FTN을 생성하였다. 실제 호우 사상에 대한 관측 홍수발생시간과의 비교를 통해 FTN의 적용성을 평가한 결과, 상관계수 CC=0.8, NSE=0.6 이상으로 높은 정확도를 보이는 것으로 나타났으며, 강우발생 시 둔치수위 도달 홍수위 기준 최대 30분의 사전 대피시간 확보가 가능함을 확인하였다. 따라서 본 연구에서 개발한 FTN을 이용한 도시하천의 홍수 예·경보 시스템 구축의 경우, 강우정보에 따른 홍수발생여부 및 홍수발생시간을 합리적으로 판단할 수 있어, 둔치 수위 예·경보 등 보다 신속한 상황대응이 가능할 것으로 사료된다.

  • PDF

Low Impact Urban Development For Climate Change and Natural Disaster Prevention

  • Lee, Jung-Min;Jin, Kyu-Nam;Sim, Young-Jong;Kim, Hyo-Jin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.54-55
    • /
    • 2015
  • Increase of impervious areas due to expansion of housing area, commercial and business building of urban is resulting in property change of stormwater runoff. Also, rapid urbanization and heavy rain due to climate change lead to urban flood and debris flow damage. In 2010 and 2011, Seoul had experienced shocking flooding damages by heavy rain. All these have led to increased interest in applying LID and decentralized rainwater management as a means of urban hydrologic cycle restoration and Natural Disaster Prevention such as flooding and so on. Urban development is a cause of expansion of impervious area. It reduces infiltration of rain water and may increase runoff volume from storms. Low Impact Development (LID) methods is to mimic the predevelopment site hydrology by using site design techniques that store, infiltrate, evaporate, detain runoff, and reduction flooding. Use of these techniques helps to reduce off-site runoff and ensure adequate groundwater recharge. The contents of this paper include a hydrologic analysis on a site and an evaluation of flooding reduction effect of LID practice facilities planned on the site. The region of this Case study is LID Rainwater Management Demonstration District in A-new town and P-new town, Korea. LID Practice facilities were designed on the area of rainwater management demonstration district in new town. We performed analysis of reduction effect about flood discharge. SWMM5 has been developed as a model to analyze the hydrologic impacts of LID facilities. For this study, we used weather data for around 38 years from January 1973 to August 2014 collected from the new town City Observatory near the district. Using the weather data, we performed continuous simulation of urban runoff in order to analyze impacts on the Stream from the development of the district and the installation of LID facilities. This is a new approach to stormwater management system which is different from existing end-of-pipe type management system. We suggest that LID should be discussed as a efficient method of urban disasters and climate change control in future land use, sewer and stormwater management planning.

  • PDF

Determination of Optimal Operation Water Level of Rain Water Pump Station using Optimization Technique (최적화 기법을 이용한 빗물펌프장 최적 운영수위 결정)

  • Sim, Kyu-Bum;Yoo, Do-Guen;Kim, Eung-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.337-342
    • /
    • 2018
  • A rain water pumping station is a structural countermeasure to inland flooding of domestic water generated in a urban watershed. In this study, the optimal operation water level of the pump with the minimum overflow was determined based on the opinions of the person in charge of the operation of the rain water pump station. A GA (Genetic Algorithm), which is an optimization technique, was used to estimate the optimal operation water level of the rain water pump station and was linked with SWMM (Ver.5.1) DLL, which is a rainfall-runoff model of an urban watershed. Considering the time required to maximize the efficiency of the pump, the optimal operating water level was estimated. As a result, the overall water level decreased at a lower operating water level than the existing water level. For most pumps, the lowest operating water level was selected for the operating range of each pump unit. The operation of the initial pump could reduce the amount of overflow, and there was no change in the overflow reduction, even after changing the operation condition of the pump. Internal water flooding reduction was calculated to be 1%~2%, and the overflow occurring in the downstream area was reduced. The operating point of the pump was judged to be an effective operation from a mechanical and practical point of view. A consideration of the operating conditions of the pump in future, will be helpful for improving the efficiency of the pump and to reducing inland flooding.