Proceedings of the Korea Water Resources Association Conference
/
2015.05a
/
pp.179-179
/
2015
Citarum River is one of the important river in West Java, Indonesia. During the rainy season, flood happens almost every year in Upper Citarum Watershed, hence, it is necessary to establish the countermeasure in order to prevent and mitigate flood damages. Since the lack of hydrological data for the modelling is common problem in this area, it is difficult to prepare the countermeasures. Therefore, we used Rainfall-Runoff-Inundation (RRI) Model developed by Sayama et al. (2010) as the hydrological and inundation modelling for evaluating the inundation case happened in Upper Citarum Watershed, West Java, Indonesia and the satellite based information such as rainfall (GSMaP), landuse and so on instead of the limited hydrological data. In addition, 3 arc-second HydroSHEDS Digital Elevation Model (DEM) is used. To verify the model, the observed data of Nanjung water stage gauging station and the daily observation data are used. Simulated inundation areas are compared with the flood extent figure from Upper Citarum Basin Flood Management Project (UCBFM).
During period of the rainy season of spring tide Aug. 2005, the suspended sediment transport rate from Seomjin River increased ten times as high as neap tide of low river discharge. During ebb tide of high terrestrial input, the grain size of suspended particles of both surface and bottom layer of the water column, showed a uni-modal distribution with a dominant peak at coarse fraction, which suggests a characteristic development of floc-sized particles of low mean effective density. On the contrary, the particles supplied toward upstream of Seomjin river from Gwangyang Bay during flood tide showed a bi-modal distribution with a secondary peak at finer fraction, possibly due to the resuspension and the deflocculation associated with the increased shear velocity at near bottom. Break-up of large flocs is also suggested by the increased mean effective density. However, settling velocity was lower during flood tide because of smaller grain size. Thus, net deposition of suspended sediment is expected at within Gwangyang Bay instead of upstream of Seomjin River, even though suspended sediment transport rate at near bottom water was three times higher than that at surface water during flood tide.
In this paper, in order to set up the management system of water quality environment in Gwangyang Bay, the cluster analysis of water quality environment, the estimation of inflowing pollutant loads and residence time of pollutants in this bay was carried out. The Gwangyang Bay was divided into eight sea areas by cluster analysis and spatio-temporal change of water quality. The river discharges in the Bay were calculated about $11,681{\times}103m^3/day$ from the numerical simulation by Tank model. In addition, inflowing pollutant loads of COD, SS, TN, TP, DIN and DIP in Gwangyang Bay were estimated at 398 ton-COD/day, 2,846 ton-SS/day, 195 ton-TN/day, 5 ton-TP/day, 126 ton-DIN/day and 3 ton-DIP/day, respectively. Moreover, residence times of COD, TN and TP in the Bay was estimated at 6 days-COD, 20 days-TN and 195 days-TP, respectively in the dry season, and 3 days-COD, 6 days-TN and 21 days- TP, respectively, in the flood season. The central part of Gwangyang Bay (Region IV) has the longest residence time of overall pollutants.
The burden of flood control on the dam under frequently flood due to climate change and especially heavy flood in 2020 year are come to the forward and increased. The objective of the study is therefore to establish the method to estimate capacity and target water level for flood control in actual dam management. Frequency matching method was applied to establish a pair of cumulative distribution function (CDF) based on daily dam inflow and discharge records. The relationship between dam storage and discharge volume represented as a percentage of inflow volume was derived and its characteristics was analyzed. As the result, the Soyanggang (45%) and Chungju Dam (39%) contributing to flood control with temporarily storing flood runoff. The method and diagram to estimate flood control capacity and target water level for flood control in the dam were established. The result of the study could be used as a supplementary data for flood control of the dam according to the rainfall prediction on the Korea Meteorological Administration.
Kim, Byung-Sik;Hong, Jun-Bum;Choi, Kyu-Hyun;Yoon, Seok-Young
Proceedings of the Korea Water Resources Association Conference
/
2006.05a
/
pp.1145-1149
/
2006
The typhoon Rusa passed through the Korean peninsula from the west-southern part to the east-northern part in the summer season of 2002. The flash flood due to the Rusa was occurred over the Korean peninsula and especially the damage was concentrated in Kangnung, Yangyang, Kosung, and Jeongsun areas of Kangwon-Do. Since the latter half of the 1990s the flash flood has became one of the frequently occurred natural disasters in Korea. Flash floods are a significant threat to lives and properties. The government has prepared against the flood disaster with the structural and nonstructural measures such as dams, levees, and flood forecasting systems. However, since the flood forecasting system requires the rainfall observations as the input data of a rainfall-runoff model, it is not a realistic system for the flash flood which is occurred in the small basins with the short travel time of flood flow. Therefore, the flash flood forecasting system should be constructed for providing the realistic alternative plan for the flash flood. To do so, firstly, Flash Flood Monitoring and Prediction (FFMP) Model must be developed suitable to Korea terrain. In this paper, We develop the FFMP model which is based on GIS, Radar techniques and hydro-geomorphologic approaches. We call it the F2MAP model. F2MAP model has three main components (1) radar rainfall estimation module for the Quantitative Precipitation Forecasts (QPF), (2) GIS Module for the Digital terrain analysis, called TOPAZ(Topographic PArametiZation), (3) hydrological module for the estimation of threshold runoff and Flash Flood Guidance(FFG). For the performance test of the model developed in this paper, F2MAP model applied to the Kangwon-Do, Korea, where had a severe damage by the Typhoon Rusa in August, 2002. The result shown that F2MAP model is suitable for the monitoring and the prediction of flash flood.
Kim, Gi-Hyun;Lee, Sang-Ick;Bae, Seok-Myung;Jung, Chan-Oong;Lee, Jae-Yong
The Transactions of the Korean Institute of Electrical Engineers P
/
v.58
no.1
/
pp.90-94
/
2009
The inundation of substation and ground power equipment breaks out every summer season in low-lying downtown and low-lying shore by localized heavy rain, typhoon and tidal wave. For diminishing flood damage of electrical equipment in the root, flood protection system which is used the basic frame of Pad transformer is developed using pneumatic pressure. This system is established on pressure generator equipment and sensor of flooded level operates at flooding occurrence and is maintained a shutting tightly structure. The system is able to protect indraft water in Pad Transformer and supply the electricity at emergency(flooding). And we tested safety for insulation resistance at flooding and applying an electrical current. We estimate that loss cost which is caused by with flooding and the power failure will be diminished if it is addition to advances the reliability evaluation by setting an example.
In this study we analyzed flood runoff and flood characteristics of an small urban river basin which is in an apartment complex in Yewol-Dong, Buchun-Si, Gyunggi-Do. A little discharge normally flows in the river, however this small river has a relatively high potential of flood damage risk in the flood season due to the high flood level and velocity. Therefore we used the GIS data, cross section data in the river, HEC-RAS model, etc. for investigating safety of a river against flood runoff and also we investigated the stability of hydraulic structures and ability of flood prevention in the river. As the result of investigation, we found that the river had the risk of flood damage occurrence due to the hydraulic structures constructed for various purposes in the river. So we should analyze backwater effect by the structures and consider the risk factors can be occurred by the flood runoff and velocity for more safe design of a small river basin in the residential area such as an apartment complex in the urban area.
Lee, Tae Hee;Lim, Hyeokjin;Yun, Seong Hak;Kang, Jong Wan
Journal of Korea Water Resources Association
/
v.53
no.12
/
pp.1049-1057
/
2020
This study aimed to develop a flow measurement method using drone in flood season. Measuring flow in all branches is difficult to conduct annually due to budget and labor limitation, safety and river works. Especially when heavy rain like storm comes, changes in stage-discharge relationship should be reviewed; however, it is usually impeded by the aforementioned issues. To solve the problem, it developed a simple measuring method with a minimum of labor and time. A numeric map and numeric orthophoto coordinate of South Korea are mostly based on Transverse Mercator Projection (TM) in accordance with rectangular coordinate system and use World Geodetic Reference System 1980 (GRS80) oval figure for conversion. Applying a concept of aerial photogrammetry, it located four visible Ground Control Points (GCP) near the river at Uijeongbu-si (Singok Bridge) and Yeongdong-gun (Youngdong 2nd Bridge) station and measured the coordinates using VRS DGPS. Hovering at a same level, drones took orthophoto of water surface at an interval of 3 seconds. It defined the pictures with GRS80 TM coordinate system, a rectangular coordinate system and then conducted an orthometric correction using GCP coordinates. According to X and Y coordinate analysis, it estimated the distance between the floating positions at 3 seconds-intervals and calculated the flow through the flow area according to the flow path. This study attested applicability of the flow measurement method using drone in flood season by applying the rectangular coordinate system based on the concept of aerial photogrammetry.
In Korea, every year during the summer season, typhoons and torrential rains cause floods and damage to property. In particular, the Imjin River basin is characterized by steep slopes, narrow upstream areas, and low flat downstream areas, which are vulnerable to floods. In addition, damages occurred due to unauthorized discharge in the Hwanggang Dam, a large dam upstream of the Imjin River in North Korea. In order to prevent such flood damage, Korea is constructing the Gunnam Flood Control Site in 2010 to prevent flood damage. However, even after the construction of the flood control zone, the flood control capacity is only 20% of the maximum water level of the Hwanggang dam. This study used LAHARZ_py program to calculate flood damage area in the northern part of Gyeonggi province. As a result, when the discharge of Hwanggang dam exceeding the flood control ability of Gunnam flood control zone occurs, damage to Yeoncheon-gun and Paju-si of Gyeonggi-do was expected. This study will be useful as a material to prepare for flood damage.
Park, Sang Doeg;Lee, Seungkyu;Shin, Seung Sook;Yoon, Byung Man
Journal of Wetlands Research
/
v.18
no.4
/
pp.413-423
/
2016
Effects of the design flood share of the Kyeongpo retarding basin, which has a function for flood control of the Kyeongpo river assigned to the Kyeongpo prickly water lily wetland, on the Kyeongpo lake and the downstream of Kyeongpo river were analyzed on the bassis of the hydraulic experiments and the numerical simulations using RMA-2 model. Reproducing a complex water flow system of the area of Kyeongpo lake, the unsteady flow simulations were performed. The data obtained in hydraulic experiments were used to determine parameters of the numerical model which simulated the flows for various flood scenarios in the downstream area of Kyeongpo river. With increasing the design flood share rates in the retarding basin, the water level was increased in the lake and is decreased in the river. The characteristics of flood flow interaction between Kyeongpo river and Kyeongpo lake were understood. These results may be used to management the Kyeongpo lake during flood season.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.