• Title/Summary/Keyword: Flood level

Search Result 756, Processing Time 0.028 seconds

Evaluation of Flood Regulation Service of Urban Ecosystem Using InVEST mode (InVEST 모형을 이용한 도시 생태계의 홍수 조절서비스 평가)

  • Lee, Tae-ho;Cheon, Gum-sung;Kwon, Hyuk-soo
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.25 no.6
    • /
    • pp.51-64
    • /
    • 2022
  • Along with the urbanization, the risk of urban flooding due to climate change is increasing. Flood regulation, one of the ecosystem services, is implemented in the different level of function of flood risk mitigation by the type of ecosystem such as forests, arable land, wetlands etc. Land use changes due to development pressures have become an important factor in increasing the vulnerability by flash flood. This study has conducted evaluating the urban flood regulation service using InVEST UFRM(Urban Flood Risk Model). As a result of the simulation, the potential water retention by ecosystem type in the event of a flash flood according to RCP 4.5(10 year frequency) scenario was 1,569,611 tons in urbanized/dried areas, 907,706 tons in agricultural areas, 1,496,105 tons in forested areas, 831,705 tons in grasslands, 1,021,742 tons in wetlands, and 206,709 tons in bare areas, the water bodies was estimated to be 38,087 tons. In the case of more severe 100-year rainfall, 1,808,376 tons in urbanized/dried areas, 1,172,505 tons in agricultural areas, 2,076,019 tons in forests, 1,021,742 tons in grasslands, 47,603 tons in wetlands, 238,363 tons in bare lands, and 52,985 tons in water bodies. The potential economic damage from flood runoff(100 years frequency) is 122,512,524 thousand won in residential areas, 512,382,410 thousand won in commercial areas, 50,414,646 thousand won in industrial areas, 2,927,508 thousand won in Infrastructure(road), 8,907 thousand won in agriculture, Total of assuming a runoff of 50 mm(100 year frequency) was estimated at 688,245,997 thousand won. In a conclusion. these results provided an overview of ecosystem functions and services in terms of flood control, and indirectly demonstrated the possibility of using the model as a tool for policy decision-making. Nevertheless, in future research, related issues such as application of models according to various spatial scales, verification of difference in result values due to differences in spatial resolution, improvement of CN(Curved Number) suitable for the research site conditions based on actual data, and development of flood damage factors suitable for domestic condition for the calculation of economic loss.

Development of artificial intelligence-based river flood level prediction model capable of independent self-warning (독립적 자체경보가 가능한 인공지능기반 하천홍수위예측 모형개발)

  • Kim, Sooyoung;Kim, Hyung-Jun;Yoon, Kwang Seok
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.12
    • /
    • pp.1285-1294
    • /
    • 2021
  • In recent years, as rainfall is concentrated and rainfall intensity increases worldwide due to climate change, the scale of flood damage is increasing. Rainfall of a previously unobserved magnitude falls, and the rainy season lasts for a long time on record. In particular, these damages are concentrated in ASEAN countries, and at least 20 million people among ASEAN countries are affected by frequent flooding due to recent sea level rise, typhoons and torrential rain. Korea supports the domestic flood warning system to ASEAN countries through various ODA projects, but the communication network is unstable, so there is a limit to the central control method alone. Therefore, in this study, an artificial intelligence-based flood prediction model was developed to develop an observation station that can observe water level and rainfall, and even predict and warn floods at once at one observation station. Training, validation and testing were carried out for 0.5, 1, 2, 3, and 6 hours of lead time using the rainfall and water level observation data in 10-minute units from 2009 to 2020 at Junjukbi-bridge station of Seolma stream. LSTM was applied to artificial intelligence algorithm. As a result of the study, it showed excellent results in model fit and error for all lead time. In the case of a short arrival time due to a small watershed and a large watershed slope such as Seolma stream, a lead time of 1 hour will show very good prediction results. In addition, it is expected that a longer lead time is possible depending on the size and slope of the watershed.

A Study on Making Map of Flood Using Digital Elevation Model (DEM) (수치표고모형 (DEM)을 이용한 침수재해 지도작성에 관한 연구)

  • Lim, Hyun Taek;Kim, Jae Hwi;Lee, Hak Beom;Park, Sung Yong;Kim, Yong Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.59 no.2
    • /
    • pp.81-90
    • /
    • 2017
  • Recent floodplain data are important for river master plan, storm and flood damage reduction comprehensive plan and pre-disaster impact assessment. Hazard map, base of floodplain data, is being emphasized as important method of non-structural flood prevention and consist of inundation trace map, inundation expected map and hazard information map. Inundation trace map describes distribution of area that damaged from typhoons, heavy rain and tsunamis and includes identified flood level, flood depth and flood time from flooding area. However due to lack of these data by local government, which are foundational and supposed to be well prepared nationwide, having hard time for making inundation trace map or hazard information map. To overcome this problem, time consumption and budget reduction is required through various research. From this study, DEM (Digital Elevation Model) from image material from UAVS (Unmanned Aerial Vehicle System) and numeric geographic map from National Geographic Information Institute are used for calculating flooding damaged area and compared with inundation trace map. As results, inundation trace map DEM based on image material from UAVS had better accuracy than that used DEM based on numeric geographic map. And making hazard map could be easier and more accurate by utilizing image material from UAVS than before.

Flood risk estimation with scenario-based, coupled river-overland hydrodynamic modeling (시나리오 기반 하천-제내지 연계 통합수리해석에 의한 홍수위험도 산정)

  • Lee, Jae Young;Nam, Myeong Jun;Kwon, Hyun Han;Kim, Ki Young
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.9
    • /
    • pp.773-787
    • /
    • 2016
  • A coupled river-overland hydrodynamic model was applied to estimate flood risk by a scenario-based approach. The study area is Seongseo Industrial Complex in Daegu which is located near Nakdong river and Geumho river. Inundation depth and velocity at each time were calculated by applying a coupled 1D/2D hydrodynamic model to the target area of interest. The 2D inundation analysis for river and overland domain was performed with the scenario-based approach that there are levee overflow against 100/200 year high quantile (97.5%) design flood and levee break against 100/200 year normal quantile (50%) design flood. The level of flood risk was displayed for resident/industrial area using information about maximum depth and velocity of each node computed from the 2D inundation map. The research outcome would be very useful in establishing specified emergency action plans (EAP) in case of levee break and overflowing resulting from a flood.

Establishment of flood forecasting and warning system in the un-gauged small and medium watershed through ODA (ODA사업을 통한 미계측 중소하천 유역 홍수예경보시스템 구축)

  • Koh, Deuk-Koo;Lee, Chihun;Jeon, Jeibok;Go, Sukhyon
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.6
    • /
    • pp.381-393
    • /
    • 2021
  • As part of the National Disaster Management Research Institute's Official Development Assistance (ODA) projects for transferring new technologies in the field of disaster-safety management, a flood forecasting and warning system was established in 2019 targeting the Borikhan in the Namxan River Basin in Bolikhamxai Province, Laos. In the target area, which is an ungauged small and medium river basin, observation stations for real-time monitoring of rainfall and runoff and alarm stations were installed, and a software that performs real-time data management and flood forecasting and warning functions was also developed. In order to establish a flood warning standard and develop a nomograph for flood prediction, hydraulic and hydrological analysis was performed based on the 30-year annual maximum daily rainfall data and river morphology survey results in the target area. This paper introduces the process and methodology used in this study, and presents the results of the system's applicability review based on the data observed and collected in 2020 after system installation.

Implementation of CNN-based classification model for flood risk determination (홍수 위험도 판별을 위한 CNN 기반의 분류 모델 구현)

  • Cho, Minwoo;Kim, Dongsoo;Jung, Hoekyung
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.3
    • /
    • pp.341-346
    • /
    • 2022
  • Due to global warming and abnormal climate, the frequency and damage of floods are increasing, and the number of people exposed to flood-prone areas has increased by 25% compared to 2000. Floods cause huge financial and human losses, and in order to reduce the losses caused by floods, it is necessary to predict the flood in advance and decide to evacuate quickly. This paper proposes a flood risk determination model using a CNN-based classification model so that timely evacuation decisions can be made using rainfall and water level data, which are key data for flood prediction. By comparing the results of the CNN-based classification model proposed in this paper and the DNN-based classification model, it was confirmed that it showed better performance. Through this, it is considered that it can be used as an initial study to determine the risk of flooding, determine whether to evacuate, and make an evacuation decision at the optimal time.

Rainfall Forecasting Using Satellite Information and Integrated Flood Runoff and Inundation Analysis (II): Application and Analysis (위성정보에 의한 강우예측과 홍수유출 및 범람 연계 해석 (II): 적용 및 분석)

  • Choi, Hyuk Joon;Han, Kun Yeun;Kim, Gwangseob
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.6B
    • /
    • pp.605-612
    • /
    • 2006
  • In this study(II), The developed rainfall forecast model was applied to the NakDong River Basin for the heavy rainfall on 6th to 16th of August in 2002. The results demonstrated that the rainfall forecasts of 3 hours lead time showed good agreement with observed data. The inundation aspect of simulation depends on actual levee failure in the same basin. Rainfall forecasts were used for flood amount computation in the target watershed. Also the flood amount in the target watershed was used on boundary condition for flood inundation simulation in a protected lowland and a river. The results of simulation are consistent with actuality inundation traces and flood level data of the target watershed. This study provides practical applicability of satellite data in rainfall forecast of extreme events such as heavy rainfall or typhoon. Also this study presented an advanced integrated model of rainfall, runoff, and inundation analysis which can be applicable for flood disaster prevention and mitigation.

Optimized Flooding Analysis Method for Compartment for Nuclear Power Plant (원전 격실에 대한 최적 침수분석 방법)

  • Song, Dong-Soo;Kim, Sang-Yeol
    • Journal of Energy Engineering
    • /
    • v.21 no.1
    • /
    • pp.75-80
    • /
    • 2012
  • In this paper a realistic bounding method for flooding analysis following rupture of large size of thanks and piping is defined. Mass and energy release during main feedwater line break accident is analyzed with RETRAN code. It is modeled that the main feed water control valve is closed in 5.0 seconds after reactor trip. In result of the analysis, largest mass and energy is discharged at 70% reactor power. The flood sources for main feedwater room are calculated when piping failure occurs in the high energy line and medium energy line. Based on the result of flood level (1.43m), it is investigated that all of the safety-related environmental qualification equipments are well located above the flood level.

Development of Multi-Sensor based River Monitoring Technology for River Flood Risk surveillance (하천 홍수 위험 감시를 위한 다중센서 기반 하천 관측 기술 개발)

  • Jang, Bong-Joo;Jung, In Taek
    • Journal of Korea Multimedia Society
    • /
    • v.23 no.11
    • /
    • pp.1372-1382
    • /
    • 2020
  • This paper proposes a core technology for a micro river monitoring terminal device suitable for flood monitoring in small rivers and valleys. Our proposed device is basically equipped with a 77GHz radar, gyro and accelerometer sensors. To measure the flow velocity and water level, we proposed a signal processing technique that extracts pure water energy components from the observed Doppler velocity and reflection intensity from the radar. And to determine the stability of the river structure equipped with our device, we constantly monitor the displacement of the measured values of the gyro and accelerometer sensors. Experimental result verified that our method detects pure water energy in various river environments and distinguishes between flow velocity and water level well. And we verified that vibration and position change of structures can be determined through a gyro sensor. In future research, we will work to build a secure digital twin river network by lowering the cost of supplying RF-WAV devices. Also we expect our device to contribute to securing a preventive golden time in rivers.

Study on the Fluctuation System of River Level Using GIS Data (GIS자료를 이용한 하천수위 예측시스템 구축)

  • Kang Sang-Hyeok;Choi Jong-In
    • Spatial Information Research
    • /
    • v.12 no.3
    • /
    • pp.229-237
    • /
    • 2004
  • Debris flow in the mountainous river gives rise to serious environmental and flooding problems. According to flood white book of Kangwon-do in 2002, over 30% of total of flooding victims are attributable to debris flow. But it has been neglected to build countermeasure to minimize victims due to lack of collected data and knowledge in field of the sediment yield of mountainous river. The study calculated hydraulic and hydrological fluctuation for rainfall condition using GIS data, after all we estimated the water surface of flood caused by bed fluctuation. These efforts will of for effective information for planning of river management.

  • PDF