• Title/Summary/Keyword: Flood level

Search Result 756, Processing Time 0.03 seconds

Flood Forecasting and Warning Using Neuro-Fuzzy Inference Technique (Neuro-Fuzzy 추론기법을 이용한 홍수 예.경보)

  • Yi, Jae-Eung;Choi, Chang-Won
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.3
    • /
    • pp.341-351
    • /
    • 2008
  • Since the damage from the torrential rain increases recently due to climate change and global warming, the significance of flood forecasting and warning becomes important in medium and small streams as well as large river. Through the preprocess and main processes for estimating runoff, diverse errors occur and are accumulated, so that the outcome contains the errors in the existing flood forecasting and warning method. And estimating the parameters needed for runoff models requires a lot of data and the processes contain various uncertainty. In order to overcome the difficulties of the existing flood forecasting and warning system and the uncertainty problem, ANFIS(Adaptive Neuro-Fuzzy Inference System) technique has been presented in this study. ANFIS, a data driven model using the fuzzy inference theory with neural network, can forecast stream level only by using the precipitation and stream level data in catchment without using a lot of physical data that are necessary in existing physical model. Time series data for precipitation and stream level are used as input, and stream levels for t+1, t+2, and t+3 are forecasted with this model. The applicability and the appropriateness of the model is examined by actual rainfall and stream level data from 2003 to 2005 in the Tancheon catchment area. The results of applying ANFIS to the Tancheon catchment area for the actual data show that the stream level can be simulated without large error.

Development of a Web GIS-Based Real-Time Agricultural Flood Management System (웹 GIS 기반 실시간 농촌홍수관리시스템 개발)

  • Jung, Hyuk;Jung, In-Kyun;Park, Jong-Yoon;Kim, Seong-Joon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.15 no.4
    • /
    • pp.15-25
    • /
    • 2012
  • This study is to develop a web-based real-time agricultural flood management system(RAFMS) for 378 agricultural reservoirs equipped with auto water level gauge stations. The RAFMS was designed to operate linking with Rural Agricultural Water Resource Information System(RAWRIS) which supports data viz. real-time rainfall and water level necessary for RAFMS. The system was constituted to monitor the floods simultaneously at each reservoir by calculating the real-time reservoir inflow from watersheds, water level, and release to downstream. In addition, the system has the prediction function for the flood by applying weather forecasting data from Korea Meteorological Administration(KMA).

A study on the quick graphical method of flood routing (홍수추적 속산도식해법에 대한 소고)

  • 박정근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.1
    • /
    • pp.4079-4086
    • /
    • 1976
  • In many reservoir projects, economic considerations will necessitate a design utilizing surcharge. Determination of the most economical combination of surcharge and spillway capacity for a given spillway crest level will require flood routing studies and economic studies of the dam-reservoir-spillway combinations. Many methods of actual flood routing have been devised, each of them with its advantages and disadvantages. Some of these methods are listed below: (1) Arithmetical trial-and-error method. (2) Modified Puls' method (3) Cheng's graphical method (4) Horton's arithmetical method (5) Ekadahl's arithmetical method (6) Digital computer programming. For the purpose of preliminary design and cost estimating of dams and spillways, it is often required to estimate, for a given design flood and spillway crest level. the approximate values of two among the three characteristics of the spillway spillway length, maximum discharge and surcharge depth at maximum discharge, when one of these quantities is given. As is well known, the outflow hydrograph for an ungated overflow spillway assumes the form of a wave-shaped curve with a minimum point for Q=o At zero time and a maximum point for Q=Qmax at its intersection with the falling leg of the inflow hydrograph (see Fig. 4) The shaded area between the inflow and outflow hydrographs represents at the approximate scale the temporary retention Vt. In line with the remarks, draw by free hand the assumed outflow hydrograph with its maximum point for the given Qmax (see Fig. 4) and by planimetration find Vt. From the reservoir capacity curve (Fig. 3) find Vs for the given spillway crest level and make V=Vs+Vt. From the above curve find surcharge water elevation for V and surcharge depth Hmax over spillway crest. From the discharge formula compute {{{{L= { Q} over { { CH}^{3/2 } } }}}} The methed provides a means for a quick and fairly accurate estimation of spillway capacity.

  • PDF

Application of a Two-dimensional Flood Inundation Model based on Quadtree Grid (사면구조 격자 기법에 의한 2차원 홍수범람모형의 적용)

  • Kim, Jong-Ho;Lee, Seung-Oh;Yoon, Kwang-Seok;Cho, Yong-Sik
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.3
    • /
    • pp.129-136
    • /
    • 2008
  • All measures to cope with flooding rely on flood predictions to some extent. To investigate these predictions such as maximum water level or inundation area, a numerical model has been developed. The governing equations of the model are the two-dimensional Saint-Venant equations. The governing equations are discretized explicitly by using the leap-frog scheme and upwind scheme based on quadtree grids. The predicted numerical results have been verified by comparing to those of a Thacker problem. As a result of verifications, the present model is not only nearly four times as efficient as uniform grids but also in close agreement with the previous models. Next, the developed model is applied to several flood events in the Uiryeong basin. A general tendency is found that as a frequency is increasing, overall water levels including peak water level are increasing. At only a 500 year frequency, maximum water level is higher than 18.5 m. Therefore, it can be predictable that inundation will be generated in a 500 year frequency.

Estimation of the Water Surface Slope by the River Bend Curvature and Flood Discharge (하천 만곡률과 홍수량에 따른 수면경사도 산정)

  • Choi, Han-Kuy;Lee, Mun-Hee;Baek, Hyo-Sun;Park, Soo-Jin
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.7 no.2 s.25
    • /
    • pp.65-71
    • /
    • 2007
  • In this research, we made a one and two-dimensional analysis of numerical data collected from the bend curvature of a bended river section. According to the result from the numerical analysis, the inflow & output angle caused a water level deviation which increased with an increase of the flood discharge. From the water level deviation of our two-dimensional numerical model, we obtained the maximum slope of 6,67% when the inflow and output angle was 105 degrees and the flood discharge was 500 CMS. As for the right side, the differences with the one-dimensional numerical model were reduced when the angle was more than $90^{\circ}$. As for the left side the differences were reduced when the angle was more than $105^{\circ}$. For a river with more than 90 degrees bend curvature, a hydraulic experiment would be more appropriate than a numerical analysis.

A Study on the Scour Depth Equation in Bight River (하천 만곡부에서의 세굴심 산정식에 관한 연구)

  • Choi, Han-Kuy;Park, Je-Wan;Park, Soo-Jin
    • Journal of Industrial Technology
    • /
    • v.32 no.A
    • /
    • pp.47-55
    • /
    • 2012
  • Currently, we only estimate the average flood water level by the cross-sections of the river using one-dimensional numerical analysis when establishing the basic plans. However, the reliability decreases when it comes to the river bend. In river bend, the difference of water-level between the inside and the outside of the river arises by centrifugal force. And it is estimated less than what it could be estimated when establishing the plan with average estimate of flood level. It is apprehended that the exterior of the river will be under-constructed when establishing the scour depth only with the mean depth. In the case of local scour of the abutment, it is difficult to estimate its depth precisely, and it tends to be over-estimated in the case of the empirical formulas. Therefore, the modification considering the deviation of the water depth of the exterior of the river bend is needed. In observing the deviation of each formula in river bend, it is found: Andru's formula for 58%, followed by the Laursen's for 26%, and the C.S.U's for 17% in pier, while it is 44% for Froehlich's formula in abutment. Under the 500CMS of the flood discharge, the deviation of the scour depth between pier and abutment was about 10 %. However, in further flood discharge, it shows 24~58% the biggest in deviation of piers. It is concluded that the scour depth estimate should be done with 2-dimensional numerical analysis.

  • PDF

Comparative study of meteorological data for river level prediction model (하천 수위 예측 모델을 위한 기상 데이터 비교 연구)

  • Cho, Minwoo;Yoon, Jinwook;Kim, Changsu;Jung, Heokyung
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.05a
    • /
    • pp.491-493
    • /
    • 2022
  • Flood damage due to torrential rains and typhoons is occurring in many parts of the world. In this paper, we propose a water level prediction model using water level, precipitation, and humidity data, which are key parameters for flood prediction, as input data. Based on the LSTM and GRU models, which have already proven time-series data prediction performance in many research fields, different input datasets were constructed using the ASOS(Automated Synoptic Observing System) data and AWS(Automatic Weather System) data provided by the Korea Meteorological Administration, and performance comparison experiments were conducted. As a result, the best results were obtained when using ASOS data. Through this paper, a performance comparison experiment was conducted according to the input data, and as a future study, it is thought that it can be used as an initial study to develop a system that can make an evacuation decision in advance in connection with the flood risk determination model.

  • PDF

Development of Fragility Curves for Slope Stability of Levee under Rapid Drawdown (수위급강하에 대한 제방 사면의 취약도 곡선 작성)

  • Cho, Sung-Eun
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.10
    • /
    • pp.27-39
    • /
    • 2023
  • To effectively manage flood risk, it is crucial to assess the stability of flood defense structures like levees under extreme flood conditions. This study focuses on the time-dependent probabilistic assessment of embankment slope stability when subjected to rapid water level drops. We integrate seepage analysis results from finite element analysis with slope stability analysis and employ Monte Carlo simulations to investigate the time-dependent behavior of the slope during rapid drawdown. The resulting probability of failure is used to develop fragility curves for the levee slope. Notably, the probability of slope failure remains low up to a specific water level, sharply increasing beyond that threshold. Furthermore, the fragility curves are strongly influenced by the rate of drawdown, which is determined through hydraulic analysis based on flood scenarios. Climate change has a significant impact on the stability of the water-side slope of the embankment due to water level fluctuations.

Estimation of Flash Flood Guidance considering Uncertainty of Rainfall-Runoff Model (강우-유출 모형의 불확실성을 고려한 돌발홍수기준)

  • Lee, Keon-Haeng;Kim, Hung-Soo;Kim, Soo-Jun;Kim, Byung-Sik
    • Journal of Wetlands Research
    • /
    • v.12 no.3
    • /
    • pp.155-163
    • /
    • 2010
  • The flash flood is characterized as flood leading to damage by heavy rainfall occurred in steep slope and impervious area with short duration. Flash flood occurs when rainfall exceeds Flash Flood Guidance(FFG). So, the accurate estimation of FFG will be helpful in flash flood forecasting and warning system. Say, if we can reduce the uncertainty of rainfall-runoff relationship, FFG can be estimated more accurately. However, since the rainfall-runoff models have their own parameter characteristics, the uncertainty of FFG will depend upon the selection of rainfall-runoff model. This study used four rainfall-runoff models of HEC-HMS model, Storage Function model, SSARR model and TANK model for the estimation of models' uncertainties by using Monte Carlo simulation. Then, we derived the confidence limits of rainfall-runoff relationship by four models on 95%-confidence level.

Hydrological Stability Analysis of the Existing Soyanggang Multipurpose Dam

  • Ko, Seok-Ku;Shin, Yong-Lo
    • Korean Journal of Hydrosciences
    • /
    • v.7
    • /
    • pp.37-49
    • /
    • 1996
  • This study aims at suggesting an alternative to improve flood controling capacity according to the cument design criteria for the existing Soyanggang Multi-purpose Dam which was constructed 20 years ago as the largest dam in Korea. The peak inflow of the adopted probable maximum flood (PMF) at the time of construction was 13,500 $m^3$/s. However, the newly estimated peak inflow of the PMF is 18,000 $m^3$/s which is 1.34 times bigger than the original one. This is considered to be due to the accumulation of the reliable flood and storm event records after construction, and due to the increasing tendency of the local flood peaks according to the influence of world-wide weather change. The new estimation of the probable maximum precipitation (PMP) was based on the hydro-meteorological method suggested by the guideline of the World Meteorological Organization (WMO). The unit hydrograph which was applied for the estimation of PMF was derived through linear programming algorithm by minimizing the sum of absolute deviations of the calculated and recorded flood hydrographs. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared : (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing spillway, (3) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang dam, (4) raising the existing dam crest. The preliminary evaluation of these alternatives resulted in that the second alternative is most economic and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multipurpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF