• Title/Summary/Keyword: Flood damages

Search Result 220, Processing Time 0.033 seconds

Changes in Water Depth and Velocity by Debris around Piers (교각 주위내 부유잡목에 의한 수위 및 유속변화에 관한 연구)

  • Choi, Gye-Woon;Kim, Gee-Hyoung;Park, Yong-Sup
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.2
    • /
    • pp.273-284
    • /
    • 2003
  • In this paper, the reasons of damages and the case study are review in which bridge pier with debris accumulation, and safety Influence factors by debris around the bridge piers are review. Also experiment Is conducted for the characteristic of flow around piers by different area and angle of debris and the basic characteristics was review for safe design of bridge and embankments. As result of review of several standards of design, hydraulic structure's freeboard is simply decided by discharge, so it needs more detail standards. And as result of experiment, in the case of that water depth is deep and velocity is slow, variation of water depth Is more increase as increasing of debris. Therefore the variation regime of flow characteristics like velocity and water depth by debris is more large in the stream of small or medium size, which streams have large water depth and slow velocity so Froude Number Is expressed as small in the flood. Also when Froude Number is about 0.5, the water elevation is over freeboard in the standard if the debris over 20%. Therefore when hydraulic structure is constructed in the stream of small or medium size, it need to conduct more detail experiments about influence of debris, distribution of velocity and variation of elevation, and than the more safe freeboard will be presented using the experimental results.

Analysis of Village Safety Index using Accessibility to Public Facilities (공공시설 접근성을 통한 마을단위 안전지수 분석)

  • Jeon, Jeongbae;Kim, Solhee;Suh, Kyo;Yoon, Seongsoo
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.2
    • /
    • pp.121-129
    • /
    • 2016
  • A disaster can be defined in many ways based on perspectives, in addition, its types are able to classify differently by various standards. Considering the different perspectives, the disaster can be occurred by natural phenomenon that is like typhoon, earthquake, flood, and drought, and by the accident that is like collapse of facilities, traffic accidents, and environmental pollution, etc. Into the modern society, moreover, the disaster includes the damages by diffusion of epidemic and infectious disease in domestic animals. The disaster was defined by natural and man-made hazards in the past. As societies grew with changes of paradigm, social factors have been included in the concept of the disaster according to new types unexpected by new disease and scientific technology. Change the concept of social disasters, Ministry of Public Safety and Security (MPSS) has provided the regional safety index, which measures the safety level of a local government. However, this regional safety index has some limitation to use because this index provides the information for city unit which is a unit of administrative districts of urban. Since these administrative districts units are on a different level with urban and rural areas, the regional safety index provided by MPSS is not be able to direct apply to the rural areas. The purpose of this study is to determine the regional safety index targeting rural areas. To estimate the safety index, we was used for 3 indicators of the MPSS, a fire, a crime, and an infectious disease which are evaluable the regional safety index using an accessibility analysis. For determining the regional safety index using accessibility from community centers to public facilities, the safety index of fire, crime, and infectious disease used access time to fire station, police office, and medical facility, respectively. An integrated Cheongju, targeting areas in this study, is mixed region with urban and rural areas. The results of regional safety index about urban and rural areas, the safety index in rural area is relatively higher than in the urban. Neverthless the investment would be needed to improve the safety in the rural areas.

Economic Analysis of Typhoon Surge Floodplain that Using GIS and MD-FDA from Masan Bay, South Korea (MD-FDA와 GIS를 이용한 마산만의 태풍해일 범람구역 경제성 분석)

  • Choi, Hyun;Ahn, Chang-Hwan
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.4
    • /
    • pp.724-729
    • /
    • 2008
  • In the case of 'MAEMI', the Typhoon which formed in September, 2003, the largest-scale damage of tidal wave was caused by the co-occurrence of Typhoon surge and full tide. Until now Korea has been focusing on the calculating the amount of damage and its restoration to cope with these sea and harbor disasters. It is essential to establish some systematic counterplans to diminish such damages of large-scale tidal invasion on coastal lowlands considering the recent weather conditions of growing scale of typhoons. Therefore, the purpose of this research is to make the counterplans for prevention against disasters fulfilled effectively based on the data conducted by comparing and analyzing the accuracy between observation values and the results of estimating the greatest overflow area according to abnormal tidal levels centered on Masan area where there was the severest damage from tidal wave at that time. It's necessary utilize data like high-resolution satellite image and LiDAR(etc.) for correct analysis data considering geographical characteristics of dangerous area from the storm surge. And we must make a solution to minimize the damage by making data of dangerous section of flood into GIS Database using those data (as stated above) and drawing correcter damage function.

Estimating Worst Case Flood and Inundation Damages under Climate Change

  • Kim, Sunmin;Tachikawa, Yasuto;Nakakita, Eiichi
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.189-189
    • /
    • 2016
  • To generate information that contributes to climate change risk management, it is important to perform a precise assessment on the impact in diverse aspects. Considering this academic necessity, Japanese government launched continuous research project for the climate change impact assessment, and one of the representative project is Program for Risk Information on Climate Change (Sousei Program), Theme D; Precise Impact Assessment on Climate Change (FY2012 ~ FY2016). In this research program, quantitative impact assessments have been doing from a variety of perspectives including natural hazards, water resources, and ecosystems and biodiversity. Especially for the natural hazards aspect, a comprehensive impact assessment has been carried out with the worst-case scenario of typhoons, which cause the most serious weather-related damage in Japan, concerning the frequency and scale of the typhoons as well as accompanying disasters by heavy rainfall, strong winds, high tides, high waves, and landslides. In this presentation, a framework of comprehensive impact assessment with the worst-case scenario under the climate change condition is introduced based on a case study of Theme D in Sousei program There are approx. 25 typhoons annually and around 10 of those approach or make landfall in Japan. The number of typhoons may not change increase in the future, but it is known that a small alteration in the path of a typhoon can have an extremely large impact on the amount of rain and wind Japan receives, and as a result, cause immense damage. Specifically, it is important to assess the impact of a complex disaster including precipitation, strong winds, river overflows, and high tide inundation, simulating how different the damage of Isewan Typhoon (T5915) in 1959 would have been if the typhoon had taken a different path, or how powerful or how much damage it would cause if Isewan Typhoon occurs again in the future when the sea surface water temperature has risen due to climate changes (Pseudo global warming experiment). The research group also predict and assess how the frequency of "100-years return period" disasters and worst-case damage will change in the coming century. As a final goal in this research activity, the natural disaster impact assessment will extend not only Japan but also major rivers in Southeast Asia, with a special focus on floods and inundations.

  • PDF

A Study on a Calculation Method of Economical Intake Water Depth in the Design of Head Works (취입모의 경제적 계획취입수심 산정방법에 대한 연구)

  • 김철기
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.20 no.1
    • /
    • pp.4592-4598
    • /
    • 1978
  • The purpose of this research is to find out mathemetically an economical intake water depth in the design of head works through the derivation of some formulas. For the performance of the purpose the following formulas were found out for the design intake water depth in each flow type of intake sluice, such as overflow type and orifice type. (1) The conditional equations of !he economical intake water depth in .case that weir body is placed on permeable soil layer ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } { Cp}_{3 }L(0.67 SQRT { q} -0.61) { ( { d}_{0 }+ { h}_{1 }+ { h}_{0 } )}^{- { 1} over {2 } }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { dcp}_{3 }L+ { nkp}_{5 }+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ] =0}}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }+ { 1} over {2 } C { p}_{3 }L(0.67 SQRT { q} -0.61)}}}} {{{{ { ({d }_{0 }+ { h}_{1 }+ { h}_{0 } )}^{ - { 1} over {2 } }- { { 3Q}_{1 } { p}_{ 6} { { h}_{1 } }^{- { 5} over {2 } } } over { { 2m}_{ 2}m' SQRT { 2gs} }+[ LEFT { b+ { 4C TIMES { 0.61}^{2 } } over {3(r-1) }+z( { d}_{0 }+ { h}_{0 } ) RIGHT } { p}_{1 }L }}}} {{{{+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 } L+dC { p}_{4 }L+(2 { z}_{0 }+m )(1-s) { L}_{d } { p}_{7 }]=0 }}}} where, z=outer slope of weir body (value of cotangent), h1=intake water depth (m), L=total length of weir (m), C=Bligh's creep ratio, q=flood discharge overflowing weir crest per unit length of weir (m3/sec/m), d0=average height to intake sill elevation in weir (m), h0=freeboard of weir (m), Q1=design irrigation requirements (m3/sec), m1=coefficient of head loss (0.9∼0.95) s=(h1-h2)/h1, h2=flow water depth outside intake sluice gate (m), b=width of weir crest (m), r=specific weight of weir materials, d=depth of cutting along seepage length under the weir (m), n=number of side contraction, k=coefficient of side contraction loss (0.02∼0.04), m2=coefficient of discharge (0.7∼0.9) m'=h0/h1, h0=open height of gate (m), p1 and p4=unit price of weir body and of excavation of weir site, respectively (won/㎥), p2 and p3=unit price of construction form and of revetment for protection of downstream riverbed, respectively (won/㎡), p5 and p6=average cost per unit width of intake sluice including cost of intake canal having the same one as width of the sluice in case of overflow type and orifice type respectively (won/m), zo : inner slope of section area in intake canal from its beginning point to its changing point to ordinary flow section, m: coefficient concerning the mean width of intak canal site,a : freeboard of intake canal. (2) The conditional equations of the economical intake water depth in case that weir body is built on the foundation of rock bed ; (a) in the overflow type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{5 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{1 }(1-s) SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L+ { nkp}_{5 }}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0 }}}} (b) in the orifice type of intake sluice, {{{{ { zp}_{1 } { Lh}_{1 }- { { { 3Q}_{1 } { p}_{6 } { h}_{1 } }^{- {5 } over {2 } } } over { { 2m}_{2 }m' SQRT { 2gs} }+[ LEFT { b+z( { d}_{0 }+ { h}_{0 } )RIGHT } { p}_{1 }L+(1+ SQRT { 1+ { z}^{2 } } ) { p}_{2 }L}}}} {{{{+( { 2z}_{0 }+m )(1-s) { L}_{d } { p}_{7 } ]=0}}}} The construction cost of weir cut-off and revetment on outside slope of leeve, and the damages suffered from inundation in upstream area were not included in the process of deriving the above conditional equations, but it is true that magnitude of intake water depth influences somewhat on the cost and damages. Therefore, in applying the above equations the fact that should not be over looked is that the design value of intake water depth to be adopted should not be more largely determined than the value of h1 satisfying the above formulas.

  • PDF

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

Influences of the devastated forest lands on flood damages (Observed at Chonbo and the neighbouring Mt. Jook-yop area) (황폐임야(荒廢林野)가 수해참상(水害慘狀)에 미치는 영향(影響) (천보산(天寶山)과 인접(隣接) 죽엽산(竹葉山)을 중심(中心)으로))

  • Chung, In Koo
    • Journal of Korean Society of Forest Science
    • /
    • v.5 no.1
    • /
    • pp.4-9
    • /
    • 1966
  • 1. On 13 September 1964 a storm raged for 3 hours and 20 minutes with pounding heavy rainfalls, and precipitation of 287.5 mm was recorded on that day. The numerous landslides were occured in the eroded forest land neighbouring Mt. Chunbo, while no landslides recorde at all on Mt. Jookyup within the premise of Kwangnung Experiment Station, the Forest Experiment Station. 2. Small-scalled Landslides were occured in 43 different places of watershed area (21.97 ha.) in which the survey had already been done, in and around Mt. Chunbo (378 m a.s.l.). The accumulated soil amount totaled $2,146,56m^3$ due to the above mentioned landslides, while soil accumulated from riverside erosion has reached to $24,168.79m^3$, consisting of soils, stones, and pebbles. However, no landslides were reported in the Mt. Jook yup area because of dense forest covers. The ratio of the eroded soil amount accumulated from the riversides to that of watershed area was 1 to 25. On the other hand, the loss and damage in the research area of Mt. Chonbo are as follows: 28 houses completly destroyed or missing 7 houses partially destroyed 51 men were dead 5 missing, and 57 wounded. It was a terrible human disaster However, no human casualties were recorded at all, 1 house-completly destroyed and missing, 2 houses-partially destroyed. Total:3 houses were destroyed or damaged, in The area of Mt. Jookyup 3. In the calculation of the quanty of accumulated soil, the or mula of "V=1/3h ($a+{\sqrt{ab}}+b$)" was used and it showed that 24, 168.79m of soil, sands, stones and pebbles carried away. 4. Average slope of the stream stood 15 at the time of accident and well found that there was a correlation between the 87% of cross-area sufferd valley erosion and the length of eroded valley, after a study on regression and correlation of the length and cross-area. In other works, the soil erosion was and severe as we approached to the down-stream, counting at a place of average ($15^{\circ}1^{\prime}$) and below. We might draw a correlation such as "Y=ax-b" in terms of the length and cross-area of the eroded valley. 5. Sites of char-coal pits were found in the upper part of the desert-like Mt. Chunbo and a professional opinion shows that the mountain was once covered by the oak three species. Furthermore, we found that the soil of both mountains have been kept the same soil system according to a research of the soil cross-area. In other words, we can draw out the fact that, originally, the forest type and soil type of both Mt. Chunbo (378m) and Mt. Jookyup (610m) have been and are the same. However, Mt. Chunbo has been much more devastated than Mt. Jookyup, and carried away its soil nutrition to the extent that the ratios of N. $P_2O_5K_2O$ and Humus C.E.C between these two mountains are 1:10;1:5 respectively. 6. Mt. Chunbo has been mostly eroded for the past 30 years, and it consists of gravels of 2mm or larger size in the upper part of the mountain, while in the lower foot part, the sandy loam was formulated due to the fact that the gluey soil has been carried and accumulated. On the hand, Mt. Jookyup has consitantly kept the all the same forest type and sandy loam of brown colour both in the upper and lower parts. 7. As for the capability of absorbing and saturating maximum humidity by the surface soil, the ratios of wet soil to dry soil are 42.8% in the hill side and lower part of the eroded Mt. Chunbo and 28.5% in the upper part. On the contrary, Mt. Jookyup on which the forest type has not been changed, shows that the ratio in 77.4% in the hill-side and 68.2% in the upper part, approximately twice as much humidity as Mt. Chunbo. This proves the fact that the forest lands with dense forest covers are much more capable of maintaining water by wood, vegitation, and an organic material. The strength of dreventing from carring away surface soil is great due to the vigorous network of the root systems. 8. As mentioned above, the devastated forest land cause not only much greater devastation, but also human loss and property damage. We must bear in mind that the eroded forest land has taken the valuable soil, which is the very existance of origin of both human being and all creatures. As for the prescription for preventing erosion of forest land, the trees for furtilization has to be planted in the hill,side with at least reasonable amount of aertilizer, in order to restore the strength of earth soil, while in the lower part, thorough erosion control and reforestation, and establishments along the riversides have to be made, so as to restore the forest type.

  • PDF

An Analytical Study of the Problems Involved in the Project to Rehabilitate the Illegal Field Burning Cultivators in Gangweon Do (강원도(江原道) 화전정리사업(火田整理事業)에 수반(隨伴)되는 문제점분석(問題點分析)에 관(關)한 연구(硏究))

  • Ho, Ul Yung
    • Journal of Korean Society of Forest Science
    • /
    • v.28 no.1
    • /
    • pp.50-66
    • /
    • 1975
  • Since it is an undeniable fact that the so-called illegal field-burning cultivation is directly implicated in the causes of forest devastation, land erosion, and drought and flood, thus, barring the nation from a well-balanced economic growth, the policy to exterminate its practices must have the topmost priority. Eighty percent of Gangweon-do is mountain forests and naturally of all others this province has the largest area of illegally burned hill-side farminglands, stubbornly retarding the provincial development policy as well as directly causing tremendous forest damages. In 1965 a 7-year plan mapped out to rehabilitate these gypsy type field burning farmers only to be suspended in 1968 to give way to the mandatory project of clearing the isolated farmsteads set in deep mountain to circumvent the guerilla forces signaled by the so-called Samcheok-Uljin area infiltration. In the meantime, new hordes of roving farmers burned the forests, working a renewed havoc. To cope with this situation, the provincial government, taking the year 1973 as a planning year, launched another three year project (1974-76) and has been enforcing the rehabilitation project mobilizing the whole administrative power. Whether or not this project will succeed solely depends upon whether the forcedly rehabilitated roving farmers can really establish self-supporting homesteads. Among the various difficulties facing the newly established homesteaders are: (1) First of all, the homesteaders must be given money-earning jobs. (2) Financial supports or subsidies must be provided them with which to establish self-supporting homesteads. (3) Private enterprises as well as public organizations must offer them jobs with priority. (4) The rehabilitated rovers themselves must establish self-supporting homesteads before expecting the external assistance. (5) The rehabilitated rovers themselves must have the spirit of self-help, welcoming all levels and all kinds of jobs. (6) The rural revitalization movement must expand the self-help reconstruction projects to give them the opportunity to work. (7) All citizen in the province must receive and protect them with brethren love. (8) The evacuated burned-forests must be reforestrated with the principle of "best trees to the best lands". (9) The seedlings of species that the forest owners select must anyhow be secured and supplied (10) The organization and function of the village forestry association must be strengthened to take effective care of the reforestated burned-forests.

  • PDF

Agroclimatic Zone and Characters of the Area Subject to Climatic Disaster in Korea (농업 기후 지대 구분과 기상 재해 특성)

  • 최돈향;윤성호
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.34 no.s02
    • /
    • pp.13-33
    • /
    • 1989
  • Agroclimate should be analyzed and evaluated accurately to make better use of available chimatic resources for the establishment of optimum cropping systems. Introducing of appropriate cultivars and their cultivation techniques into classified agroclimatic zone could contribute to the stability and costs of crop production. To classify the agroclimatic zones, such climatic factors as temperature, precipitation, sunshine, humidity and wind were considered as major influencing factors on the crop growth and yield. For the classification of rice agroclimatic zones, precipitation and drought index during transplanting time, the first occurrence of effective growth temperature (above 15$^{\circ}C$) and its duration, the probability of low temperature occurrence, variation in temperature and sunshine hours, and climatic productivity index were used in the analysis. The agroclimatic zones for rice crop were classified into 19 zones as follows; (1) Taebaek Alpine Zone, (2) Taebaek Semi-Alpine Zone, (3) Sobaek Mountainous Zone, (4) Noryeong Sobaek Mountainous Zone, (5) Yeongnam Inland Mountainous Zone, (6) Northern Central Inland Zone, (7) Central Inland Zone, (8) Western Soebaek Inland Zone, (9) Noryeong Eastern and Western Inland Zone, (10) Honam Inland Zone, (ll) Yeongnam Basin Zone, (12) Yeongnam Inland Zone, (13) Western Central Plain Zone, (14) Southern Charyeong Plain Zone, (15) South Western Coastal Zone, (16) Southern Coastal Zone, (17) Northern Eastern Coastal Zone, (18) Central Eastern Coastal Zone, and (19) South Eastern Coastal Zone. The classification of agroclimatic zones for cropping systems was based on the rice agroclimatic zones considering zonal climatic factors for both summer and winter crops and traditional cropping systems. The agroclimatic zones were identified for cropping systems as follows: (I) Alpine Zone, (II) Mountainous Zone, (III) Central Northern Inland Zone, (IV) Central Northern West Coastal Zone, (V) Cental Southern West Coastal Zone, (VI) Gyeongbuk Inland Zone, (VII) Southern Inland Zone, (VIII) Southern Coastal Zone, and (IX) Eastern Coastal Zone. The agroclimatic zonal characteristics of climatic disasters under rice cultivation were identified: as frequent drought zones of (11) Yeongnam Basin Zone, (17) North Eastern Coastal Zone with the frequency of low temperature occurrence below 13$^{\circ}C$ at root setting stage above 9.1%, and (2) Taebaek Semi-Alpine Zone with cold injury during reproductive stages, as the thphoon and intensive precipitation zones of (10) Hanam Inland Zone, (15) Southern West Coastal Zone, (16) Southern Coastal Zone with more than 4 times of damage in a year and with typhoon path and heavy precipitation intensity concerned. Especially the three east coastal zones, (17), (18), and (19), were subjected to wind and flood damages 2 to 3 times a year as well as subjected to drought and cold temperature injury.

  • PDF

Regional Development And Dam Construction in Korea (한국의 지역개발과 댐건설)

  • 안경모
    • Water for future
    • /
    • v.9 no.1
    • /
    • pp.38-42
    • /
    • 1976
  • Because of differences in thoughts and ideology, our country, Korea has been deprived of national unity for some thirty years of time and tide. To achieve peaceful unification, the cultivation of national strength is of paramount importance. This national strength is also essential if Korea is to take rightful place in the international societies and to have the confidence of these societies. However, national strength can never be achieved in a short time. The fundamental elements in economic development that are directly conducive to the cultivation of national strength can be said to lie in -a stable political system, -exertion of powerful leadership, -cultivation of a spirit of diligence, self-help and cooperation, -modernization of human brain power, and -establishment of a scientific and well planned economic policy and strong enforcement of this policy. Our country, Korea, has attained brilliant economic development in the past 15 years under the strong leadership of president Park Chung Hee. However, there are still many problems to be solved. A few of them are: -housing and home problems, -increasing demand for employment, -increasing demand for staple food and -the need to improve international balance of payment. Solution of the above mentioned problems requires step by step scientific development of each sector and region of our contry. As a spearhead project in regional development, the Saemaul Campaign or new village movement can be cited. The campaign is now spreading throughout the country like a grass fire. However, such campaigns need considerable encouragement and support and the means for the desired development must be provided if the regional and sectoral development program is to sucdceed. The construction of large multipurpose dams in major river basin plays significant role in all aspects of national, regional and sectoral development. It ensures that the water resource, for which there is no substitute, is retained and utilized for irrigation of agricultural areas, production of power for industry, provision of water for domestic and industrial uses and control of river water. Water is the very essence of life and we must conserve and utilize what we have for the betterment of our peoples and their heir. The regional and social impact of construction of a large dam is enormous. It is intended to, and does, dras tically improve the "without-project" socio-economic conditions. A good example of this is the Soyanggang multipurpose dam. This project will significantly contribute to our national strength by utilizing the stored water for the benefit of human life and relief of flood and drought damages. Annual average precipitation in Korea is 1160mm, a comparatively abundant amount. The catchment areas of the Han River, Keum River, and Youngsan River are $62,755\textrm{km}^2$, accounting for 64% of the national total. Approximately 62% of the national population inhabits in this area, and 67% of the national gross product comes from the area. The annual population growth rate of the country is currently estimated at 1.7%, and every year the population growth in urban area increases at a rising rate. The population of Seoul, Pusan, and Taegu, the three major cities in Korea, is equal to one third of our national total. According to the census conducted on October 1, 1975, the population in the urban areas has increased by 384,000, whereas that in rural areas has decreased by 59,000,000 in the past five years. The composition of population between urban and rural areas varied from 41%~59% in 1959 to 48%~52% in 1975. To mitigate this treand towards concentration of population in urban areas, employment opportunities must be provided in regional and rural areas. However, heavy and chemical industries, which mitigate production and employment problems at the same time, must have abundant water and energy. Also increase in staple food production cannot be attained without water. At this point in time, when water demand is rapidly growing, it is essential for the country to provide as much a reservoir capacity as possible to capture the monsoon rainfall, which concentarated in the rainy seaon from June to Septesmber, and conserve the water for year round use. The floods, which at one time we called "the devil" have now become a source of immense benefit to Korea. Let me explain the topographic condition in Korea. In northern and eastern areas we have high mountains and rugged country. Our rivers originate in these mountains and flow in a general southerly or westerly direction throught ancient plains. These plains were formed by progressive deposition of sediments from the mountains and provide our country with large areas of fertile land, emminently suited to settlement and irrigated agricultural development. It is, therefore, quite natural that these areas should become the polar point for our regional development program. Hower, we are fortunate in that we have an additional area or areas, which can be used for agricultural production and settlement of our peoples, particularly those peoples who may be displaced by the formation of our reservoirs. I am speaking of the tidelands along the western and southern coasts. The other day the Ministry of Agriculture and Fishery informed the public of a tideland reclamation of which 400,000 hectares will be used for growing rice as part of our national food self-sufficiency programme. Now, again, we arrive at the need for water, as without it we cannot realize this ambitious programme. And again we need those dams to provide it. As I mentioned before, dams not only provide us with essential water for agriculture, domestic and industrial use, but provide us with electrical energy, as it is generally extremely economical to use the water being release for the former purposes to drive turbines and generators. At the present time we have 13 hydro-electric power plants with an installed capacity of 711,000 kilowatts equal to 16% of our national total. There are about 110 potential dams ites in the country, which could yield about 2,300,000 kilowatts of hydro-electric power. There are about 54 sites suitable for pumped storage which could produce a further 38,600,000 kilowatts of power. All available if we carefully develop our water resources. To summarize, water resource development is essential to the regional development program and the welfare of our people, it must proceed hand-in-hand with other aspects of regional development such as land impovement, high way extension, development of our forests, erosion control, and develop ment of heavy and chemical industries. Through the successful implementation of such an integrated regional development program, we can look forward to a period of national strength, and due recognition of our country by the worlds societies.

  • PDF