• Title/Summary/Keyword: Flood Volume

Search Result 221, Processing Time 0.028 seconds

A Study on the Development of a Dam Operation Table Using the Rainfall Matrix (강우 매트릭스를 활용한 댐 운영 조견표 개발에 관한 연구)

  • Jeong, Changsam
    • Journal of Korean Society of Disaster and Security
    • /
    • v.13 no.2
    • /
    • pp.39-51
    • /
    • 2020
  • Recently, flood damage has been increasing in Korea due to frequent local torrential rains caused by abnormal weather conditions. According to the calculation of the recurrence period of torrential rain that occurred in North Chungcheong Province on July 16, 2017, it was estimated that the rainfall frequency in the upper are of Goessan Dam was around 1,524 years, and the highest level of Goesan Dam rose to EL.137.60 meters, leaving only 5 cm of margin until the height of the dam floor (EL.137.65 meters). The Goesan Dam, which operated for 62 years since 1957, needs to be prepared to cope with the increase of floodgate volume in the basin, the development of a single purpose dam for power generation only, and there are no measurement facilities for flood control, so efficient operation methods are needed to secure the safety of residents in upper and lower regions. In this study, a method of dam operation was proposed by constructing a rain matrix for quick decision making in flood prediction, calculating the highest level of dam for each condition in advance, and preparing a survey table, and quickly finding the level corresponding to the conditions in case of a situation.

Utilization of Peace Dam for Conservation Purpose (이수측면에서 평화의댐 활용방안 연구)

  • Yi, Jae-Eung;Lim, Dong-Sun;Lee, Jong-Tae
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.8
    • /
    • pp.653-662
    • /
    • 2004
  • In this study, the method of Increasing the flood control as well as conservation effects is studied by joint operation of Hwacheon and Peace Dam. After completing the second phase of the construction of the Peace Dam, the dam crest height will be increased from 225m and the storage capacity will also be increased. If storage capacity is increased and gates are installed, it will assist not only flood control but also conservation of the entire Han river basin. Considering the change of conservation levels, the change of the restricted water level of the Hwacheon Dam in flood season, and the inflow change into the Peace Dam through the simulated reservoir operation, the annual average power of Hwacheon Dam with 95% reliability, annual firm power, the volume of water supply is calculated. As a result, when the conservation level of the Peace Dam and the restricted water level of the Hwacheon Dam are increased, the generation capacity will be improved. However, even though the inflow decrease, the generation capacity will not be affected. If the inflow decrease under the same conditions, the water supply capability will be reduced to the range from 35% to 40%. It is necessary to increase conservation level to keep the same water supply capability.

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

A Development of Simplified Design Method of the Detention Pond for the Reduction of Runoff (우수유출저감용 저류지의 간편설계기법 개발)

  • Lee, Jae-Joon;Kwak, Chang-Jae
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.7
    • /
    • pp.693-700
    • /
    • 2008
  • Detention pond has an important role in peak flow reduction to mitigate flood damage. Design of detention pond is accomplished through the preliminary stage, and design stage in general. New development projects produce increased peak flow and flow amounts. In this case it is necessary to design the detention pond easily and simply. A simplified design method of the detention pond is suggested in this study. Used design variables are peak flow ratio(${\alpha}$) and storage ratio($S_r$). ${\alpha}$ is the peak flow ratio of before and after development of the basin. $S_r$ is a ratio of storage volume to total runoff volume. Applicability of the proposed method was also proved. The simple procedure of detention pond design is proposed in this study.

Prediction MOdels for Channel Bed Evolution Due to Short Term Floods (단기간의 홍수에 의한 하상변동의 예측모형)

  • Pyo, Yeong-Pyeong;Sin, Cheol-Sik;Bae, Yeol-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.6
    • /
    • pp.597-610
    • /
    • 1997
  • One-dimensional numerical models using finite difference methods for unsteady sediment transport on alluvial river channel are developed. The Preissmann implicit scheme and the Lax-Wendroff two-step explicit scheme with the Method of Characteristics for water motion and a forward time centered space explicit scheme for sediment motion are developed to simulate the sediment transport rate and the variation of channel bed level. The program correctness of each model is successfully verified using volume conservation tests. The sensitivity studies show that higher peak stage level, steeper channel slope and longer flooding duration produce more channel bed erosion. and median grain size, $D_{50}=0.4mm$ give maximum volume loss in this study. Finally, the numerical models are found to produce reasonable results from the various sensitivity tests which reveal that the numerical models have properly responded to the changes of each model parameter.

  • PDF

Runoff Characteristics Change of a Basin under Urbanization (도시화 진행에 따른 유역 유출특성 변화에 관한 연구)

  • Son, Kwang-Ik;Kim, Min-Chol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.4
    • /
    • pp.89-93
    • /
    • 2010
  • It is well known that the drastic change of hydrological characteristics of an urbanized basin causes severe runoff, sediment yield, and peak flow. High vulnerability of urban flood disasters is caused by land-use change and development of a basin. A typical site suffering urbanization was selected and the experimental site has being operated last three years. Hydrological and hydraulic characteristics of the urbanizing basin were examined by observation of runoff, sediment loads and precipitation with T/M. The effects of land-use change were analyzed by examination of the hydrological characteristics, such as run-off ratio (runoff volume/rainfall volume), sediment yields. Runoff coefficient of rational equation was increased as basin was urbanized. Suspended sediment yields due to a urban development activities were raised almost 10 times compare to undisturbed condition for small runoff less than 1 cms. Meanwhile, no big change could be detected for bed loads.

An Experimental Study on the Application Method of Infiltration Trench (침투트렌치 적용방안에 관한 실험적 연구)

  • Jung, Do-Joon;Ahn, Seung-Sub;Kim, Yun-Tae
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.10 no.6
    • /
    • pp.147-154
    • /
    • 2010
  • In this study, flood control effects for infiltration trench which is one of runoff reduction facilities were analyzed based on hydraulic experiments. Hydraulic experiments were conducted using 25 cm diameter circular pipe, and water depths for boundary conditions are 5, 10, 15, 20, 25 cm. Infiltration volume, runoff volume, runoff initiation time, final infiltration capacity and final infiltration capacity reached time etc. were measured from infiltration trench hydraulic experiment. We assumed that drainage area of each infiltration trench is $130\;m^2$ ($6.5\;m{\times}20\;m$) and calculated CN with area based on those experimental characteristics. In AMC-I condition, the calculated CN with five water depths is 84 for 2% pipe slope, 83 for 5% pipe slope. In AMC-III condition, the calculated CN is 84 for 2% and 5% pipe slope.

Impacts of Surface Roughness Integration Using Remote Sensing Data: Concentration of Flood Flow Variation (원격탐사자료를 활용한 지표면 조도계수 통합의 영향: 홍수유출 변화를 중심으로)

  • Kang, Shin-Uk;Rieu, Seung-Yup;Lee, Kil-Ha;Hwang, Man-Ha
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.2 s.40
    • /
    • pp.33-42
    • /
    • 2007
  • A physical-based aggregation method was suggested to estimate surface roughness, which adequately represents the spatial heterogeneity of vegetation factors, from land cover property obtained from the remote sensing data. For the sensitivity analysis of surface roughness, the peak flow, peak time, and total volume were simulated by the NWS-PC. Effects of surface roughness estimated by three different integration methods (predominant, arithmetic mean, and aggregation approach) on the conceptual rainfall-runoff model parameters was analyzed. In the preliminary sensitivity test to surface roughness, the peak time had 10% variation and total volume had 2% variation. The peak time increased with surface roughness. A physical-based aggregation method was better than the existing method in the Soyanggang Dam basin for the results of STDEV, RMSE, NSE, and PME, but difference between them were small. The parameters related on the total baseflow were changed significantly with change of the surface roughness.

  • PDF

A Review on the Management of Water Resources Information based on Big Data and Cloud Computing (빅 데이터와 클라우드 컴퓨팅 기반의 수자원 정보 관리 방안에 관한 검토)

  • Kim, Yonsoo;Kang, Narae;Jung, Jaewon;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.18 no.1
    • /
    • pp.100-112
    • /
    • 2016
  • In recent, the direction of water resources policy is changing from the typical plan for water use and flood control to the sustainable water resources management to improve the quality of life. This change makes the information related to water resources such as data collection, management, and supply is becoming an important concern for decision making of water resources policy. We had analyzed the structured data according to the purpose of providing information on water resources. However, the recent trend is big data and cloud computing which can create new values by linking unstructured data with structured data. Therefore, the trend for the management of water resources information is also changing. According to the paradigm change of information management, this study tried to suggest an application of big data and cloud computing in water resources field for efficient management and use of water. We examined the current state and direction of policy related to water resources information in Korea and an other country. Then we connected volume, velocity and variety which are the three basic components of big data with veracity and value which are additionally mentioned recently. And we discussed the rapid and flexible countermeasures about changes of consumer and increasing big data related to water resources via cloud computing. In the future, the management of water resources information should go to the direction which can enhance the value(Value) of water resources information by big data and cloud computing based on the amount of data(Volume), the speed of data processing(Velocity), the number of types of data(Variety). Also it should enhance the value(Value) of water resources information by the fusion of water and other areas and by the production of accurate information(Veracity) required for water management and prevention of disaster and for protection of life and property.

Calculation of surface image velocity fields by analyzing spatio-temporal volumes with the fast Fourier transform (고속푸리에변환을 이용한 시공간 체적 표면유속 산정 기법 개발)

  • Yu, Kwonkyu;Liu, Binghao
    • Journal of Korea Water Resources Association
    • /
    • v.54 no.11
    • /
    • pp.933-942
    • /
    • 2021
  • The surface image velocimetry was developed to measure river flow velocity safely and effectively in flood season. There are a couple of methods in the surface image velocimetry. Among them the spatio-temporal image velocimetry is in the spotlight, since it can estimate mean velocity for a period of time. For the spatio-temporal image velocimetry analyzes a series of images all at once, it can reduce analyzing time so much. It, however, has a little drawback to find out the main flow direction. If the direction of spatio-temporal image does not coincide to the main flow direction, it may cause singnificant error in velocity. The present study aims to propose a new method to find out the main flow direction by using a fast Fourier transform(FFT) to a spatio-temporal (image) volume, which were constructed by accumulating the river surface images along the time direction. The method consists of two steps; the first step for finding main flow direction in space image and the second step for calculating the velocity magnitude in main flow direction in spatio-temporal image. In the first step a time-accumulated image was made from the spatio-temporal volume along the time direction. We analyzed this time-accumulated image by using FFT and figured out the main flow direction from the transformed image. Then a spatio-temporal image in main flow direction was extracted from the spatio-temporal volume. Once again, the spatio-temporal image was analyzed by FFT and velocity magnitudes were calculated from the transformed image. The proposed method was applied to a series of artificial images for error analysis. It was shown that the proposed method could analyze two-dimensional flow field with fairly good accuracy.