• Title/Summary/Keyword: Fire wall

Search Result 356, Processing Time 0.025 seconds

The Effect of the Combined Operation of Sprinkler and Vent Systems on the Smoke Control in a Horizontal Corridor (스프링클러와 배연설비의 통합작동이 수평통로의 연기제어에 미치는 영향)

  • Jeon Heung-Kyun;Choi Young-Sang;Choo Hong-Lok;Jang Jun-Young
    • Fire Science and Engineering
    • /
    • v.19 no.1 s.57
    • /
    • pp.70-89
    • /
    • 2005
  • Fire scenarios in a space $20.0m\;\times\;4.0m$ floor and 3.0m high were simulated by using computational fluid dynamics program (FDS 4.0.3) to investigate the effect of the combined operation of both sprinkler and vent systems, which are installed for cooling and blocking smoke which propagates beneath the ceiling of a horizontal corridor, on the temperature and smoke density of it. It was shown that the combined operation both sprinkler and vent systems was more effective than each operation for cooling and blocking smoke, the number of operating sprinklers was two because of corner effect of wall, and over-installed sprinklers deteriorated the effect of cooling and blocking smoke. This study showed that the case of two sprinklers and vent flow rate $3.0m^3/s$ in fire scenario was the most effective for cooling and blocking smoke. It was confirmed that the smoke downdrag occurs in operating sprinkler system, and the more smoke droplets produced by increasing fire size, the greater smoke downdrag occurred.

The Effect of Photoluminescent Exit Signs in Evacuation in the Event of Failure of the Power from the Building Fire (건물화재의 정전시 축광유도표지가 피난에 미치는 영향)

  • Hur Man-Sung
    • Fire Science and Engineering
    • /
    • v.19 no.4 s.60
    • /
    • pp.69-74
    • /
    • 2005
  • This study is intended to examine the effect of photoluminescent exit signs in the event of failure of both the power to the lighting and illuminated exit sign. To achieve the purpose, the test house was exhibited in Fire EXPO '05. 520 visitors were examined from May 26-29, 2005. The results of this study are as follows; The evacuation from buildings in dark conditions showed that $70\%$ of men and $72\%$ of women were crawled along the wall. Meanwhile, $88\%$ of men and $83\%$ of women were evacuated with ordinary walking in photoluminescent exit signs. The egress time was shortened from 53 seconds to 64 seconds in accordance with age, height and visual power. The photoluminescent exit signs located on public buildings floors will aid in evacuation from buildings in the event of failure of the power to the lightings and illuminated exit signs.

A Study on the Safety Assessment of Water-based Firefighting Training Center using Fire Dynamics Simulation (FDS를 활용한 수소화 훈련장 안전성 평가에 관한 연구)

  • Doyoeng Park;Junho Kim
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.30 no.4
    • /
    • pp.317-323
    • /
    • 2024
  • According to the section A-VI/3 of the International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (STCW), Water-based firefighting training center is mandatory to obtain onboard certificates. This space, being similar to fire situations on ships requires that safety measures be quantified to ensure occupant safety and establish operational standards. For fire safety evaluation, cases were designed based on the presence or absence of smoke control equipment using Pyrosim based on Fire Dynamics Simulation (FDS). Vector analysis was performed to evaluate flow of smoke and heat. Available safe escape time / required safe escpae time (ASET/RSET) analysis was conducted to evaluate safety by comparing the interpreted numerical results through Pathfinder. During safety evaluation of the current operational condition, the appropriateness of the function of each smoke control equipment was numerically and visually indicated. The emergency situation with dust collector stopped was expressed by each evacuation time and safety margin of 111.2 seconds, suggesting that be used as a standard of evacuation time.

Development of Video Work Manual for Rock-Drill Data In Fire Service (소방에서의 도상훈련 기초자료 영상화작업 매뉴얼 개발)

  • Cho, Jae-Kwan;Park, Hee-Jin;Hwang, Inn;Kwon, Hayrran
    • The Korean Journal of Emergency Medical Services
    • /
    • v.6 no.1
    • /
    • pp.103-128
    • /
    • 2002
  • As a result of trying the various manufacturing methods considering the reality of manpower and equipments with this manual, the following standardized procedures and contents can be suggested. (1) Since tools presenting Rock-Drill data must formalize the order of explanation although explainers are different, it will be valid that it is configured by existing power point method rather than by web document type. Composition of contents are selected on the basis of defence card and survey and then 8 items including initial screen, peripheral conditions, mobilization route, general conditions, use and structure by floor, department of vehicle consideration in activities and end screen are included. (2) Making methods and cautions of data included and used in power point are as follows ; - It was most effective that objects of fire fighting and location of neighboring fire fighting water were expressed by electronic map and drawing of inner building was made by scanning it after paining general architecture drawing(plan by each floor) rather than using drawing tools of EXCEL program or CAD drawing. And it was helpful to simplify contents of architecture drawing to wall, stairs and gate in understanding them. - Photographing of video data should be taken to show available fire fighting facilities in fire, use of planned space and the whole inner structure of each floor from the inside of fire fighting buildings and to display play time between 10 sec. and 1 min, for obstacles to distance from adjacent buildings or passage of special vehicles and fire fighting water from the outside of the building. - File format of video data taken in this way is most suitable to use wmv(window media video) or asf(advanced streaming format) type in consideration of time required for export, screen quality, file capacity and play type in Rock-Drill through network. - Still screen(photo) is more effective to express the department of fire fighting vehicles or other equipments than using video. (3) In configuration work of power point, hyper link was used most and configured to see any part at any situation like web document and then uniformity of presentation order of power point was complemented. (4) In case of sales facilities with the area of $35.557m^2$, the time of 22 hours and 30 minutes for five days was taken with five persons. Therefore, when eight-hour works a day were calculated, the whole process of video work for Rock-Drill can be finished with three day works.

  • PDF

Study of Smoke Behavior and Differential Pressure in the Refuge Safety Area According to Damper Capacity of Smoke Control (제연댐퍼 송풍량에 따른 피난 안전 구역 차압 및 연기 거동 특성 연구)

  • Lee, Jae-Bin;Moon, Joo-Hyun;Lee, Seong-Hyuk;Ryou, Hong-Sun
    • Fire Science and Engineering
    • /
    • v.25 no.4
    • /
    • pp.103-109
    • /
    • 2011
  • In this study, we calculated the smoke movement at the fire area of the refuge floor which has the refuge safety area in case of fire in the high rise building by using a computational fluid dynamics (CFD) code of FLUENT (ver. 13.0). The buoyancy plume was applied using the temperature and flow velocity which represent 10 MW heat release rate in order to describe the fire, and the smoke movement was predicted using a species conservation equation. The pressurization system of smoke control was adopted with smoke control damper in refuge safety area, at the result, it is confirmed that the damper capacity was enough to smoke control in which the flow rate of supply was applied 25 $m^3/s$ in the case of the door at fire area opened only, and 50 $m^3/s$ in the doors at the fire area and lobby both opened case. They were satisfied in NFSC 501-A. Even though the door of fire area closed, there were smoke leakages at the gap between the door and wall. In addition, the refugee could be isolated in the fire area when the door of fire area closed during smoke control in the case of using the high damper flow rate of supply, 50 $m^3/s$. Therefore the proper damper flow rate of supply are needed in order to prevent the damage of refugee and this study proposes the suitable condition of damper capacity according to refuge scenario.

Fire Alarm Sound Transmission in Apartment Units (공동주택에서의 화재경보음 전달)

  • Jeong, Jeong-Ho
    • Fire Science and Engineering
    • /
    • v.32 no.3
    • /
    • pp.67-75
    • /
    • 2018
  • To reduce the number of casualties in the case of fire, an alarm sound needs to be delivered to the people who remain in the apartment unit. On the other hand, it was reported that the fire alarm sound generated in the elevator hall was not delivered sufficiently to the people staying in the apartment units. In this study, the background noise level and noise level generated in an apartment unit were measured during the day and night time. In addition, the transmission of the fire alarm sound into the each room of apartment units was simulated and compared with the background noise level. The fire alarm sound generated in the elevator halls was reduced by the fire door and doors, and was not transmitted sufficiently into the internal spaces of the apartment units. Starting evacuation action was difficult after hearing the fire alarm sound generated outside the apartment units. To improve the transmission of an alarm sound to the inner spaces of apartment units, an acoustic simulation was carried out for cases where the alarm sound generator was installed on a wall-pad in the living room and the alarm sound generator was installed on the ceiling of each rooms in apartment units. Background noise of + 15 dB and 75 dB (A) were satisfied when alarm sound generator was installed on the ceiling of each room.

TURBULENT FLOW CHARACTERISTICS OF CHANNEL FLOW USING LARGE EDDY SIMULATION WITH WALL-FUNCTION(FDS CODE) (벽 함수가 적용된 대와류 모사(FDS 코드)의 채널에서의 난류 유동 특성)

  • Jang, Yong-Jun;Ryu, Ji-Min;Ko, Han Seo;Park, Sung-Huk;Koo, Dong-Hoe
    • Journal of computational fluids engineering
    • /
    • v.20 no.3
    • /
    • pp.94-103
    • /
    • 2015
  • The turbulent flow characteristics in the channel flow are investigated using large eddy simulation(LES) of FDS code, built in NIST(USA), in which the near-wall flow is solved by Werner-Wengle wall function. The periodic flow condition is applied in streamwise direction to get the fully developed turbulent flow and symmetric condition is applied in lateral direction. The height of the channel is H=1m, and the length of the channel is 6H, and the lateral length is H. The total grid is $32{\times}32{\times}32$ and $y^+$ is kept above 11 to fulfill the near-wall flow requirement. The Smagorinsky model is used to solve the sub-grid scale stress. Smagorinsky constant $C_s$ is 0.2(default in FDS). Three cases of Reynolds number(10,700, 26,000, 49,000.), based on the channel height, are analyzed. The simulated results are compared with direct numerical simulation(DNS) and particle image velocimetry(PIV) experimental data. The linear low-Re eddy viscosity model of Launder & Sharma and non-linear low-Re eddy viscosity model of Abe-Jang-Leschziner are utilized to compare the results with LES of FDS. Reynolds normal stresses, Reynolds shear stresses, turbulent kinetic energys and mean velocity flows are well compared with DNS and PIV data.

Wavelet Analysis of Elastic Wave for Wall Thinned High-Pressure Service Pipes (감육을 가지는 고압배관에 대한 탄성파의 Wavelet해석)

  • Kim, Jin-Wook;Ahn, Seok-Hwan;Lee, Si-Yoon;Nam, Ki-Woo;Do, Jae-Yoon
    • Journal of the Korean Institute of Gas
    • /
    • v.9 no.3 s.28
    • /
    • pp.1-8
    • /
    • 2005
  • We studied on the nondestructive evaluation of the elastic wave signals of locally wall thinned straight pipe. Wavelet transform was applied for the time-frequency analysis of waveforms obtained by fracture wave detector due to the dropping steel ball. The time-frequency analysis provides time variation of each frequency component involved in a waveform, which makes it possible to evaluate the shape of local wall thinning at each frequency. In this study, comparison by wavelet transform of the AE signals and monotonic bending tests without internal pressure are conducted on 1.91 inch diameter full-scale carbon steel pipe specimens. As the results of tests, fracture behaviors could be shown by the characteristic of mechanical strength of locally wall thinned pipes and the waveforms could be evaluated for the integrity insurance of the piping system according to the length and depth range of the deffeted shape pipes in the real field.

  • PDF

Development of Waterproof Electric Outlet using Silicon Packing Technology (실리콘 패킹 기술을 이용한 방수 콘센트의 개발)

  • Choi, Chung-Seog;Kim, Chang-Soung
    • Proceedings of the KIEE Conference
    • /
    • 2008.04b
    • /
    • pp.85-87
    • /
    • 2008
  • In this paper, we manufactured waterproof outlet that use silicon packing know-how. Developed outlet is waterproof packing on pins of the plug insertion hole and electric wire insertion hole. Therefore, outlet body internal furnace water can prevent that is flowed in. Temperature anomaly can use in back large outer wall, restaurant exposed easily to moisture, bathroom, laundry, a laboratory and science room, auditorium, etc. That is estimate that contribute on courtesy call of electricity calamity.

  • PDF

Design Considerations for Concrete High-Rise Buildings

  • Chung, Kwangryang;Park, Chulho;Kim, Dohun
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.3
    • /
    • pp.187-193
    • /
    • 2016
  • Busan's Haeundae Resort project, which is currently being constructed by POSCO E&C, comprises the 101-story Landmark Tower and two 85-story residential towers. Presently, foundation and basement construction is complete, with a final completion date set for 2019. Considerations about the construction and design of the three reinforced concrete high-rise buildings will be discussed in this paper.