• Title/Summary/Keyword: Fire facility

Search Result 449, Processing Time 0.022 seconds

A Study on the Evaluation of Evacuation Safety Function of an Elderly Care Hospital (일개 노인요양병원의 피난안전성능 평가에 관한 연구)

  • Kim, Jong-Bum;Kim, Ja-Ok;Back, Eun-Sun
    • Fire Science and Engineering
    • /
    • v.24 no.3
    • /
    • pp.9-19
    • /
    • 2010
  • Recently, Korea is constantly increasing its elderly care hospitals, and requires establishment of general evacuation plan considering old people's behavioral characteristics and physical states in emergency situations such as fire, and etc. In addition, because most of the facility users are patients under serious dementia and stroke, they feel difficulty evacuating by themselves, with differing evacuation time according to each walking status (bed, wheel chair, and various supplementary instruments), which is why it makes it difficult to have them all evacuate. This paper, in order to suggest data reference for designing on the basis of functionality, used various collected data utilizing Simulex to measure evacuation time through the model of elderly care hospital, a medical facility. During the study, several problems were found.

A Construction of the N-BMS Focused on the Building Service Equipment (N-BMS : National Building Management System) (건물 군관리시스템 구축방안)

  • Lee, Tae-Won;Kim, Yong-Ki;Kang, Sung-Ju
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.149-154
    • /
    • 2007
  • Now, in Korea, the performances of the building service equipment relay on the individual superintendent's share for the assessment of performance, fault detection, deterioration diagnosis of the building service equipment. As the result, very different quality of the performance or the durability of equipment is being obtained with his skill and effort and it is also not easy to assess that quality. This finally lead to the waste of labor force and the operating cost due to the high-cost, low-efficiency system. How to construct the N-BMS was considered to save energy, resource and to conserve performance of building service equipment. The FEMIS, facility, energy/environmental management & information system, for building service offer management process integrated with BAS, FMS and EMS and so on.

  • PDF

The Effect of the Performance of Firefighting Construction Supervision Personnel on the Completion Inspection of Firefighting Facility Construction in Apartments (소방공사감리원의 업무수행능력이 아파트 소방시설공사의 완공검사에 미치는 영향)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.43-54
    • /
    • 2019
  • In this study, results of completion inspection are investigated according to the performance of the firefighting construction supervision personnel and according to the necessity of clean air supply in a performance test of the firefighting construction supervision personnel. The results of the completion inspection are measured and the causes of defects in the fire protection facilities after issuance of a completion inspection certificate are analyzed. The findings of this investigation can be used to minimize the risk of apartment fires and improve the performance of firefighting construction supervision personnel. The results of this study are summarized as follows. First, the results of the completion inspection conducted by the firefighting construction supervision personnel varies according to particular occupation. The performance of fire facility supervisors from design companies and fire construction companies were significantly higher than the fire officers. Therefore, it is necessary to employ supervisors who have experience in supervising the construction of apartments, in order to improve the performance of fire construction supervision officers. Second, the analysis of the completion inspection results according to the necessity of a clean air supply for performance tests of firefighting construction supervision personnel showed that the necessity of a clean air supply was significantly higher for fire facility supervisors from design companies and fire construction companies than for the fire officers. In order to improve, the completion inspection should be carried out up until the completion date of the building. In addition, a system needs to be established to ensure that clients are not able to demand that a completion inspection certificate be issued on the construction completion date. Finally, it is found that defects of completion inspection after issuance of a completion inspection certificate affects the result of the completion inspection. The results of the completion inspections conducted by the fire facility supervisors from design companies and fire construction companies were affected significantly less by defects than that of the general contractors. Research shows that faults have occured in firefighting facilities after the issuance of a completion inspection certificate due to the client and the construction company demanding the issuance of the completion inspection certificate.

Diagnosis for damage of fire hydrant with long valve stem in power plant. (발전소내 긴 밸브 stem을 갖는 옥외 소화전의 파손 현상 규명)

  • Sohn, Seok-Man;Lee, Sang-Guk;Lee, Wook-Ryun;Lee, Jun-Shin;Kim, Ki-Tae
    • Proceedings of the KSME Conference
    • /
    • 2007.05b
    • /
    • pp.3512-3517
    • /
    • 2007
  • Nuclear power plant has many external fire hydrants that have to operate in the state of emergency such as facility fire, forest fire. The valve stem of one among them was broken 3 times for 4 years. It had long valve stem and operated under high water pressure. The elongation and the tensile strength for the broken valve stem was measured to examine the defect of material property. And the vibration level and the natural frequencies was detected to check the resonance. As the result of a diagnosis, the cause of this fault is proven buckling of long valve stem.

  • PDF

The Quantitative Risk Assessment for Railroad-tunnel Fire Incidents by using CFD code (CFD code를 이용한 철도터널 화재 위험도 평가)

  • Kim, H.B.;Lee, D.H.;Jang, Y.J.;Jung, W.S.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.169-172
    • /
    • 2011
  • Recently, railroad long tunnels are increasing and growing longer due to topological feathers like a lot of mountain in Korea. But fire disaster of a long tunnel cause many people to injury and death. For that reason, at the early design stage of a long tunnel, risk assessment and mitigation measure of risk for satisfying tunnel safety are required. According to the railroad facility safety standard (Korean MLTM Announcement No. 2006-395), risk assessment for railroad-tunnel fire should be performed when design stage. Therefore, various methods of risk assessment for tunnel fire have been studied and applied. In the paper, QRA(Quantitative Risk Analysis) for fire risk assessment by using CFD code is presented and the usefulness of CFD is discussed.

  • PDF

A Study on the Friction Loss Reduction in Fire Hoses Used at a Fire Scene (화재현장에서 사용하는 소방호스의 마찰손실 감소 방안에 관한 연구)

  • Min, Se-Hong;Kwon, Yong-Joon
    • Fire Science and Engineering
    • /
    • v.27 no.3
    • /
    • pp.52-59
    • /
    • 2013
  • It was described the measured friction loss depending on pressure used and changes in water flow rates for a fire hose used at a fire scene on this study. As a result of actual measurement based on the result obtained by analyzing the use situation of a fire hose such as the kind, quantity, pressure used, etc. of a fire hose, the friction loss in a fire hose under the condition of using by a fire officer at a fire scene was measured as up to 56.8 %. This is much different from the equivalent length of a fire hose used to calculate the pump head in an indoor and outdoor fire-fighting facility. There is no related restrictive regulation on friction loss, there are even no data on friction loss measured by fire hose makers, and spreading a fire hose without considering friction loss at a fire scene can result in an increased length of hose used and a high-pressure water discharge from a fire engine, so this study aims to establish a standard for an equivalent length to friction loss in a fire hose and to propose a spreading method considering friction loss in a fire hose at a fire scene.

Simulation of Pool Fire with Two Rooms Using FDS Model (화재분석모델을 이용한 이중격실화재 검증분석)

  • Kim, Bong-Hyun;Bae, Yong-Bum;Ryu, Su-Hyun;Lee, Gong-Hee;Kim, Yun-Il;Moon, Chan-Ki;Park, Jong-Seok
    • Proceedings of the SAREK Conference
    • /
    • 2008.06a
    • /
    • pp.1332-1337
    • /
    • 2008
  • Fire model shall be verified and validated to reliably predict the consequences of fires within its limitations. This study aims to predict pool fire with two rooms using FDS and to coompare FDS simulation results with PRISME experimental data which can be applicable to the fire of nuclear power plant facility. Four different sizes of grid (0.08m, 0.1m, 0.125m, 0.2m) are used in the simulation and the simulated results of specific quantities such as temperature, chemical composition, heat flux and heat release rate are compared to the experimental data. From this study, the FDS simulation results with the finer grid resolution show better similarity and trend with pool fire experimental data. The sensitivity analysis and the selection of the proper size grid are essential to predict the consequences of pool fire with two rooms reliably.

  • PDF

Fire Endurance Estimate of Reinforced Concrete Structure Using Nonlinear Finite Element Method (비선형 유한요소해석을 이용한 철근콘크리트 구조물의 내화성능평가)

  • Byun, Sun-Joo;Im, Jung-Soon;Hwang, Jee-Wook
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.1 s.20
    • /
    • pp.17-27
    • /
    • 2006
  • To estimate the retained strength of reinforced concrete structure after fire is very difficult because the complex behavior of structure is hard to understand during course of a fire. However, the damages which is caused by fire of the traffic facility infrastructure are enormous. Therefore the security against fire is important element that must not be overlooked. For this reason, an exact estimate method of the fire endurance is highly demanded. In this study, the validity of the nonlinear finite element method approach for the fire endurance of reinforced concrete structure is verified. The results of fire endurance estimate of underground road way by nonlinear finite element method approach are compared with those by ACI 216R-89.

A Study on Evaluation Plan of Fire Safety Performance for Public Building (공동주택의 화재안전성능 평가방안에 관한 연구)

  • Ku, Jae-Hyun
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.4
    • /
    • pp.25-32
    • /
    • 2019
  • From the viewpoint of fire-fighting activities, public building have structural and management problems in fire, so evacuation disturbance and risk of expanding combustion are high. As a result of analyzing various fire fragile factors of public building, The evaluation areas were derived from safety systems, fire-fighting facility, structure safety, general safety and the evaluation factors were presented. Also, the characteristics of domestic and foreign certification systems were analyzed by comparing and analyzing the status of fire safety performance certification system for 6 domestic and overseas apartment houses. In conclusion, the 5 convergence directions of certification system and 22 evaluation items by 4 evaluation fields were derived, and based on this, we have established 3 convergence introduction plans of fire safety performance certification system of public building.