Kim, Seung-Jun;Choi, Jun-Ho;Won, Deok-Hee;Han, Taek-Hee;Kang, Young-Jong
Journal of Korean Society of Steel Construction
/
v.23
no.6
/
pp.747-761
/
2011
This paper presents an investigation on the change in the statical behavior and the ultimate capacity of steel cable-stayed bridges after cable failure. Cable failure can occur due to fire, direct vehicle clash accidents, cable or anchorage fatigue, and so on. Moreover, the cable may be temporarily disconnected during cable replacement work. When cable failure occurs, the load, that was supported by the broken cable is first transferred to another cable. Then the structural state changes due to the interaction between the girder, mast, and cables. Moreover, it can be predicted that the ultimate capacity will decrease after cable failure, because of the loss of the support system. In this study, the analysis method is suggested to find the new equilibrium state after cable failure based on the theory of nonlinear finite element analysis. Moreover, the ultimate analysis method is also suggested to analyze the ultimate behavior of live loads after cable failure. For a more rational analysis, a three-step analysis procedure is suggested and used, which consisted of initial shape analysis, cable failure analysis, and live load analysis. Using this analysis method, an analytical study was performed to investigate the changes in the structural state and ultimate behavior of steel cable-stayed bridges.
Kim, Do-Sik;Kim, Do-Hyung;Kim, Woo-Sung;Lee, Du-Hwa;Lee, Ho-Seok
Tunnel and Underground Space
/
v.16
no.5
s.64
/
pp.357-367
/
2006
Recently, as the construction of new railway and the relocation of existing line increase, tunnel structures grow longer. The railway fire accidents in long tunnel bring large damages of human life and disaster. The interest of safety in long tunnel have a growing and the safety standard of long tunnel is tightening. For that reason, at the planning of long tunnel, the optimum design of safety facility in long tunnel for minimizing the risks and satisfying the safety standard is needed. For the reasonable design of long railway tunnel considering high safety, qualitative estimation for tunnel safety is required. In this study, QRA (Quantitative Risk Assessment) technique is applied to design of long railway tunnel for assuring the safety function and estimating the risk of safety. The case study for safety design in long railway tunnel is tarried out to verifying the QRA technique for two railway tunnels. Thus, the inclined and vertical shaft for escape way and safety facilities in long tunnel are planned, and the risks of tunnel safety for each case are estimated quantitatively.
This study aims to prepare countermeasures to prevent and minimize drowning accident in inland waters by examining the current status of inland water safety management in Korea and diagnosing the defects. The defects in current inland water safety management is analyzed in four aspects. First is the legal defect that includes the absence of legislation that directs the inland water safety management. Second is the instructional defect such as the absence of educational program for prevention of inland water accidents and lack of professional water rescue experts. Third is cooperation defect such as dispersed reporting system and lack of private-public partnership in accident response. Fourth is the defect of emergency response ability, professionalism and accident response skills due to the dispersion and overlaps of safety management systems. In order to improve these defects, this study finds the countermeasures based on the survey of water sports professions and users and its analysis as follows: legislation of '(tentatively named) special act for water safety management in inland waters' is suggested in the legal aspects. A development of inland waters safety education program and training of water accident experts are suggested in the instructional aspects. Integrated operational system for water accident management, activation of safety network and re-establishment of private-public partnership are suggested in the cooperation aspects. Systematic and efficient inland water safety management plans such as enhancement of accident response skills and expertise and integrated inland water safety management with fire department-centered system were suggested in the aspects of emergency response ability.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2015.10a
/
pp.465-467
/
2015
This paper implements a dual-mode power strip controller (PSCtrl) with environmental sensors which cooperates with Android-based smartphones. According to the statistics on fires in housing facilities, unidentified electrical fires account for 23.4%. In order to reduce these fire accidents caused by user carelessness and protect life and property, smart power control techniques with improved user convenience are required. For this reason, the implemented dual-mode PSCtrl controls ON-OFF operations of a power strip in two ways (e.g. manual and automatic modes) by cooperating with Android-based smartphones provided with environmental data from light, temperature, and humidity sensors. In manual mode, users check environmental data displayed on Android-based smartphones, forcibly controlling the ON-OFF operations through the dual-mode PSCtrl, and in automatic mode, when environmental data exceeds the threshold set by users in advance, the dual-mode PSCtrl automatically controls the ON-OFF operations. Some experimental tests verify successful dual-mode operations of the implemented dual-mode PSCtrl.
Journal of the Computational Structural Engineering Institute of Korea
/
v.30
no.5
/
pp.453-460
/
2017
In the offshore industry, helicopters are mainly used for transportation of goods or operating personnel between offshore sites and onshore facilities. A helideck is a structure that is required for landing and take-off of helicopters on the offshore structure. There are several shapes of helidecks depending on the type of offshore structures or installation location. Among them, cantilever-type helidecks usually provide more space on the topside of offshore structures and it is safer against potential accidents like fire or explosion. In this paper, the cantilever-type helideck is selected for the research object and topology design optimization is applied for lightweight design of the helideck. A finite element model is then created from the optimal layout of truss structures of the helideck, and structural analysis is performed under various landing conditions and wind loads. Based on the analysis results, the detailed section dimensions of structural members are determined so that the maximum stress at each structure member does not exceed the allowable stress of the structural material. Also, the final optimal design shows significant decrease in the total weight of the helideck.
The Journal of the Convergence on Culture Technology
/
v.6
no.2
/
pp.55-70
/
2020
This study aims to identify the influence of risk-inducing factors and safety inspection on the measures of reducing accidents among workers of building structures in small construction sites. The result can be summarized as follows: First, as for the influence of risk-inducing factors on human factors, preparation for work, disintegrating molds, taking follow-up measures, and keeping records, have statistically significant influences. Therefore, it can be said that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and human factors. Second, as for the influence of risk-inducing factors on facility factors, preparation for work, and taking follow-up measures influenced significantly. This indicates that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and facility factors. Third, as for the influence of risk-inducing factors on management factors, the installation of shores and risk assessment are found to have significant effects. This shows that safety inspection has a partial mediating effect in the relationship between risk-inducing factors and management factors. Fourth, the influence of risk-inducing factors on work factors was significant only in the installation of shores. This indicates that safety inspection has a completely mediating effect in the relationship between risk-inducing factors and work factors. Finally, in the relationship between risk-inducing factors and accident reduction measures, preparation for work, installation of shores, and taking follow-up measures showed significantly positive influences. In contrast, keeping records has a significant negative influence. Thus, safety inspection has a partial mediating effect in the relationship between risk-inducing factors and management factors.
Choi, Ji-Hun;Choi, Seung-Jai;Cho, Chul-Min;Kim, Tae-Kyun;Kim, Jang-Ho Jay
Journal of the Korea Concrete Institute
/
v.28
no.6
/
pp.673-683
/
2016
In recent years, frequent terror or military attack by explosion, impact, fire accidents have occurred. Particularly, World Trade Center collapse and US Department of Defense Pentagon attack on Sept. 11 of 2001. Also, nuclear power plant incident on Mar. 11 of 2011. These attacks and incidents were raised public concerns and anxiety of potential terrorist attacks on major infrastructures and structures. Therefore, the extreme loading researches were performed of prestressed concrete (PSC) member, which widely used for nuclear containment vessel and gas tank. In this paper, to evaluate the blast resistance capacity and its protective performance of bi-directional unbonded prestressed concrete member, blast tests were carried out on $1,400{\times}1,000{\times}300mm$ for reinforced concrete (RC), prestressed concrete without rebar (PSC), prestressed concrete with rebar (PSRC) specimens. The applied blast load was generated by the detonation of 55 lbs ANFO explosive charge at 1.0 m standoff distance. The data acquisitions not only included blast waves of incident pressure, reflected pressure, and impulse, but also included displacement, acceleration, and strains at steel, concrete, PS tendon. The results can be used as basic research references for related research areas, which include protective design and blast simulation under blast loading.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.12
no.2
/
pp.99-107
/
1998
This dissertationhas confirmed the non-flam mability of cast mold transformer that is increasingly used lately. As a research progress, the investigation has been performed on the installation status and each line of the subway system which have the most mold transformer accidents, and the impediment status of the transformer for rectifier and the high-voltage distribution transformer per each manufacturer. Then, a high voltage mold of the actual mold transformer has been installed in the horiwntal heating furnace and the heat has been applied by the standard heating temperature curve of KSF 2257(Fireproof testing meth od of the construction structures: 1993). Accordingly, the combustibility of the mold transformer based on the test results has been found that 78 minutes has been required for the complete burning per the KSF 2257 combustion test curve and that, after stopping the heat application of the horizontal furnace after ignition, the flame progress has not been made but shown as the self-extinguishing characteristics when the flame progress has been checked. Thus, the non-flammability and self-extinguishability of the mold transformer have been confirmed. The result of this dissertation has indicated that the accident involving mold transformer has been progressed and expanded by the dielectric breakdown or void due to the crack in the mold rather than a fire accident caused by a short-circuit or an overload.r an overload.
The Journal of the Convergence on Culture Technology
/
v.6
no.1
/
pp.135-145
/
2020
This research is mainly aimed at finding out about the effects of the safety and health management system on corporate performance through systematic operation by efficiently allocating material and human resources within the company by participating all employees and stakeholders in order to prevent and maintain industrial accidents and the optimal working environment, and how to maintain and activate the safety and health management system at the center of electric contractors.The analysis results are as follows. First, management, organizational management and resource preparation will have a positive impact on the management capability of the electric power corporation. It was assessed that the more well-transmitted and understood within the organization, the better the construction plan, the better the equipment management status, the more positively the management capability of electric works was to be achieved. Second, management, organizational management and resource preparation will have a positive impact on corporate management performance.This seems to have a positive effect on a company's business performance when the standards of OHSAS are met with construction plan and construction equipment management are high as related information such as industrial safety and health laws are strengthened and companies' safety and health activities, advanced safety and culture are released to facilitate organizational management.Third, the management ability of the electric power corporation will have a mediated effect on the effect of management, organization management and resource preparation on the performance of the enterprise. This means that the direct effect of the independent variable management organization on corporate management performance is .401 The indirect effect is .168.658 shows that the direct effect of resource preparation on corporate management performance is .423, the indirect effect is .178 and the total effect.It was analyzed at 643.
Purpose : The purpose of this study was to analyze the prehospital care report prepared by EMS squads of 119 center in Gyeonggi area and to identify the status of prehospital care activities, problems and improvement possibilities of the emergency care. Method : Five hundred copies of prehospital care report prepared by EMS squads in thirty-eight 119 centers under 18 fire stations in Gyeonggi area from March to April in 2008 were randomly chosen for the analysis. Data abstracted according to the purpose of the study were input and the analysis of prehospital care activities were performed using SPSS-WIN(ver. 16) statistics package. Results : 1. Total 500 cases of prehospital emergency care activities were reviewed. By sex, females were 219 (43.8%) and males were 281 (56.2%). The places of reporting were home (57.8%). According to the type of emergency, 281 cases (56.2%) were caused by disease and 291 (43.8%) were from other causes such as traffic accidents or incidental injuries. 2 The average time needed for the 119 EMS squad to arrive at the scene after being reported was 7.29 minutes. The time used at the scene for the emergency care was 7.3 minutes in average and the time to arrive at the hospital was 25.4 minutes in average. 3. In patient evaluation, in 68% of the cases more than two vital signs were measured at one time and emergency patients were 31%, and non-emergency patients were 69%. 4. In one EMS activity, average 2.15 cases of emergency care were provided to a patient. The cases where two kinds of emergency care were given were 14.4%, which is the most frequent cases. When reviewing the details of the emergency cares given to the patient including multiple cares, trivial cards (taking it easy and giving comfort) were the most frequent one as 40.6% and the medical direction of the doctor was given in only one case out of 500 cases. 5. In patient evaluation and emergency care, vital signs were provided to emergency patients at significantly higher rate comparing to the non-emergency patients. The number of emergency care performance was significantly higher in emergency cases. In emergency dispatch, the cases that EMT (1st class) was on board was 86.2%. When comparing the cases when the 1st class EMT was on board and otherwise, the cases with the presence of 1st class EMT showed more vital signs were detected but there was no significant difference in the number of emergency cares provided. Conclusion : It seemed that the on-scene emergency care did not satisfy the expectations. So it is necessary to enforce the cooperation between the elements, the qualifications of the 119 EMS squads and to improve the prehospital working environment in order to provide the better medical service at any time.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.