• Title/Summary/Keyword: Fire Management

Search Result 1,689, Processing Time 0.03 seconds

A Study on Rationalization of National Forest Management in Korea (국유림경영(國有林經營)의 합리화(合理化)에 관(關)한 연구(硏究))

  • Choi, Kyu-Ryun
    • Journal of Korean Society of Forest Science
    • /
    • v.20 no.1
    • /
    • pp.1-44
    • /
    • 1973
  • Needless to say, the management of national forest in all countries is very important in view of the national mission and management purposes. Korean national forest is also in particular significant in promoting national economy for the continuous increasing of the demand for wood, conservation of the land and social welfare. But there's no denying the fact that the leading aim of the Korean forest policy has been based upon the conservation of forest resources and recovery of land conservation function instead of improvement of the forest productive capacity. Therefore, the management of national forest should be aimed as an industry in the chain of the Korean national economy. And the increment of the forest productive capacity based on rationalized forest management is also urgently needed. Not only the increment of the timber production but also the establishment of the good forest in quality and quantity are to bring naturally many functions of conservation and other public benefits. In 1908 Korean national forest was historically established for the first time as a result of the notification for ownership, and was divided into two kinds in 1911-1924, such as indisposable national forest for land conservation, forest management, scientific research and public welfare, and the other national forest to be disposed. Indisposable forest is mostly under the jurisdiction of national forest stations (Chungbu, Tongbu, Nambu), and the tother national forests are under custody of respective cities and provinces, and under custody of the other government authorities. As of the end of 1971, national forest land is 19.5% (1,297,708 ha) of the total forest land area, but growing stock is 50.1% ($35,406,079m^3$) of the total forest growing stock, and timber production of national forest is 23.6% ($205,959m^3$) of the year production of total timber in Korea. Accordingly, it is the important fact that national forest occupies the major part of Korean forestry. The author positively affirms that success or failure of the management of national forest controls rise or fall of forestry in Korea. All functions of forest are very important, but among others the function of timber production is most important especially in Korea, that unavoidably imports a large quantity of foreign wood every year (in 1971 import of foreign wood-$3,756,000m^3$, 160,995,000 dollars). So, Korea urgently needs the improvement of forest productive capacity in national forest. But it is difficult that wood production meets the rapid increase of demand for wood to the development of economy, because production term of forestry is long, so national forest management should be rationalized by the effective investment and development of forestry techniques in the long view. Although Korean national forest business has many difficulties in the budget, techniques and the lack of labour due to outflow of rural village labour by development of national economy, and the increase of labour wages and administrative expenses etc. the development of national forest depends on adoption of the suitable forest techniques and management adapted for social and economical development. In this view point the writer has investigated and analyzed the status of the management of national forest in Korea to examine the irrational problems and suggest an improvement plan. The national forestry statistics cited in this study is based on the basic statistics and the statistics of the forest business as of the end of 1971 published by Office of Forestry, Republic of Korea, and the other depended on the data presented by the national forest stations. The writer wants to propose as follows (seemed to be helpful in improvement of Korean national forest management). 1) In the organization of national forest management, more national forest stations should be established to manage intensively, and the staff of working plan officials should be strengthened because of the importance of working plan. 2) By increasing the staff of protection officials, forest area assigned for each protection official should be decreased to 1,000-2,000 ha. 3) The frequent personnel changes of supervisor of national forest station(the responsible person on-the-spot) obstructs to accomplish the consistent management plan. 4) In the working plan drafting for national forest, basic investigations should be carefully practiced with sufficient expenditure and staff not to draft unreal working plan. 5) The area of working-unit should be decreased to less than 2,000 ha on the average for intensive management and the principle of a working-unit in a forest station should be realized as soon as possible. 6) Reforestation on open land should be completed in a short time with a debt of the special fund(a long term loan), and the land on which growing hardwood stands should be changed with conifers to increase productivity per unit area, and at the same time techical utilization method of hardwood should be developed. 7) Expenses of reforestation should be saved by mechanization and use of chemicals for reforestation and tree nursery operation providing against the lack of labour in future. 8) In forest protection, forest fire damage is enormous in comparison with foreign countries, accordingly prevention system and equipment should be improved, and also the minimum necessary budget should be counted up for establishment and manintenance of fire-lines. 9) Manufacture production should be enlarged to systematize protection, processing and circulation of forest business, and, by doing this, mich benefit is naturally given for rural people. 10) Establishment and arrangement of forest road networks and erosion control work are indispensable for the future development of national forest itself and local development. Therefore, these works should be promoted by the responsibility of general accounting instead of special accounting. 11) Mechanization of forest works should be realized for exploiting hinterlands to meet the demand for timber increased and for solving lack of labour, consequently it should promote import of forest machines, home production, training for operaters and careful adminitration. 12) Situation of labour in future will grow worse. Therefore, the countermeasure to maintain forest labourers and pay attention to public welfare facilities and works should be considered. 13) Although the condition of income and expenditure grows worse because of economical change, the regular expenditure should be fixed. So part of the surplus fund, as of the end of 1971, should be established for the fund, and used for enlarging reforestation and forest road networks(preceding investment in national forest).

  • PDF

Developing a Model for Crime Prevention Hardware Performance Test and Certification System (방범하드웨어의 침입범죄 저항성능 시험·인증 체계에 관한 모형 연구)

  • Park, Hyeon-ho
    • Korean Security Journal
    • /
    • no.36
    • /
    • pp.255-292
    • /
    • 2013
  • Burglary (also called breaking and entering and sometimes housebreaking) is a crime, the essence of which is illegal entry into a building for the purposes of committing an offence. It is one of the most common types of crime and also a serious issue for every society. A house that is left insecure is an accessible and attractive target for burglars and therefore burglary resistance test & certification system for doors and windows has been developed in many countries. This paper explores several advanced foreign burglary resistance test/certifcation cases (the British SBD, the Dutch KOMO SKH/SKG, the Japanese CP mark, the Australian Standard Certification) for security products and domestic test/certification systems for fire safety products as a comparative study so that any improvement points can be gained for South Korea in the field of security product performance. The comparative analysis results show that South Korea is far behind the security product certification system and needs a lot of improvement in the system by benchmarking foreign cases. The domestic test/certification systems for fire safety products also give some insights for burglary-related security products' performance certification system in Korea. Overall, the need for relevant rules and regulations, the establishment of standards regarding testing and certification, including certified security +hardware product in building security certification system, performance testing as well as production testing (i.e. quality management system evaluation), the basic competency of testers, incentive system for certified/high quality security products were suggested in order to make an optimal model for the security production performance testing and certification system in Korea.

  • PDF

A Study in an Effective Programs for Emergency Care Delivery System (응급의료 전달체계의 충실 방안)

  • Kwon Sook Hee
    • Journal of Korean Public Health Nursing
    • /
    • v.9 no.1
    • /
    • pp.83-102
    • /
    • 1995
  • As the society is being industrialized, the fast-paced economic development that has caused substantial increase in cerebrovascular and coronary artery diseases and the industrial development and increased use of means of transportation have resulted in the rapid rise of incidents in external injuries as well. So the pubic has become acutely aware of the need for fast and effective emergency care delivery system. The goal of emergency care delivery system is to meet the emergency care needs of patients. The emergency care delivery system is seeking to efficiently satisfy the care needs of people. Therefore the purpose of this study is designed to develop an effective programs for emergency care delivery system in Korea. The following specific objectives were investigated. This emergency care delivery system must have the necessary man power, for transfering the patients, communication net work, and emergency care facilities. 1) Man power Emergency care requires n0t only specialized traning in the emergency treatment but also knowledge and experience i11 other related area, so emergency care personnel traning program should be designed in order to adapt to the specific need of emergency patients. It will be necessary to ensure professional personnel who aquires the sufficient traning and experience for emergency care and to look for legal basis. We have to develop re-educational programs for emergency nurse specialist. They should be received speciality of emergency nursing care so that they will work actively and positively in emergency part. Emergency medical doctor and nurse specialist should be given an education which is related in emergency and critical care. Emergency care personnel will continue to provide both acute and continuing care as partner with other medical team. 2) Transfering the patients. Successful management of pre-hospital care requires adequate traning for the emergency medical technician. Traning program should be required to participate in a actual first aids activites in order to have apportunities to acquire practical skills as well as theoretical knowledge. The system of emergency medical technician should be remarkablly successful with first responder firefighters. Establishing this system must add necessary ambulances operating at any given time. It will be necessary to standardize the ambulance size and equipment. Ambulance should be arranged with each and every fire station. 3) Communication net work. The head office of emergency commumication network should be arranged with the head office of fire station in community. It is proposed that Hot-line system for emergency care should be introduce. High controlled ambulance and thirtial emergency center should simultaneously equip critical-line in order to communication with each other. Ordinary ambulance and secondary emergency facility should also simultaneously equip emergency-line in order to communication with each other. 4) Emergency care facilities. Primary emergency care facilities should be covered with the ambulatory emergency patients-minor illness and injuires. Secondary emergency care facilities should be covered with the emergency admission patients. Third emergency care center should be covered with the critical patients who need special treatments and operation. Secondary and third emergency care facilities should employ emergency medical doctor and emergency nurse specialist to treat in-patients with severe and acute illness and multiple injuires. It should be fashioned for a system of emergency facilities that meets emergency patients needs. Provide incentives for increased number of emergency care facilities with traning in personal/clinical emergency care. 5) Finance It is recommended to put the finance of a emergency care on a firm basis. The emergency care delivery system should be managed by the government or accreditted organizations. In order to facilitate this relevant program the fund is needed for more efficient and effective emergency researchs, service, programs, and policy. 6) Gaining understanding and co-operation of pubic It is also important to undertake pubic education to improve understanding of first aids and C. P. R of individuals, communities and business. It is proposed that teachers and health officers be certified in C. P. R. The C. P. R education can be powerful influence save lives. Lastly appropriate emergency care information must be provided to the pubic for assisting them in choosing emergency care.

  • PDF

The Study about Role and Importance of Site Activity Stage in Safety Activity for the International Conference among Several Countries (다자간 국제회의 안전활동에 있어서 현장활동단계의 역할 및 중요성에 관한 연구 : 부산 APEC 행사를 중심으로)

  • Lee, Sun-Ki
    • Korean Security Journal
    • /
    • no.19
    • /
    • pp.105-138
    • /
    • 2009
  • This study's purpose is to present the improvement of effectiveness of security activity for international conference among Several Countries which can be held hereafter. On the basis of security activity problems originating in APEC that had been held in Busan in 2005. I made up questions three times to on the members of the police, military, fire figher and national intelligence service who had experienced in Busan APEC and recognition of possible problem and possibility of improvement on each item of questions was analyzed by Delphi Method. Also interviews with 4 security experts selected from each security agency were conducted to present improvement in each part of problem. The results obtained from the face to face interview with four experts of security-enforcement agency about the role and importance of site activity stage for international conference among several countries are as followings ; First, the system that experienced security-enforcement agents can be selected for the next national security event is needed, by data-basing the security-enforcement agents who were experienced in security event as man power management. Second, the middle-term plan for the introduction of high-tech equipment and joint inspection with relevant security agents are needed for the efficient explosive technical detection. Third, high-tech security equipment could be introduced through the international high-tech security equipment exhibition. Fourth, an anti-terrorism plan should be measured by sharing information through the cooperation with domestic and international intelligence agency. Fifth, public relations should be measured systematically by organization rather than agents' individual public relations. Sixth, political consideration to secure integrative coordination with other agency is needed for security activity, through normal cooperation with fire fighting related agency such as an electric, gas, elevator company. Seventh, a definite press guideline is needed for a convenient news coverage and safety during security event.

  • PDF

A Study on the Reliability Analysis and Risk Assessment of Liquefied Natural Gas Supply Utilities (천연가스 공급설비에 대한 기기신뢰도 분석 및 위험성 평가)

  • Ko, Jae-Sun;Kim, Hyo
    • Fire Science and Engineering
    • /
    • v.17 no.1
    • /
    • pp.8-20
    • /
    • 2003
  • Natural gas has been supplied through underground pipelines and valve stations as a new city gas in Seoul. In contrast to its handiness the natural gas has very substantial hazards due to fires and explosions occurring from careless treatments or malfunctions of the transporting system. The main objectives of this study are to identify major hazards and to perform risk assessments after assessing reliabilities of the composing units in dealing with typical pipeline networks. there-fore two method, fault tree analysis ;1nd event tree analysis, are used here. Random valve stations are selected and considered its situation in location. The value of small leakage, large rupture, and no supply of liquefied natural gas is estimated as that of top event. By this calculation the values of small leakage are 3.29 in I)C valve station, 1.41 in DS valve station, those of large rup-lure are $1.90Times10_{-2}$ in DC valve station, $2.32$\times$10^{-2}$ in DS valve station, and those of no supply of LNG to civil gas company are $2.33$\times$10 ^{-2}$ , $2.89$\times$10^{-2}$ in each valve station. And through minimal cut set we can find the parts that is important and should be more important in overall system. In DC valve station one line must be added between basic event 26,27 because the potential hazard of these parts is the highest value. If it is added the failure rate of no supply of LNG is reduced to one fourth. In DS valve station the failure rate of basic event 4 is 92eye of no supply of LNG. Therefore if the portion of this part is reduced (one line added) the total failure rate can be decreased to one tenth. This analytical study on the risk assessment is very useful to prepare emergency actions or procedures in case of gas accidents around underground pipeline networks and to establish a resolute gas safety management system for loss prevention in Seoul metropolitan area.

A Study on the Consciousness Survey for the Establishment of Safety Village in Disaster (재난안전마을 구축을 위한 의식조사 연구)

  • Koo, Wonhoi;Baek, Minho
    • Journal of the Society of Disaster Information
    • /
    • v.14 no.3
    • /
    • pp.238-246
    • /
    • 2018
  • Purpose: The purpose of this study is to examine the directions for establishing a disaster safety village in rural areas where damage from a similar type of disaster occurs repeatedly by conducting the consciousness survey targeting at experts and disaster safety officials in a local government. Method: The risks of disaster in rural areas were examined and the concept and characteristics of disaster safety village which is a measure on the basis of Myeon (township) among the measures of village unit were examined in order to carry out this study. In addition, opinion polling targeting at officials-in-charge in the local government and survey targeting at experts in disaster safety and building village were conducted. Based on the findings, the directions for establishing a disaster safety village that fitted the characteristics of rural areas were examined. Result: The officials-in-charge in the local government answered that rural areas have a high risk of storm and flood such as heavy snowing, typhoon, drought, and heavy rain as well as forest fire, and it is difficult to draw voluntary participation of farmers for disaster management activities due to their main duties. They also replied that active support and participation of residents in rural areas are necessary for future improvement measures. The experts mostly replied that the problem of disaster safety village project is a temporary project which has low sustainability, and the lack of connections between the central government, local governments and residents was stressed out as the difficulties. They said that measures to secure the budget and the directions of project promotion system should be promoted by the central government, local governments and residents together. Conclusion: The results of this study are as follows. First, a disaster safety village should be established in consideration of the disaster types and characteristics. Second, measures to secure the budget for utilizing the central government fund as well as local government fund and village development fund should be prepared when establishing and operating a disaster safety village in rural areas. Third, measures to utilize a disaster safety village in rural areas for a long period of time such as the re-authorization system should be prepared in order to continuously operate and manage such villages after its establishment. Fourth, detailed measures that allow residents of rural areas to positively participate in the activities for establishing a disaster safety village in rural areas should be prepared.

Learning from the USA's Single Emergency Number 911: Policy Implications for Korea (미국 긴급번호 911 운영시스템에 관한 연구: 긴급번호 실질적 통합을 위한 정책 시사점 제시 중심으로)

  • Kim, Hak-Kyong;Lee, Sung-Yong
    • Korean Security Journal
    • /
    • no.43
    • /
    • pp.67-97
    • /
    • 2015
  • In Korea, a single emergency number, such as 911 of the USA and 999 of the UK, does not exist. This issue became highly controversial, when the Sewol Ferry Sinking disaster occurred last year. So, the Korean government has planned to adopt a single emergency number, integrating 112 of the Police, 119 of the Fire and Ambulance, 122 of the Korean Coast Guard, and many other emergency numbers. However, the integration plan recently proposed by the Ministry of Public Safety Security seems to be, what is called, a "partial integration model" which repeals the 122 number, but still maintains 112, 119, and 110 respectively. In this context, the study looks into USA's (diverse) 911 operating system, and subsequently tries to draw general features or characteristics. Further, the research attempts to derive policy implication from the general features. If the proposed partial integration model reflects the policy implications, the model can virtually operate like the 911 system -i.e. a single emergency number system - creating inter-operability between responding agencies such as police, fire, and ambulance, even though it is not a perfect integration model. The features drawn are (1) integration of emergency call-taking, (2) functional separation of call-taking and dispatching, (3) integration of physical facilities for call-taking and dispatching, and (4) professional call-takers and dispatchers. Moreover, the policy implications derived from the characteristics are (1) a user-friendly system - fast but accurate responses, (2) integrated responses to accidents, (3) professional call-taking and dispatching & objective and comprehensive risk assessment, and finally (4) active organizational learning in emergency call centers. Considering the policy implications, the following suggestions need to be applied to the current proposed plan: 1. Emergency services' systems should be tightly linked and connected in a systemic way so that they can communicate and exchange intelligence with one another. 2. Public safety answering points (call centers) of each emergency service should share their education and training modules, manuals, etc. Common training and manuals are also needed for inter-operability. 3. Personal management to enable-long term service in public safety answering points (call centers) should be established as one of the ways to promote professionalism.

  • PDF

Risk Ranking Analysis for the City-Gas Pipelines in the Underground Laying Facilities (지하매설물 중 도시가스 지하배관에 대한 위험성 서열화 분석)

  • Ko, Jae-Sun;Kim, Hyo
    • Fire Science and Engineering
    • /
    • v.18 no.1
    • /
    • pp.54-66
    • /
    • 2004
  • In this article, we are to suggest the hazard-assessing method for the underground pipelines, and find out the pipeline-maintenance schemes of high efficiency in cost. Three kinds of methods are applied in order to refer to the approaching methods of listing the hazards for the underground pipelines: the first is RBI(Risk Based Inspection), which firstly assess the effect of the neighboring population, the dimension, thickness of pipe, and working time. It enables us to estimate quantitatively the risk exposure. The second is the scoring system which is based on the environmental factors of the buried pipelines. Last we quantify the frequency of the releases using the present THOMAS' theory. In this work, as a result of assessing the hazard of it using SPC scheme, the hazard score related to how the gas pipelines erodes indicate the numbers from 30 to 70, which means that the assessing criteria define well the relative hazards of actual pipelines. Therefore. even if one pipeline region is relatively low score, it can have the high frequency of leakage due to its longer length. The acceptable limit of the release frequency of pipeline shows 2.50E-2 to 1.00E-l/yr, from which we must take the appropriate actions to have the consequence to be less than the acceptable region. The prediction of total frequency using regression analysis shows the limit operating time of pipeline is the range of 11 to 13 years, which is well consistent with that of the actual pipeline. Concludingly, the hazard-listing scheme suggested in this research will be very effectively applied to maintaining the underground pipelines.

A Study on the Estimation Method of the Repair Rates in Finishing Materials of Domestic Office Buildings (국내 업무시설 건축 마감재의 수선율 산정 방안에 관한 연구)

  • Kim, Sun-Nam;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.52-63
    • /
    • 2015
  • Business facilities among domestic architectures have rapidly been constructed along with domestic economic development. It is an important facility taking the second largest proportion next to apartment buildings among current 31 building types of fire department classification of 2012 year for urban architectures. The expected service life of business facilities is 15 years, but 70% of those in urban areas have surpassed the 15 year service life as of the present 2014. Thus, the demand for urgent rehabilitation of such facilities is constantly increasing due to the aging and performance deterioration of the facilities'main finishing materials. Especially, the business facilities are being used for the lease of company office or private office, and such problems as aging and performance deterioration of the facilities could cause less competitive edge for leasing and real estate value depreciation for the O&M (Operation & Management) agent and the owner, respectively. Therefore, an effective planned rehabilitation as a preventive measure according to the standardized repair rate by the number of years after the construction is in need in order to prevent the aging and performance deterioration of the facilities(La et al. 2001). Nonetheless, domestic repair/rehabilitation standards based on the repair rate are mainly limited to apartment buildings and pubic institutions, resulting in impractical application of such standards to business facilities. It has been investigated and analyzed that annual repair rate data for each finishing material are required for examination of the applicability of the repair rate standard for the purpose of establishment of a repair plan. Hence, this study aimed at developing a repair rate computation model for finishing materials of the facilities and verifying the appropriateness of the annual repair rate for each finishing material through a case study after collecting and analyzing the repair history data of six business facilities. The results of this study are expected to contribute to the planning and implementation of more efficient repair/rehabilitation budget by preventing the waste of unpredicted repair cost and opportunity cost for the sake of the business facilities' owners and O&M agents.

An Analysis for the Economic Impact of Forest Road Investment (임도시설 투자의 경제적 파급효과 분석)

  • Lee, Seung-Jung;Jung, Byung-Heon;Kim, Ki-Dong;Jeon, Hyon-Sun;Jo, Min-Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.106 no.2
    • /
    • pp.219-229
    • /
    • 2017
  • Forest road is an essential infrastructure for forest management such as the composition and management of forest resources, timber and forest byproduct production & transportation. It has recently been utilized forest recreation and forest sports as well as also forest pest control, forest fire prevention and evolution. When you build a forest road, the economic function in the forest is activated, so that it can result in the ripple effect of induced employment, value-added creation and production inducement. The purpose of this study is to analyze the impact caused by forest road construction occurring as the overall economy. For analysis it was applied to inter industry analysis method that is a method for analyzing the quantitative cross-correlation. The data were used in the Input-Output Tables In 2014, the Bank of Korea. When you build a forest road, economic effect due to the construction of the forest road is generated and economic effects are also generated due to the increase in the production of forest products after the construction of the forest road. Therefore, we will analyze the economic impact of the two effects. The estimated economic value of forest products, which is the economic effect of forest product cultivation, was calculated through some assumptions and the economic ripple effect was analyzed. The forest road construction sector is defined as land clearing and reclamation, and irrigation project construction and the forestry forest products sector is defined as the sum of raw timber, edible forest products and misc. forest products. In total, 32 sectors were classified, and except for the two sectors defined as forest road construction and forestry forest products, the remaining sectors were integrated according to the classification system of 30 integrated classifications of the Bank of Korea. As a result, the production inducement coefficient for forest construction was analyzed to be 2.767 and the production inducement coefficient for forestry forest products was analyzed to be 1.565. This means that 2,767 times the production of forest road construction investment is induced in the whole industry and the production of 1.562 times the amount of forestry forest products is caused by the whole industry as the production of forestry forest products increases. The value added inducement coefficient for forest road construction was 0.977 and the value added inducement coefficient for forestry forest products was 0.985. Forest road are essential infrastructure for forestry development and should be continuously invested because they are essential elements of timber production and forest byproduct production with functions such as forest management, forest recreation, forest sports, and town connection.