ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

원가기반의 공동주택 마감재 정보관리 방안 연구 (A Cost-Based Interior Information Management for an Apartment Housing Project)

  • 이훈구;이윤선;문혁;김재준
    • 한국건설관리학회논문집
    • /
    • 제10권5호
    • /
    • pp.76-84
    • /
    • 2009
  • 최근 장기간에 걸친 주택경기 침체 수요와 공급의 불균형에 의한 정적재고 증가, 수요자의 주거선호 변화 등으로 인해 차별화의 개념이 주택시장에서 경쟁우위 확보의 주요 요소로 대두되고 있다. 동일한 단위 평면 안에서 마감재 디자인 요소의 차별화에 의해 수많은 마감재 정보가 발생되고 고급화된 사양 선택으로 인하여 공동주택 단위 세대 내부의 마감 원가가 상향되고 있다. 본 연구는 현행 마감재 설계 단계의 프로세스를 대상으로 마감재 설계 및 대안 선정 시 발생되는 원가관리 측면에서의 문제점과 대규모 공동주택 건설 시 대량으로 발생하는 디자인정보, 원가정보, 작업정보 관리 측면에서 마감재 정보관리 문제점을 도출하고, 문제점을 해결하기 위한 방안으로 마감재 설계 및 대안 선정 시 원가관리와 정보를 관리 할 수 있도록 마감재의 디자인, 원가, 작업 정보를 통합하였다. 또한 프로젝트 원가관리 요소별 개선을 통해 원가기반의 마감재 정보 관리 프로세스를 제안하였다.

자기연마법을 이용한 금형면의 다듬질 가공자동화 연구 (A Study on Automatic Finishing for Die & Mold Surface Using Magnetic Abrasive Polishing)

  • 이용철;안제정박;중천위웅
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1995년도 춘계학술대회 논문집
    • /
    • pp.97-101
    • /
    • 1995
  • This paper describes a new surface finishing process which uses magnetic abrasive polishing. This is applied to automatic finishing of die & mold surface. Nowadays, most of die & mold meanufaturing procedures have been automated by the introduction of NC machine tool and CAD/CAM system. But the surface finishing of die & mold must be done by hand work of well-skilled workers. Though many attempts were tried in the past 15 years to eliminate this hand work, the automatic finishing of die & mold surface with 3D curvature has not been achieved yet. New magnetic abrasive finishing process is thought as one of the possible methods for the automation of 3D surface finishing. In order to improve the grindability of the method, ultra-high speed and 5-axis machining was introduce. The magnetic abrasive polishing which has adopted these methods was confirmend to improve the efficiencyof die & mold surface finishing.

  • PDF

AHP기법을 활용한 노출콘크리트 마감공법 하자 도출 (A Study on the Defects of Exposed Concrete Finishing Work Using AHP)

  • 최성미;송영웅;이기석;유성훈;최윤기
    • 한국건설관리학회논문집
    • /
    • 제20권4호
    • /
    • pp.46-55
    • /
    • 2019
  • 노출콘크리트 마감공법은 1990년대 외부 입면 형식의 다양화, 시공기술의 발달, 콘크리트 품질 향상 등으로 인하여 노출콘크리트 마감공법의 적용사례가 증가하기 시작하였고 최근까지 노출콘크리트 마감공법을 사용하는 경우가 증가하는 추세이다. 이에 따라 품질향상을 위해 많은 연구가 진행되었지만 노출콘크리트 마감공법의 하자발생은 여전한 상태이다. 본 연구는 노출콘크리트 마감공법의 하자발생을 방지하고 품질을 확보하기 위한 통합관리의 필요성을 제고하기 위해 하자발생의 원인을 프로세스별로 분석하였다. 또한 사례조사와 AHP 분석을 통해 노출콘크리트 마감공법에서 발생하는 하자의 중요성을 도출하였다. 본 연구를 통해 노출콘크리트 마감공법의 발생하자가 기존의 하자의 발생 원인에 따라 한 프로세스마다 국한되어있는 관리가 아닌 프로세스 전반에 걸쳐 관리가 필요하다고 판단되며, 노출콘크리트 마감공법의 하자 방지 및 품질향상을 위한 통합관리가 요구되고 있다고 분석되었다.

인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안 (Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

여성 재킷의 생산능력 설정을 위한 연구 (A Study on the Productive Capacity Setting of Women's Jacket)

  • 김진선;심규남;오순
    • 한국의류산업학회지
    • /
    • 제13권2호
    • /
    • pp.269-278
    • /
    • 2011
  • This study aims at setting up productive capacity which can be usefully utilized for work management of apparel manufacturers. So as to achieve this goal, an apparel manufacturing company which has been operated by miniline system in Seoul was selected. Standard time and man-hour were calculated to create the accurate productive capacity by observing and measuring a work flow included cutting, sewing and finishing processes. And the result is as following. The standard time for each process was presented as cutting process 47004.5s, sewing process 671050.5s and finishing process 22426.3s. And 15284.4ms was computed as total procession man-hour per day of the manufacturer which is organized of 16 people. Also, the procession man-hour for each process was revealed as cutting process 396.7ms(2.6%), sewing process 14509.3ms(94.9%) and finishing process 378.5ms(2.5%). +Surplus was found in the productivity for each process included the cutting process(outshell, lining and seam process), the sewing process(preparation and arrangement process) and the finishing process. But, additional man-hour 52436.18ms was required because the productive capacity was calculated as -surplus(-13.9%) in the sewing process(part and assembly process). Therefore, a work schedule was planned based on the previous result. However, loading can be ideal when a capacity and a load become '0'. The object company should find the way to reduce allowance(26.25%) of the sewing process through reconstruction of consciousness and improvement in functions with analyzing works of operators. Also, they need to consider an additional supplement of the personnel.

Hazardous Factors and Accident Severity of Cabling Work in Telecommunications Industry

  • Kim, Yang Rae;Park, Myoung Hwan;Jeong, Byung Yong
    • 대한인간공학회지
    • /
    • 제35권3호
    • /
    • pp.155-163
    • /
    • 2016
  • Objective: This study aims to draw the characteristics of occupational accidents occurred in cabling work, and assess accident severity based on occupational injury data. Background: Accident factors and accident risk are different by the place of work in cabling work. Field managers require information on accident prevention that can be easily understood by workers. However, there has been a lack of studies that focus on cabling work in Korea. Method: This study classifies 450 injured persons caused in cabling work by process, and analyzes the characteristics of occupational injuries from the aspects of age, work experience and accident type. This study also analyzes accident frequency and severity of injury. Results: Results show that preparing/finishing (33.3%) was the most common type of cabling process in injuries, followed by maintenance (28.4%), routing/income (23.1%) and wiring/installation (15.1%) process. The critical incidents in the level of risk management were falls from height in the routing/incoming process, and falls from height in the maintenance process. And, incidents ranked as 'High' level of risk management were slips and trips, fall from height and vehicle incident in the preparing/finishing process, and fall from height in the wiring/installation process. Conclusion and Application: The relative frequency of accident and its severity by working process serve as important information for accident prevention, and are critical for determining priorities in preventive measures.

사출금형 사상공정의 체계화 (Systematic Finishing Process of Injection Molds)

  • 박민수;김민태;이해성;주종남
    • 한국정밀공학회지
    • /
    • 제21권10호
    • /
    • pp.50-56
    • /
    • 2004
  • Finishing is the final process in molds manufacturing and consumes much process time. Also, it influences on surface quality of molds. But, there are few systematic methods to control the process. In this work, basic experiments were carried out to study the machining characteristics of the finishing tools. From the experiments, critical surface roughness and wear coefficient are suggested to reduce the number of finishing steps and to plan a systematic finishing procedure. Comparison experiments were carried out between the expert's method and the new method, which is based on the results of this research. From the experiments, it is verified that the systematic method takes less time and generates less form error in the machined surface than the worker's method.

BIM을 활용한 작업공간 확보 방안에 관한 연구 (A Study on the Secure method of Construction Workspace by using Building Information Modeling)

  • 송동현;이상범;송호산
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.9-10
    • /
    • 2011
  • Domestic construction industry suffered from the IMF and makes a great effort to improve in 'cost management', 'strengthening the competitiveness of the construction industry'. Therefore, the industry has become interested in improving the productivity of construction and ongoing research is being progressed in various angles. In such circumstances, the needs for a study of concepts and space of the actual construction work place is emerging. This study were utilized BIM to understand the types and causes of problems in space during the finishing work in construction and categorize importance and frequency of occurence through a survey of experts and AHP to analyze the realtive effects of importance then modeling to them to aware of issues and give direction for efficient management. This study is anylize the problem which is caused by same time process in finishing work progress of apartment applied by BIM. and categorize the type of work interference management in finishing work, and anylize by the type of occurence then predict the work interference management through in BIM 3D VIEW and suggest the solutions.

  • PDF

런아웃의 양에 따른 잔류 부피의 변화 (Remaining volume after smoothing(RVAS) variation according to runout)

  • 김민태;이해성;제성욱;주종남
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2005년도 춘계학술대회 논문집
    • /
    • pp.1248-1252
    • /
    • 2005
  • Mold-manufacturing process consists of machining and finishing process that are strongly related in each other. But there are few studies about mold-manufacturing process to control those two processes simultaneously. Especially, runout distorts the machined surface from expected so it changes the finishing process and mold-manufacturing time. In this work, basic analyses and experiments were carried out to study RVAS variation according to runout in HSM. To perform those analyses, firstly surface generation analysis was done including runout in ball end milling and then the RVAS that could relate machining and finishing process was proposed. And the optimal finishing process in HSM according to RVAS was also proposed. Through experiment runout occurrence and above analyses were verified.

  • PDF