• Title/Summary/Keyword: Field construction

Search Result 5,497, Processing Time 0.045 seconds

Development of Robotic Inspection System over Bridge Superstructure (교량 상판 하부 안전점검 로봇개발)

  • Nam Soon-Sung;Jang Jung-Whan;Yang Kyung-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.180-185
    • /
    • 2003
  • The increase of traffic over a bridge has been emerged as one of the most severe problems in view of bridge maintenance, since the load effect caused by the vehicle passage over the bridge has brought out a long-term damage to bridge structure, and it is nearly impossible to maintain operational serviceability of bridge to user's satisfactory level without any concern on bridge maintenance at the phase of completion. Moreover, bridge maintenance operation should be performed by regular inspection over the bridge to prevent structural malfunction or unexpected accidents front breaking out by monitoring on cracks or deformations during service. Therefore, technical breakthrough related to this uninterested field of bridge maintenance leading the public to the turning point of recognition is desperately needed. This study has the aim of development on automated inspection system to lower surface of bridge superstructures to replace the conventional system of bridge inspection with the naked eye, where the monitoring staff is directly on board to refractive or other type of maintenance .vehicles, with which it is expected that we can solve the problems essentially where the results of inspection are varied to change with subjective manlier from monitoring staff, increase stabilities in safety during the inspection, and make contribution to construct data base by providing objective and quantitative data and materials through image processing method over data captured by cameras. By this system it is also expected that objective estimation over the right time of maintenance and reinforcement work will lead enormous decrease in maintenance cost.

  • PDF

A Study on Visitor Satisfaction for Bukhansan Dulegil (북한산 둘레길 이용객 만족도에 관한 연구)

  • Cho, Woo-Hyun;Yun, Hui-Jae;Im, Seung-Bin
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.4
    • /
    • pp.60-73
    • /
    • 2011
  • Since Jeju Ollegil opened in September 2007 and attracted the sensation of popularity throughout the country, the interest in 'Walking Trails' has increased, and the central ministries and the local governments composite and assign various 'Walking Trails'. Walking trails are not tours on which people go to see one spot and move to another spot by vehicle, but a long linear journey that leads people to see, to feel and to experience a region's landscape and culture while walking on the trail. 'Walking Trails' are efficient routes to discover and to use a former way and to link the various ecological regions' histories and cultural resources, so it is most important to select a route. Although the routes were selected by considering the various planning factors and giving each route a specified theme, some problems like the inconvenience of visitors caused by lack of facilities have occurred. After designation and construction of the trails, they were not properly evaluated by visitors. Therefore, it is the purpose of this study to suggest a better way to construct the trails by surveying visitor satisfaction and by analyzing the impact of planning a route on visitor satisfaction at Bukhansan Dulegil which was completed. For this study, with a questionnaire based on the literature review to identify the important planning factors for selecting a route, a survey was conducted on visitor satisfaction for each section and their intention to revisit and to recommend that trail. Based on the characteristics of each section that was identified in the field research, the trails were classified into five types and satisfaction of each type and each type was analyzed. In addition, analyzing the impact of planning factors on satisfaction, the impact of satisfaction on revisiting and recommending and visitors' perception of the theme, further improvement for better construction of the trail was presented. Satisfaction of sectors with strong natural elements was higher; 'walking comfort' was the highest planning factor affecting satisfaction. In addition, satisfaction was surveyed to have high influence on revisiting and recommending.

Methodology of Selecting Criteria for Pedestrian only Street (차없는 거리 선정기준 수립을 위한 방법론 정립 연구)

  • Kim, Yoomi;Park, Jejin;Lee, Junyoung;Ha, Taejun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.867-879
    • /
    • 2016
  • Since the 1970s, the region of its own pedestrian center and environmental pollution caused by exhaust gases have been reduced gradually in a continuous increase of the vehicle, school route the central business district, around the school, the sidewalk where the vehicle do not pass, facilities of minimum for the safety of pedestrians and systematic management of an area where an unspecified number and alleys impassable is insufficient. Recently, in response to the "Law for convenience enhancing safety and walking" is enforced in Korea, research on Pedestrian only Street has been actively about the government, the standard for calculating the weights of evaluation associated with it. it is a actuality, however, there are insufficient, evaluation for business promotion is being conducted evaluation polite manner by using, for example, scale residence time and purpose of the passengers as there is no car that has been carried out on a voluntary basis through the municipality have. In this study, by suggesting a method for the selection of the street without a car, make a survey by placing a purpose in the selection method presentation of the street with no car to be construction future, was researching. F.G.I (Focus Group Interview) survey, professors, staff in urban, traffic field of experts in order to present the weights for the evaluation of the Pedestrian only Street by using the evaluation index by type of Pedestrian only Street, was interviewed about the evaluation index for the conducted for professionals engaged in the engineering company, and randomly selected 200 peoples, weighted evaluation of the street with Pedestrian only Street was proposed. By classifying the items purpose and goals of the evaluation type by this by applying the weight, and present the weight of the detailed indicators each corresponding to each item, and scored on the basis of the result, in this paper it can be so that one methodology for the selection standard for the construction as Pedestrian only Street, and the weight of the evaluation of the type that has been derived, the selection and evaluation methods and then added to these criteria to settle careful study of the reference should be performed further.

Development of a Failure Probability Model based on Operation Data of Thermal Piping Network in District Heating System (지역난방 열배관망 운영데이터 기반의 파손확률 모델 개발)

  • Kim, Hyoung Seok;Kim, Gye Beom;Kim, Lae Hyun
    • Korean Chemical Engineering Research
    • /
    • v.55 no.3
    • /
    • pp.322-331
    • /
    • 2017
  • District heating was first introduced in Korea in 1985. As the service life of the underground thermal piping network has increased for more than 30 years, the maintenance of the underground thermal pipe has become an important issue. A variety of complex technologies are required for periodic inspection and operation management for the maintenance of the aged thermal piping network. Especially, it is required to develop a model that can be used for decision making in order to derive optimal maintenance and replacement point from the economic viewpoint in the field. In this study, the analysis was carried out based on the repair history and accident data at the operation of the thermal pipe network of five districts in the Korea District Heating Corporation. A failure probability model was developed by introducing statistical techniques of qualitative analysis and binomial logistic regression analysis. As a result of qualitative analysis of maintenance history and accident data, the most important cause of pipeline damage was construction erosion, corrosion of pipe and bad material accounted for about 82%. In the statistical model analysis, by setting the separation point of the classification to 0.25, the accuracy of the thermal pipe breakage and non-breakage classification improved to 73.5%. In order to establish the failure probability model, the fitness of the model was verified through the Hosmer and Lemeshow test, the independent test of the independent variables, and the Chi-Square test of the model. According to the results of analysis of the risk of thermal pipe network damage, the highest probability of failure was analyzed as the thermal pipeline constructed by the F construction company in the reducer pipe of less than 250mm, which is more than 10 years on the Seoul area motorway in winter. The results of this study can be used to prioritize maintenance, preventive inspection, and replacement of thermal piping systems. In addition, it will be possible to reduce the frequency of thermal pipeline damage and to use it more aggressively to manage thermal piping network by establishing and coping with accident prevention plan in advance such as inspection and maintenance.

Field Survey on the Maintenance Status of Greenhouses in Korea (온실의 유지관리 실태조사 분석)

  • Choi, Man Kwon;Yun, Sung Wook;Kim, Hyeon Tae;Lee, Si Young;Yoon, Yong Cheol
    • Journal of Bio-Environment Control
    • /
    • v.23 no.2
    • /
    • pp.148-157
    • /
    • 2014
  • The purpose of this study was to investigate greenhouse maintenance by farms by looking into greenhouses across the nation for greenhouse specification, disaster-resistance greenhouse construction, types and degree of damage due to natural disasters, pre-inspection in case of typhoon or heavy snow forecast, and fire-fighting facilities to prevent a fire. The findings were summarized as follows: as for greenhouse specification, the highest proportion of them were 90 m or longer both in single- and multi-span greenhouses in terms of length; 8 m or wider and 7.0~7.9 m in single- and multi-span greenhouses, respectively, in terms of width; 1.5~1.9 m and 2.0~2.9 m in single-and multi-span greenhouses, respectively, in terms of height; and 3.0~3.9 m and 6 m in single- and multi-span greenhouses, respectively, in terms of diameter. As for disaster-resistance greenhouses, farmers were reluctant to install such greenhouses. The low distribution of disaster-resistance greenhouses was attributed to the greenhouses built dependent on the old practice, the greenhouses already completed, and relatively high construction costs. As for damage by natural disasters, greenhouses were subject to more damage by typhoons than heavy snow. They mainly inspected the ceiling and side windows, entrances, and fixation bands for covering materials in case of typhoon forecast and the heating devices in case of heavy snow forecast. As for repair methods for greenhouse pipe corrosion, they preferred partial replacement to painting and did not use stiffeners for structures to prevent a natural disaster in most cases. As for the maintenance of greenhouse covering materials, most farmers inspected their sealing property but did not clean the coverings for light transmission. The destruction of structural materials can be prevented by eliminating greenhouse covering materials during a typhoon, but they were not able to do so because of the covering material replacement costs and the crops they were growing. The study also examined whether greenhouse farms had fire-fighting facilities to prevent a fire and found that they lacked the perception of greenhouse fire prevention to a great degree.

Variations of Soil Bulk Density and Natural Revegetation on the Logging Road of Timber Harvested-Sites (벌채적지(伐採跡地) 운재로(運材路)의 토양가밀도(土壤假密度) 변화(變化)와 자연식생회복(自然植生回復)에 관한 연구(硏究))

  • Woo, Bo-Myeong;Park, Jae-Hyeon;Kim, Kyung-Hoon
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.4
    • /
    • pp.545-555
    • /
    • 1994
  • The objective of the study was to provide the useful scientific data on the early rehabilitation of the legging road after timber harvesting in the forest area. This study was carried out at logging roads which were constructed during 1989 and 1994 in Mt. Baekwoon. The field survey was conducted in July, 1991. Judging from the analysis of soil bulk density, time required for recovery as the undisturbed forest soil condition was more than 10 years in the road which was left, and the regression equation is as follows, $$Y_1=1.4195-0.0744{\cdot}X(R^2=0.91)$$ $$Y_2=1.4673-0.0688{\cdot}X(R^2=0.73)$$ (X : elapsed year after road construction. $Y_1$, $Y_2$ : soil bulk density($g/cm^3$) at 0~7.5cm, and 7.5~15.0cm, respectively) Especially soil bulk density with buffer strip-woods was $0.890-0.903g/cm^3$, so it was 20% lower than that of logging road surface without buffer strip-woods. Among the 7 factors, location, sand content, and soil hardness had statistically significant effect on the soil bulk density in logging road surface. The pioneer species on logging road surface were Rhus cratargifolius, Prunus chinensis, and Lespedeza cyrtobotrya, etc. in woody species, and Pteridium aquilinum, Arundinella hirta, and Lysimachia clethroides, etc. in herb species. So, in process of year, average plant coverage were 70% on cutting and banking slope and 20% on logging road surface which elapsed 6 years after logging road construction. Through this research, buffer strip-woods must be remained for environmental conservation of forest conditions, and from the time to be closed the road, planting, seeding, and grazing works could be effective to the soil condition and vegetation recovery.

  • PDF

A Construction of the C_MDR(Component_MetaData Registry) for the Environment of Exchanging the Component (컴포넌트 유통환경을 위한 컴포넌트 메타데이타 레지스트리 구축 : C_MDR)

  • Song, Chee-Yang;Yim, Sung-Bin;Baik, Doo-Kwon;Kim, Chul-Hong
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.7 no.6
    • /
    • pp.614-629
    • /
    • 2001
  • As the information-intensive society in 21c based on the environment of global internet is promoted, the software is getting more large and complex, and the demand for the software is increasing briskly. So, it becomes an important issue in academic and industrial field to activate reuse by developing and exchanging the standardized component. Currently, the information services as a product type of each company are provided in foreign market place for reusing a commercial component, but the components which are serviced in each market place are different, insufficient and unstandardized. That is, construction for Component Data Registry based on ISO 11179, is not accomplished. Hence, the national government has stepped up the plan for sending out public component at 2001. Therefore, the systems as a tool for sharing and exchange of data, have to support the meta-information of standardized component. In this paper, we will propose the C_MDR system: a tool to register and manage the standardized meta-information, based upon ISO 11179, for the commercialized common component. The purpose of this system is to systemically share and exchange the data in chain of acceleration of reusing the component. So, we will show the platform of specification for the component meta-information, then define the meta-information according to this platform, also represent the meta-information using XML for enhancing the interoperability of information with other system. Moreover, we will show that three-layered expression make modeling to be simple and understandable. The implementation of this system is to construct a prototype system of the component meta-information through the internet on www, this system uses ASP as a development language and RDBMS Oracle for PC. Thus, we may expect the standardization of the exchanged component metadata, and be able to apply to the exchanged reuse tool.

  • PDF

Studies on Effects of Channel Bed Fixation by Erosion Control Dams in Torrential Streams (황폐계류(荒廢溪流)에 있어서 사방시설물(砂防施設物)에 의한 하도고정(河道固定)에 관한 연구(硏究))

  • Chun, Kun Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.79 no.3
    • /
    • pp.269-277
    • /
    • 1990
  • In planning the disaster prevention by the erosion control facilities, it is essential to focus on the microtopography of the channel bed and the chronological process of sedimental movement in the torrential streams. For this purpose, the microtopographical change of the channel bed and the effects of the erosion control facilities in the mountain torrents were analyzed by the experimental channel and the field survey of the torrents where low-dam series had been constructed in the channel. The results of this experiment showed that the effects of construction of the low-dam series on the channel bed fixiation were the prevention of the local scouring in the experimental channel and the expansion of flow channel width and deposit space. The results are summarized as follows : 1. When the low-dam series were constructed over the whole channel bed (L'/L=1), the conning water and the sediment were seperated, simultaneously resulting in deposition of sediment and reduction of the tractive force for the running water. Therefore, the F.A. (Fluctuation area in cross-section: value was decreased to about 65% compared with that of non-work (L'/L=0). 2. The efficiencies of the low-dam series on the channel width were increased with an increment in length of working space. After the construction of low-dam series on the whole channel bed (L'/L=1), flow channel width was increased to about 1.53 times compared with that of non-work (L'/L=0). 3. It needs a deposition area to store the sediment with decrease in tractive force. The low-dam series in the experimental channel widened the deposition area about 2.10 times compared with that of non-work.

  • PDF

Parameters Estimation of Clark Model based on Width Function (폭 함수를 기반으로 한 Clark 모형의 매개변수 추정)

  • Park, Sang Hyun;Kim, Joo-Cheol;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.6
    • /
    • pp.597-611
    • /
    • 2013
  • This paper presents the methodology for construction of time-area curve via the width function and thereby rational estimation of time of concentration and storage coefficient of Clark model within the framework of method of moments. To this end time-area curve is built by rescaling the grid-based width function under the assumption of pure translation and then the analytical expressions for two parameters of Clark model are proposed in terms of method of moments. The methodology in this study based on the analytical expressions mentioned before is compared with both (1) the traditional optimization method of Clark model provided by HEC-1 in which the symmetric time-area curve is used and the difference between observed and simulated hydrographs is minimized (2) and the same optimization method but replacing time-area curve with rescaled width function in respect of peak discharge and time to peak of simulated direct runoff hydrographs and their efficiency coefficient relative to the observed ones. The following points are worth of emphasizing: (1) The optimization method by HEC-1 with rescaled width function among others results in the parameters well reflecting the observed runoff hydrograph with respect to peak discharge coordinates and coefficient of efficiency; (2) For the better application of Clark model it is recommended to use the time-area curve capable of accounting for irregular drainage structure of a river basin such as rescaled width function instead of symmetric time-area curve by HEC-1; (3) Moment-based methodology with rescaled width function developed in this study also gives rise to satisfactory simulation results in terms of peak discharge coordinates and coefficient of efficiency. Especially the mean velocities estimated from this method, characterizing the translation effect of time-area curve, are well consistent with the field surveying results for the points of interest in this study; (4) It is confirmed that the moment-based methodology could be an effective tool for quantitative assessment of translation and storage effects of natural river basin; (5) The runoff hydrographs simulated by the moment-based methodology tend to be more right skewed relative to the observed ones and have lower peaks. It is inferred that this is due to consideration of only one mean velocity in the parameter estimation. Further research is required to combine the hydrodynamic heterogeneity between hillslope and channel network into the construction of time-area curve.

A Study on the Estimation Measure of Delay Cost on Work Zone Using the Traffic Flow Model (교통류 모형을 이용한 도로 점용공사 구간의 지체비용 산정방안)

  • Kim, Yunsik;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.120-129
    • /
    • 2016
  • The user cost is an important analysis item which should be considered together with life-cycle of facility, administrator cost and discount rate in LCCA for efficient asset management of SOC facilities. Especially, a significant delay cost occurs often for users in the road field due to a work zone for cleaning and maintenance, and in such case, the administrator should consider the administrator cost as well as the user cost for more rational decision making. However, the user cost has not been considered in most decision making steps until recently and relevant studies also have not been carried out actively. In this study, the methodology to estimate the user cost and delay cost required in the decision making step using the traffic flow model and the direct benefit estimation model in the traffic facility investment evaluation guideline is suggested. And, the traffic flow model was estimated on 4 national highway sections where maintenance was actually carried out in 2014 using VISSIM and, the user cost and the delay cost were estimated based on the suggested methodology. The analysis result showed that the average user cost of $17,569,000KRW/km{\times}day$ occurred on Section A with approximately 30,000 AADT before a work zone occurred, and in case the first lane was blocked for maintenance, the delay cost of $10,193,000KRW/km{\times}day$ (158%) on average occurred additionally. The delay cost of $1,507,000KRW/km{\times}day$ (115%) and $1,985,000KRW/km{\times}day$ (119%) occurred on Sections B and D with approximately 20,000 AADT respectively and the delay cost of $262,000KRW/km{\times}day$ (105%) occurred on Section C with approximately 10,000 AADT. This result of this study was estimated based on the simulation of traffic flow model so that there is a limitation in its actual application. A study ot develop a highly appropriate model using actual observation data and improve the possibility to apply it through the verification using the simulation will be necessary in future.