• Title/Summary/Keyword: Feasibility evaluation

Search Result 1,433, Processing Time 0.032 seconds

Analysis of Influencing Item of Green Building Certification;Focused on Energy Part of Commercial Buildings (친환경 인증 사업타당성 영향요인 분석;업무용건축물의 에너지 평가부문을 중심으로)

  • Kook, Dong-Hoon;Kim, Ah-Yung;Han, Kap-Kyu;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.431-435
    • /
    • 2007
  • Green Building Certification Program, which was first introduced to residential buildings in Korea in 2002, has been put on track. This program is expected to bring about the effect in the economic viewpoint that was based on a life-cycle-cost analysis, not to mention the environmental viewpoint. However, given the fact that the existing model for feasibility analysis focusing on early investment cost can hardly be applicable to the green buildings because of lacking the life-cycle-cost reduction factor, it remains still difficult to conduct an objective evaluation. The study thus was intended to identify the factors that should be additionally considered in conducting the feasibility study to be implemented through the analysis of the certification items of green buildings as a preliminary study in structuring the evaluation model for feasibility analysis of green buildings.

  • PDF

Decision technique for accommodation facilities of multi-utility tunnel in basic planning phase (기본 계획 단계에서의 공동구 수용시설물 결정 기법)

  • Oh, Won-Joon;Jin, Kyu-Nam;Kang, Yeong-Ku;Cho, Choong-Yeun;Sim, Young-Jong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.79-92
    • /
    • 2019
  • In this paper, we propose a method to determine whether to install the accommodation facility of the multi-utility tunnel more effectively in the basic planning phase, and to set up an evaluation system to determine the configuration and kind of accommodation facility. For the configuration of the accommodation facility, 98 alternatives were analyzed for 7 accommodation facility. For the evaluation system of the accommodation facility, index related to feasibility and economic in basic planning phase were selected. The evaluation system classified as spatial, effective, and cost evaluation was presented reflecting the selected index, and AHP analysis was performed for weight setting. The results of this study will be helpful for users including designers to shorten the time and increase the efficiency in the process of determining accommodation facility of the multi-utility tunnel in basic planning phase.

A Study on Meta Analysis of Preliminary Feasibility for Government R&D Programs to Improve Planning Project of the Government Funded Research Institutes (정부출연연구기관 주요사업 연구기획 강화를 위한 예비타당성조사 사업 메타분석연구)

  • Lee, Jong-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.445-453
    • /
    • 2017
  • The Korean government's recent R&D policy has focused on encouraging government-funded research institutes (GRIs) to develop mid-term, long-term, and large-scale R&D projects. It is necessary to prepare thoroughly for the new R&D strategy, but there is no systematic accumulation of planning expertise, and there has been continued demand for good examples of research planning. Therefore, this study analyzes the reports of preliminary feasibility for government R&D programs through a meta-analysis of detailed evaluation items and contents to help researchers enhance their project-planning ability. The evaluation items that can be applied to R&D planning for GRI were reviewed, and twelve detailed evaluation items were selected through content analysis. The results of this study could contribute to practical R&D project planning and the improvement of evaluations.

Abstraction of the Definition of Engineering Design Ability and its Subdivision and Element by the Survey of Experts' Recognition (전문가 인식 조사에 의한 공학 설계 능력의 정의 및 하위 영역과 요소 도출)

  • Kim, Taehoon
    • Journal of Engineering Education Research
    • /
    • v.18 no.3
    • /
    • pp.24-32
    • /
    • 2015
  • The purpose of this research is to consider theoretical points of view on a preceding research related to an engineering design and abstract the definition of engineering design ability, its subdivision and element on the basis of experts' recognition. To achieve this goal, various literature researches were carried out by examining domestic and foreign articles in journals, lots of dissertations, and books related to engineering design through theoretical consideration. And to secure the validity on the definition of engineering design ability, its subdivision and element through the theoretical study, a feasibility evaluation method by the experts was applied. And the feasibility evaluation of the experts was conducted through 2 stages. The major conclusions of this study are as follows. Firstly, based on the experts' recognition on the definition of engineering design ability, its subdivision and element, which were revised through the 1st feasibility evaluation and then utilized in the 2st one, the validity was confirmed, and the subdivisions of the engineering design ability were divided into 5 and the elements of the subdivision ability were 33. Secondly, the engineering design ability was defined as "the one to design a realizable product with consumers' demand fully satisfying, based on a knowledge application ability, thinking ability, communication ability, problem-solving ability, and teamwork ability to solve engineering problems." Thirdly, the subdivisions of the engineering design ability were divided as a knowledge application ability, thinking ability, communication ability, problem-solving ability, and teamwork ability.

A Study on the Procedures and Application Examples for Establishment of Master Plan Standard for the Utility Tunnel (공동구 기본계획 기준수립을 위한 절차 및 적용사례에 대한 연구)

  • Oh, Wonjoon;Cho, Choongyeun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.100-107
    • /
    • 2020
  • In this paper, a study was conducted on the method of establishing the master plan standard for rational decision-making about utility tunnel construction in the existing urban. In the previous study, the optimal route was selected by the feasibility assessment. However, in order to increase the objectivity of the installation conditions of the utility tunnel in the master plan standard, comprehensive evaluation of the results by feasibility and economics analysis calculates the overall ranking for all sections analyzed. In addition, based on the results of the comprehensive evaluation, a method for establishing a mid·long term investment plan was introduced after reviewing the project to be conducted in the region. Additionally, in order to review the establishment of the standard suggested in the paper, an analysis was conducted by applying the master plan procedure to the northwestern urban zone of seoul.

Some Considerations of the Evaluation and Its Analysis on tile Profitability of the Investment Project. -On the Calculation and Analysis of IRR in Casting Facilities- (투자사업의 수익성 평가 및 분석에 관한 소고 -주물시설에 대한 IRR를 중심으로-)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.53-62
    • /
    • 1979
  • A widely accepted indicator of a project's economic potential is the internal rate of return (IRR). The primary objective of feasibility analysis for any project is to measure the economic potential for the project, normally defined as the expected return on capital investment. The analysis should be designed to determine whether a project is technically and economically sound, and under what conditions. Therefore, there are factors other than economic potential that must be taken into account in the reasonable composition of an investment program. These kinds of factors can be given proper consideration in project selection after the economic feasibility of alternative projects has been determined. The primary reason for having to choose among different projects is that capital resources are scare : the investment budget is limited. The case project, casting facilities investment project, treated in this paper were selected for their value in illustrating the methods of feasibility analysis. This case project an actual potential project and is analyzed on the basis of the best available data for the specific conditions for that project.

  • PDF

A Feasibility Study on In-Vessel Core Debris Cooling through Lower Cavity Flooding

  • Yang, Soo-Hyung;Baek, Won-Pil;Chang, Soon-Heung
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 1996.11a
    • /
    • pp.309-314
    • /
    • 1996
  • Feasibility study has been accomplished to evaluate the effectiveness of the in-vessel core debris cooling through lower cavity flooding using two dimensional finite difference scheme. The volume of cerium pool and decay power rate generated in corium pool were evaluated as important parameters to the temperature distribution on the reactor vessel lower head through previous works. In this study, the corium volume based on the System 80+ core structure and time dependent decay power rate are considered for feasibility evaluation. In addition, preliminary plans for the in-vessel core debris cooling through lower cavity flooding as severe accident management strategy, i.e. flooding timing, method and capacity, are suggested based on the result of the numerical study, international tendency related to in-vessel core debris cooling through lower cavity flooding.

  • PDF

Evaluation of Air Quality and Site Feasibility for the Construction of the Incineration Facilities in Won Ju City (원주시 소각시설의 입지와 주변지역의 대기질예측에 관한 연구 - 입지여건의 평가를 중심으로)

  • 송동웅;김기현
    • Journal of Environmental Science International
    • /
    • v.9 no.1
    • /
    • pp.65-74
    • /
    • 2000
  • In this study, we investigated the site feasibility for the construction of the incineration facilities in Won Ju City. To assess the environmental impact of its construction, we examined the current status of air quality in the selected candidate sites and predicted the extent of air quality change upon its operation through modification of stack type. If the stack height is assumed to be 70 m, the concentrations of $SO_2$ and dioxin in the surrounding area were predicted to increase by 0.05 ppb and 0.09 pg/$m^3$, respectively. The impact of its operation was assessed and compared among different sites. According to this analysis, more impact was expected from the residential area for the Dan-Gye site than from agricultural areas of the Kwan-Sul and Sa-Je site.

  • PDF

Study on feasibility analysis for ground source heat pump system using the building foundation (건물기초 이용 지열시스템의 도입 타당성 분석에 관한 연구)

  • Chae, Ho-Byung;Nam, Yujin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.155-157
    • /
    • 2013
  • Ground source heat pump(GSHP) systems have been attracted as high-efficient energy-saving technology, but the building clients and designers have hesitated to use GSHP systems which is a expensive initial installation and a uncertain economic feasibility. Therefore In order to reduce the initial cost, many researchers have focused on the energy-pile system using the structure of the building as a heat exchanger. Even though many of experimental studies for energy pile system have been conducted, there was not enough data of a quantitative evaluation with the economic analysis and comprehensive analysis for energy-pile. In this study, the feasibility study for the energy pile system with a barrette pile was conducted by the performance analysis and LCC assessment.

  • PDF

EVALUATING THE FEASIBILITY OF THE HIGHWAY ENGINEERING SCHEDULE USING SIMULATION TECHNIQUE

  • Liu Weijun;Yuan Jianbo;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.897-901
    • /
    • 2005
  • In the highway engineering, the performance, quantity and status of machines available for the project have direct impact on the project time. For instance, the status of machines, such as working or in trouble, have great influence on the activity execution. Therefore, while scheduling the project, the project manager always increases the spare machines or prolong the activity time to avoid delaying the project time when some of the machines are in trouble in construction site. However, how many are the spare machines and how long are the prolonged activity time, which are estimated subjectively by the manager. This subjective estimation has been criticized for systematically overestimating or underestimating quantity of the machines and the activity time. In the paper, we propose and prototype a model to simulate the status of the machines in construction site, and then to evaluate the schedule feasibility considering the performance, quantity and statues of the machines involved.

  • PDF