• 제목/요약/키워드: Failure Period

검색결과 1,379건 처리시간 0.026초

응급수리를 고려한 정기보전정책의 비용분석 (Cost Analysis for Periodic Maintenance Policy with Minimal Repair)

  • 김재중;김원중
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.139-146
    • /
    • 1995
  • This study is concerned with cost analysis in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Minimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a spate until the periodic time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to maintenance period and scale parameter of failure distribution. Total cost factors ate included operating, fixed, minimal repair, periodic maintenance and replacement cost Numerical example is shown in which failure time of system has erlang distribution.

  • PDF

빈맥을 이용한 심부전 모델에서 회복궤도 (Recovery Trajectory in Tachycardia Induced Heart Failure Model)

  • 오중환;박승일;원준호;김은기;이종국
    • Journal of Chest Surgery
    • /
    • 제32권5호
    • /
    • pp.422-427
    • /
    • 1999
  • 배경: 빈맥을 이용하여 심부전을 만드는 방법은 확장성 심근증 모델 중에서 가장 좋은 방법으로 심장에 외과적 손상 혹은 약물의 독성을 최소화할 수 있고 사람의 심부전에 가장 가까우며 조작하기 쉬운 장점이 있다. 새로운 술식의 효과를 검증하기 위하여 심부전이 진행중인 모델에서 동물실험을 시행하는 것은 결과를 얻기 전에 실패할 가능성이 높다. 심부전의 진행을 중지시킨 회복궤도의 변화를 비교하는 방법은 심부전 악화에 의한 사망률을 줄일 수 있는 새로운 방법이지만 빈맥 조작 기술에 따라 저자마다 상당한 차이가 있어 이에대한 자료의 정립이 필요한 실정이다. 대상 및 방법: 21마리의 개(체중 25-35kg)를 대상으로 1)정상의 심장, 2) 심부전 심장, 3) 회복기 4주 4) 회복기 8주 등 4가지로 나누었다. 전신마취하에 우심실첨부에 박동기 전극을 삽입하여 빈맥은 처음 170회/분부터 매주 20회씩 프로그래머를 이용하여 증가시켰다. 4주 후 심부전이 발생하면 8주간의 회복기 동안 회복 궤도를 추적하였다. 심장의 크기와 혈역학적 변화를 관찰하고자 초음파는 2주마다, Swan-Ganz 도자와 열희석법은 4주마다 검사를 실시하여 이완기 말기 좌심실 체적, 수축기말기 좌심실 체적, 심박출율, 중심정맥압, 폐동맥압, 폐동맥 쐐기압, 우심실압, 일회박출량 등을 측정하였으며, 정상과 심부전 심장 상태에서 혈중 카테콜라민을 측정하였다. 그 외 심전도 및 대퇴동맥 도자를 넣어 맥박수, 혈압을 측정하였다. 정상심장, 심부전 심장, 회복기 4주 및 8주에서 측정한 값은 평균$\pm$표준편차로 표시하였다. 결과: 4마리(20%)가 심부전에 의한 합병증으로 사망하였다. 이완기 말기 좌심실 체적은 측정시기에 따라 40.8$\pm$7.4, 82.1$\pm$21.1, 59.9$\pm$7.7, 46.5$\pm$6.5ml로 수축기말기 좌심실 체적과 비슷한 변화양상을 보였으며 심박출율은 50.6$\pm$4.1, 17.5$\pm$5.8, 36.3$\pm$7.3, 41.5$\pm$2.4%였다. 혈압과 맥박은 의의 있는 양상을 보이지 않았으며 중심정맥압, 우심실압, 폐동맥압, 폐동맥 쐐기압 등은 심부전 시에 의의 있는 증가를 보이다가 회복기에는 감소하는 양상을 볼 수 있다. 일회박출량은 21.5$\pm$8.2, 12.3$\pm$3.5, 17.9$\pm$4.6, 15.5$\pm$3.4ml으로 회복기에 심부전 상태로부터 회복하는 경향을 볼 수 있었다. 혈중 카테콜라민은 정상 133.3$\pm$60.0pg/dL에서 심부전 시에는 479.4$\pm$327.3pg/dL로 증가를 보였다(p=0.008). 결론: 빈맥을 이용한 심부전 모델은 외과적손상이 적고, 병의 정도를 임의로 조절할 수 할 수 있는 간편한 방법이다. 회복기에는 심기능 및 심장비대가 회복하는 경향을 보이므로 향후 새로운 술식의 평가를 위하여 회복 궤도를 이용하는 경우 실험 동물의 심부전 악화에 의한 사망율을 줄일 수 있는 새로운 방법이다.

  • PDF

신뢰도 기반 발전플랜트 정비를 위한 고장 데이터베이스 구축 방법 (Failure Data Base for Reliability-Based Maintenance for a Power Plant)

  • 김명배;김태훈;김현철;임신영
    • 플랜트 저널
    • /
    • 제12권2호
    • /
    • pp.31-35
    • /
    • 2016
  • 본 연구에서는 발전 플랜트의 보일러 급수 펌프를 대상으로 신뢰도 기반 정비를 적용하기 위한 고장 데이터 관리에 관한 방법에 대하여 논의하였다. OREDA와 같은 고장 데이터베이스에서 중요한 구성 요소인 고장모드, 고장원인, 고장영향, 고장의 심각도를 분석하는 것이 신뢰도 기반 정비에서 중요한 부분이다. 정비주기와 같이 예방 정비 계획을 세울 때 중요한 부분은 고장 데이터의 통계적 처리로부터 결정될 수 있음을 확인하였다.

  • PDF

경사식 방파제의 비용 최적화에 기초한 부분안전계수 및 목표파괴확률 산정 (Estimation of Partial Safety Factors and Target Failure Probability Based on Cost Optimization of Rubble Mound Breakwaters)

  • 김승우;서경덕
    • 한국해안·해양공학회논문집
    • /
    • 제22권3호
    • /
    • pp.191-201
    • /
    • 2010
  • 방파제는 인명 피해의 우려가 적은 구조물이기 때문에 주로 비용 최적화를 고려하여 설계한다. 하지만 대부분의 국내 방파제는 비용최적설계를 고려하지 않았다. 본 연구에서는 비용최적설계를 국내의 경사식 방파제에 적용하여 최적설계중량과 목표파괴확률 그리고 부분안전계수를 산정하였다. 사용한 방법은 PIANC Working Group 47의 Hans F. Burcharth and John D. Sorensen에 의해 개발된 것이다. 최적재현기간은 많은 경우에 50년으로 계산되었고 실질이자율이 높을 경우에 100년으로도 계산되었다. 최적재현기간에 해당하는 파괴확률과 기존 구조물의 신뢰성 해석에서 얻은 파괴확률을 사용하여 목표파괴확률을 제안하였다. 국내 설계기준인 초기한계상태의 최종적인 목표파괴확률은 약 60%이며 이에 상응하는 전체안전계수는 1.09이다. 이는 현행 설계법보다 9% 큰 공칭직경과 30% 큰 설계중량을 요구한다. 또한 비용최적설계를 고려한 부분안전계수를 산정하여 비용을 고려하지 않는 Level 2의 부분안전계수와 비교하였고 목표파괴확률이 40% 미만일 때 두 방법이 비교적 잘 일치함을 보였다.

濕地 堆積物의 花粉組成과 無機質含量으로 본 東北 日本의 後氷期 四面崩壞 履歷 (Recurrence History of Slope Failure during the Holocene in Northeastern Japan)

  • 박지훈
    • 한국제4기학회지
    • /
    • 제18권1호통권22호
    • /
    • pp.31-39
    • /
    • 2004
  • 東北 日本의 후빙기 사면붕괴 이력을 복원하기 위하여 3지역(川통盆地, 茂庭, 高田濕原, 根白石濕原)의 습지 퇴적물의 화분조성과 무기질함량을 대상으로 安定-不安定 曲線 그래프(이하 S-U曲線)와 灼熱減量 曲線 그래프(이하 IL曲線)를 작성하였다. 그 결과, S-U曲線에 의하면 사면붕괴 발생빈도가 높은 시기는 川통盆地에서는 약 5,600~4,670yrB.P.의 1회, 茂庭 $\cdot$ 高田濕原에서는 약 6,390~5,070yrB.P.와 약 4,750~3,800yrB.P.의 2회, 根白石濕原에서는 약 6,630~6,070yrB.P., 약 5,890~5,360yrB.P. 및 약 5,000~4,650yrB.P.의 3회가 확인되었다. 그리고 IL曲線에 의하면 사면붕괴 발생빈도가 높은 시기는 川통盆地에서는 약 5,600~5,140yrB.P.의 1회, 茂庭 $\cdot$ 高田濕原에서는 약 6,390~6,170yrB.P.와 약 4,750~2,840yrB.P.의 2회가 확인되었다. 이와같은 분석결과는 선행연구에서 조사지역의 지형 $\cdot$지질단면도로부터 추정된 결과와 매우 유사한 경향을 나타내는 것으로 판명되었다.

  • PDF

남해 연안의 홍도에서 집단 번식하는 괭이갈매기의 한배 알 수와 번식 성공률 (Clutch Size and Breeding Success of Black-tailed Gulls (Larus crassirostris) at Hongdo Island, Southeast Coast of South Korea)

  • 권영수;이후승;유정칠
    • Ocean and Polar Research
    • /
    • 제28권2호
    • /
    • pp.201-207
    • /
    • 2006
  • We studied variation in clutch size, hatching, fledging and breeding success of the Black-tailed Gull (larus crassirostris) at Hongdo Island, which supported the largest breeding colony of the species, in South Korea in 1997 and 2000 to 2003. Cluck size was recorded in 1,388 nests and breeding success was estimated in 83 nests. Mean clutch size was 1.89 t 0.65. A total of 63.9% of the eggs hatched and 53.5% of the chicks survived until fledged. Breeding success was 34.2%. Causes of breeding failure were eggs missing (14.9%), rotten eggs (15.5%) and predation (2.4%) during the incubation period and chicks missing(35.8%), starvation (7.4%) and pecked chicks (3.2%) during the chick rearing period. In 2002, the main causes of breeding failure were eggs missing (17.2%) and rotten eggs (6.9%) during the incubation period and missing chicks (15.5%), starvation (3.5%) and pecked chicks (6.9%) during the chick rearing period. Most chick mortality occurred within three days after hatching.

철도차량의 신뢰성기반 유지보수(RCM) 실시 방안 (A Study on Implementation of RCM for Railway Vehicle)

  • 박병노;주해진;이창환;임성수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1487-1493
    • /
    • 2008
  • Railway vehicle is very important to implement the effective maintenance in proper to prevent any failure during operation period. Many railway authorities are making efforts to maintain the railway vehicle through scientific and systematic procedure. To achieve this, Reliability Centered Maintenance(RCM) is partially applied. The efficiency of RCM has proven and its terminology was familiar with nuclear power, military and chemical plant etc. since the commercial aircraft's industries has introduced the maintenance program based on the target of reliability. The application of RCM on railway vehicle can be utilized with systematic analysis method to select the best effective maintenance period and action to prevent the failures by selecting the equipment affecting the its safety and reliability. This paper is presented that the procedure of adequate and effective maintenance for railway vehicle by comparing among the related standards in example IEC60300-3,11, MIL-STD-2173, and technical documents or papers. In accordance with above result, RCM procedure is proposed to apply effectively for maintenance of railway vehicle. That is, (1) Analysis of data and Calculation of criticality per equipment (2) Selection of equipment to analyze (3) Analysis of failure mode and effect (4) Evaluation of maintenance method and period (5) Optimization of maintenance program through renewal of maintenance method and period.

  • PDF

Economic-based approach for predicting optimal water pipe renewal period based on risk and failure rate

  • Kim, Kibum;Seo, Jeewon;Hyung, Jinseok;Kim, Taehyeon;Kim, Jaehag;Koo, Jayong
    • Environmental Engineering Research
    • /
    • 제24권1호
    • /
    • pp.63-73
    • /
    • 2019
  • This study suggests a method for calculating the benefits of water pipe renewal based on an estimate of the water supply suspension risk. The proposed method based on five benefit items is more direct and specific than other benefit estimation methods. In addition, a methodology evaluating the economics of pipe renewal based on pipe failure rate is proposed for estimating the optimal renewal point from an economic perspective. By estimating the optimal renewal period based on a yearly benefit cost ratio per pipe in a case study area, it was possible to draft an optimal renewal plan for the subject region from an economic perspective. Compared with other methodologies, a reasonable optimal renewal period was derived from an economic point of view. The result of this study may be used to develop future water pipe renewal plans. Moreover, the proposed methodologies and results derived from this study can be applied to asset management plans.

갑상선 수술에서 수술 중 신경 감시의 효용성: 학습곡선을 중심으로 (Efficacy of Intraoperative Neural Monitoring (IONM) in Thyroid Surgery: the Learning Curve)

  • 곽민규;이송재;송창면;지용배;태경
    • International journal of thyroidology
    • /
    • 제11권2호
    • /
    • pp.130-136
    • /
    • 2018
  • Background and Objectives: Intraoperative neural monitoring (IONM) of recurrent laryngeal nerve (RLN) in thyroid surgery has been employed worldwide to identify and preserve the nerve as an adjunct to visual identification. The aims of this study was to evaluate the efficacy of IONM and difficulties in the learning curve. Materials and Methods: We studied 63 patients who underwent thyroidectomy with IONM during last 2 years. The standard IONM procedure was performed using NIM 3.0 or C2 Nerve Monitoring System. Patients were divided into two chronological groups based on the success rate of IONM (33 cases in the early period and 30 cases in the late period), and the outcomes were compared between the two groups. Results: Of 63 patients, 32 underwent total thyroidectomy and 31 thyroid lobectomy. Failure of IONM occurred in 9 cases: 8 cases in the early period and 1 case in the late period. Loss of signal occurred in 8 nerves of 82 nerves at risk. The positive predictive value increased from 16.7% in the early period to 50% in the late period. The mean amplitude of the late period was higher than that of the early period (p<0.001). Conclusion: IONM in thyroid surgery is effective to preserve the RLN and to predict postoperative nerve function. However, failure of IONM and high false positive rate can occur in the learning curve, and the learning curve was about 30 cases based on the results of this study.

태풍에 의한 절개면 붕괴특성 연구 및 경사도 설계기준 검토 (Characteristics of Slope Failure induced by Typhoon and an Examination of a Standard Slope Inclination for Design)

  • 구호본;백용;권오일
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.117-122
    • /
    • 2003
  • Every year in domestic slope failure caused by rainfall is happening frequently. Specially, causable failure accident by localized downpour accompanied when summer rainy season period and produces typhoon gets damage of large scale human life and property. Failure happened at slope of 121 places ranged whole country national highway by No.15 typhoon Rusa that strike whole country during 3 days from August 30, 2002. Slope failure that happen by typhoon are judged for major cause to effect of ground saturation and surface water by localized downpour. In this research, failure characteristic was analyzed to target 20 places attaining site investigation among failure slope. As a result, erosions by surface water was construed for major cause of failure and judged for direct relation in failure slope weathering and topography Also, result that analyze inclination of failure part, in the case of ripping rock, inclination of failure side is forming Incline of the lowest 40$^{\circ}$, because surface failure of depth 4m on or so scale happened, it is require that regulating plan gently design standard inclination of weathered rock and soil layer And it is considered that desirable preparation of design standard about measure that help smooth drainage of surface water and can restrain percolation in ground to reduce failure damage by rainfall.

  • PDF