The structural stability of a simple-typed cultivation facility with a width of 5.6 m for growing Pleurotus ostreatus was analyzed by modeling the facility as three-dimensional steel frames. The computation was done by using the finite element analysis program, ANSYS and the criterion of determining structural stability was based on the allowable stress design (ASD). The computational results showed that the structure with a straight-typed bed column was more stable than those with other types of bed columns against snow depth but there was little difference against wind velocity. As results, the interval of rafter had a more influence on safety wind velocity than that of bed column, while the interval of bed column was more important to safety snow depth. Finally the bed column against buckling was stable in all cases considered in this paper.
Journal of The Korean Society of Agricultural Engineers
/
v.60
no.2
/
pp.103-110
/
2018
Most of the intake facilities of small agricultural reservoirs are conduits and they are regarded as serious defects due to the structural weakness that penetrates the body of the dam, and countermeasures are needed. This study suggests the application method of siphon type water intake facility by hydraulic model test and physical scale model test of siphon type water intake facility which has high safety and easy maintenance. Experimental results show that sufficient flow rate can be secured for the purpose of intaking water according to the differential head between the reservoir and the discharge part, and the flow rate can be controlled by the valve. The negative pressure was -31.5 kPa, and vibration and noise did not occur during the operation of the siphon. The maximum flow velocity in the discharge outlet was 1.11 m/s which meets the criterion for irrigation canals. Therefore, scour risk would be very low. As a result of the inflow distribution experiment, even if the inflow part is separated by only about 0.8 m, the flow velocity is remarkably decreased, so that the clogging by debris would not appear. When the pump was operated only once for the first time and the inside of the siphon was filled with water, continuous operation was possible by only valve operation. The results of this study are expected to be used for the design guidelines of the water intake facilities and improve safety and maintenance convenience of agricultural reservoirs.
The Journal of Sustainable Design and Educational Environment Research
/
v.18
no.4
/
pp.7-20
/
2019
The purpose of this study is to present the direction of faculty's perception and direction of spatial composition to apply universal design principles to the space of kindergarten facilities. Based on previous research and literature review on kindergarten area, kindergarten facility space, and universal design, the universal design principle which was applied to the composition of kindergarten amenities derived four types of functional supportability, receptivity, accessibility and safety. In addition, the survey was conducted on kindergarten teachers and teacher assistants and the managers of kindergarten. As a result of the awareness of kindergarten facilities space, we have discovered the degree of universal design awareness.
The Chemical Control Act of 2015 was enhanced to ensure the safe management of hazardous chemicals. In particular, there have been substantial changes in the standards for the installation and management of handling facilities for manufacturing and storing hazardous chemicals. However, some standards for handling facilities are difficult to implement due to a lack of physical space or because of safety accidents during facility improvements. Therefore, the Safety assessment system (SAS) has been operating for such facilities since 2018. This study developed a leakage trajectory evaluation module that can easily evaluate the outside of a dike for safety evaluation. We analyzed two case studies on a dike for hydrochloric acid and sulfuric acid storage tanks with this module and suggest a reasonable plan for the facility. We believe that it will be possible to more easily submit SAS reports at chemical plants by using this evaluation module. This study is expected to contribute to the improvement of the safety design of hazardous chemical handling facilities.
Park, Choon-Hwa;Kim, Hyun-Sub;Jeon, Byeong-Han;Kim, Duk-Hyun
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.4
/
pp.132-137
/
2018
Although the number of chemical accidents has been declining since the Chemical Control Act of 2015, there have been repeated occurrences of similar types of accidents at printed circuit board (PCB) manufacturing facilities. These accidents were caused by the overflow of hydrochloric acid and hydrogen peroxide, which are toxic chemicals used in the printed circuit board manufacturing process. An analysis of the $Cl^-$ content to identify the cause of the accident showed that in the mixed route of hydrochloric acid and hydrogen peroxide, which are accidental substances, the $Cl^-$ concentration was 66.85 ppm in the hydrogen peroxide sample. Through reaction experiments, it was confirmed that the deformation of a PVC storage tank and generation of chlorine gas, which is a toxic gas, occurred due to reaction heat occurring up to $50.5^{\circ}C$. This paper proposes a facility safety management plan, including overcharge, overflow prevention, leak detection device, and separation tank design for mixing prevention in printed circuit board manufacturing facility etch process. To prevent the recurrence of accidents of the same type, the necessity of a periodic facility safety inspection and strengthening of the safety education of workers was discussed.
Journal of The Korea Institute of Healthcare Architecture
/
v.27
no.4
/
pp.51-60
/
2021
Purpose: Tuberculosis(TB) care unit in public health center should be carefully considered to be re-designed as an infection safety environment for both patient and healthcare workers. So, for the enhancement, this study analyses the facility requirements for co-using the screening clinic as a TB and other respiratory disease care unit. Methods: Not only screening clinic facility guidelines from "A Study for Standard Triage Design and Construction Document" but also the guidelines of TB care and related medical facility are reviewed; KDCA, CDC, ECDC and WHO as a TB care, and FGI and NHS for facility. The facility requirements are summarized space, approach, and mechanical requirement in order. By comparing the summary and screening clinic facility guidelines, supplementations are proposed for TB care unit setting. Results: The result of this study shows that both the space program and mechanical requirement of the screening clinic and that of TB care unit are almost identical and could be share, which include direct airflow or negative air pressure in an exam room. To increase functional and economical efficiency, however, it is necessary to consider a multi-functional negative pressured room, So care process may be re-designed based on a room type; face-to-face room or glass wall inbetween. Implications: The facility guidelines for TB care unit of a public health center should be developed to build a safe environment for infection control by reflecting its medical plan and budget.
The existing raised pavement marker, however, have some limitations. Most of them are square-shaped which makes only forward and backward retro-reflection, their orientation can be easily changed by impact of vehicle, and the surface reflector can be readily contaminated leading poor functioning. In addition, maintenance for broken raised pavement marker is not easy. The purpose of the study is to design and manufacture a new and improved type of raised pavement marker. The new raised pavement marker has round-shaped upper structure. Its body was separated from the holder and the reflector was surrounded by acrylic cover. We tested performances of the constituent parts, optimum load after installation, and reflection efficiency. The new raised pavement marker will be an initiation of studies on the improvement of the shape and performance of raised pavement markers.
The public relations room of the waste disposal facility is a space that can be visited by a large number of unevaluated personnel. Therefore, it is essential to design against fire, and research on fire and evacuation is essential. In this study, in order to evaluate the safety of the occupants in the event of fire and evacuation based on the life safety standards of occupants, the increase in risk due to heat, visible distance, and toxic gases on a plane 1.8m from the floor, which is the limit of breathing of the evacuee, over time. It was analyzed by location. As a result, the RSET of the P-01 exit was 93.0 seconds and the ASET was 272.6 seconds, the RSET of the P-02 exit was 45.8 seconds, the ASET was 147.7 seconds, the RSET of the P-03 exit was 106 seconds, and the ASET was 182.9 seconds.
Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
/
v.18
no.spc
/
pp.63-74
/
2020
The operational safety assessment is an important part of a safety case for the deep geological repository of spent fuels. It consists of different stages such as the identification of initiating events, event tree analysis, fault tree analysis, and evaluation of exposure doses to the public and radiation workers. This study develops a probabilistic safety assessment method for the operational safety assessment and establishes an assessment framework. For the event and fault tree analyses, we propose the advanced information management system for probabilistic safety assessment (AIMS-PSA Manager). In addition, we propose the Radiological Safety Analysis Computer (RSAC) program to evaluate exposure doses to the public and radiation workers. Furthermore, we check the applicability of the assessment framework with respect to drop accidents of a spent fuel assembly arising out of crane failure, at the surface facility of the KRS+ (KAERI Reference disposal System for SNFs). The methods and tools established through this study can be used for the development of a safety case for the KRS+ system as well as for the design modification and the operational safety assessment of the KRS+ system.
Korean Journal of Construction Engineering and Management
/
v.19
no.6
/
pp.34-45
/
2018
Nuclear power plant(NPP) is a large-sacle national infrastructure with total project cost of 77 billion dollars and period of 10 years or more. Moreover, since it is operated over 60 years, NPP is a facility closely related to national economy and public safety. Therefore, accurate information and consistent physical configuration should be maintained to enable accurate and economical decision making in NPP project process such as design, construction, operation, and decommission. Since NPP industry is more complicate and regulated than other industries, the importance of configuration management(CM) has been widely recognized in the early days. However, there were limitations in implementing systematic CM due to unclear purpose and subject. Therefore, this paper suggests a room-based database for CM in NPP reflects design requirements and facility configuration information.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.