• Title/Summary/Keyword: Facility design and construction

Search Result 493, Processing Time 0.028 seconds

The inspection and seismic design method of electrical facility instated in the building (건축물에 시설되는 수변전설비 내진설계 및 검사 방법에 관한 연구)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Kang, Min-Hee;Bae, Suk-Myong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.332-335
    • /
    • 2009
  • Incase of not considered seismic design at transformer vault which is made of many informant electrical facility, facility is damaged, electrical fire breaks out and second damage is able to break out at generating earthquake. But seismic design yet is not applied to at transformer vault in the country. Regard to seismic design method of electrical facility installed in the building internal, we present the seismic design of electrical facility using "Building construction design standard" in internal and "Manual of seismic design and construction for Building Electrical facility" in japan. This paper will be used detail seismic design of pipe and facility. reliability inspection plan for seismic design and construction of electrical facility

  • PDF

A Study of CM(Construction Management) application method for exhibition facilities. (전시시설 건립을 위한 CM 적용방법에 관한 연구)

  • 문종승;임채진
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2001.05a
    • /
    • pp.39-44
    • /
    • 2001
  • An instance of domestic exhibition facility building case, the shortage of managing personal in construction resulted serious issue on expenses, times, quality, and safty with no satisfaction on its process and result. According to subject's speciality the CM's application methods are varied and because of its speciality, overall process of building an exhibition facility operating by its owner. This study intends to exam a application possibility of CM on exhibition facility construction to make smooth communication among varied area that following to exhibition facility construction.

  • PDF

ACCURACY IMPROVEMENT OF AN APPROXIMATE COST ESTIMATING MODEL FOR RIVER FACILITY CONSTRUCTION

  • Siwook Lee;Sungkwon Woo;Jeongyoon Lee;Inwook Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1201-1208
    • /
    • 2009
  • A making a decision of construction cost has important meaning and function for both contractor and owner in construction projects. Especially, it should be premised that estimating the construction cost in efficient and rational way in public construction, which is invested by government funds, for efficient execution of the budget and investment as a side of government. The systematic methodology for estimating construction cost approximately of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. On this study, It collect and analyze a river facility construction historical cost data for develop an approximate cost estimating model for river applied by typical embankment section method and rate application of the others activity type. And it verify suitability of model through a that result of application of real river facility construction statement at developed model. By this study, it is expected to reasonable and systematic estimating construction cost through application of developed model.

  • PDF

The global standard realizing process of the Tire Production Facility and Process Line

  • Suzuki, Takeshi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.28-29
    • /
    • 2015
  • The tire production facility is a large-scale construction with the complexity of a manufacturing process. The process utilities should be wide-ranging as an effective arrangement of them is highly important. All the necessary information should be clarified together with the manufacturer at the basic planning stage, and this design should be developed to comply with the local culture and regulations. It is important to carry out more advanced engineering in terms of process, cost and quality, even if it is difficult to standardize due to the cultural and geographical conditions and regulations. The key point is to reflect all the given conditions and make a clear design during the design stage, to eliminate the problems after the construction has begun. Another key point is the delivery system, which must be totally managed from the initial design stage until the construction stage by proven companies. Flexibility, quick action, and single responsibility will be the fundamental features in all the steps of the project.

  • PDF

The Application and Seismic Design Method of Electrical Facility Installed in the Building (건축물에 시설되는 수변전설비의 내진설계 검토사항 및 설계 방안에 대한 고찰)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Bae, Suk-Myong;Cho, Sung-Gook
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.8
    • /
    • pp.74-79
    • /
    • 2009
  • In the case of that not considered seismic design at transformer vault which is equipped with many important electrical facilities, the facility is damaged, electrical fire breaks out and another damage may be caused due to earthquake. But seismic design has not yet applied to transformer vault in the country. Regard to seismic design method of electrical facility installed inside the building, the seismic design procedures for electrical facility is presented in this parer, which has been developed by referring "Building design standard" of domestic code and "Manual of seismic design and construction for building electrical facility" in japan. This paper may help engineers perform detail seismic design, construction and reliability inspection of electrical pipes and facilities.

AR system for FAB construction management using BIM data under fast track condition (패스트트랙 환경에서 FAB신축을 지원하는 BIM기반 AR 시스템 개발)

  • Lee, Sang-Won;Lee, Kwang-Soo;Choi, Sung-In;Ryu, Seong-Chan;Park, Jung-Seo
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.1-18
    • /
    • 2022
  • New Fabrication Facility (FAB) construction is performed with Building Information Modeling (BIM) based design. The BIM design data keep updated during the FAB construction. To improve fast-track construction management, a Fabrication Facility Augmented Reality (FABAR) was developed. This study introduces a FABAR system development process and shows performance evaluation results of the FABAR prototype system. The FABAR is implemented with three major modules: Augmented Reality (AR) visualization unit (Room-box) to transfer big BIM data to AR data, AR registration and tracking unit to match AR with real scape and to keep AR coordination in real, and AR data management unit to enhance usability. The prototype performance results were as follows: visualization of design BIM data via AR within 24 hours, precise AR registration and tracking registration, and appropriate usability to support FAB construction management at site. The results indicate that the FABAR is applicable for FAB construction management. Especially, the BIM data transformation method using Room-box in this study signifies a new construction management approach using fluctuating BIM design data in the fast track construction condition.

The problem of using BIM data for facility management (시설물 유지관리를 위한 BIM데이터 전달의 문제점)

  • An, Hyo-Kyung;Lee, Seul-Ki;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

The Plan on the Seismic Design of Electrical Facility Installed in the Building (건축물에 시설되는 수변전설비 내진설계 방안)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Bae, Suk-Myong;Cho, Sung-Gook
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.2
    • /
    • pp.89-95
    • /
    • 2009
  • Recently life and properties damage at Japan and China by generating earthquake. So earthquake generation trend and damage in the earthquake risk, and these are a growing interest in domestic. This paper analyzes domestic site and problems of earthquake measures for electrical facility at transformer vault which supply the power the emergence situation at generating earthquake. Also we present the seismic design of electrical facility using "Building construction design standard" in internal and "Manual of seismic design and construction for Building Electrical facility" in japan. This paper will be used detail seismic design of pipe and facility, reliability inspection plan for seismic design and construction of electrical facility.

AN ASSESSMENT SYSTEM OF ECO-FRIENDLINESS OF CONSTRUCTED FACILITY IN THE DESIGN PHASE USING VALUE ENGINEERING

  • Byung-Soo, Kim;Dong-Eun, Lee;Suk-Hyun, Kwon;Min-Kwon, Choe
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1625-1629
    • /
    • 2009
  • The new paradigm called 'Low Carbon Green Growth' involved in reducing greenhouse gas is on the rise as a critical issue worldwide. The essential of Kyoto protocol issued in 1997 is to achieve the sustainable economic growth environments by converting existing production system to eco-friendly one. The protocol imposes the liability to reduce greenhouse gas to the countries joined to it. The paradigm is directly involved in the energy consumption and environmental pollution caused by construction activities. Value Engineering which are mainly applied in the design phase in practice is a measure to improve the value of a constructed facility by analyzing and/or appraising the functions and costs of it. However, an appropriate method which assesses eco-friendliness of constructed facility has not been propose by researchers. This paper proposes a method which assesses the performance involved in eco-friendliness of constructed facility using Value Engineering (VE) in the design phase. The method estimates the environmental cost relative to the amounts of energy consumption and environmental pollution occurred over the entire project life cycle. The database called "Life Cycle Inventory DB", which stores information about the amounts of environmental pollution, is used. The algorithm which retrieves the amounts of environmental pollutions from the DB and converts them into environmental costs is developed. The algorithm is implemented into a system which quantifies the eco-friendliness of constructed facility in the design phase using VE.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF