Access to public facilities such as substations, dams and railway facilities is strictly controlled, and unmanned surveillance equipment has been introduced and operated recently due to the development of IT technology and the government's cost reduction policy. However, if an unmanned surveillance system is broken, surveillance space, information leakage caused by intruders, and damage to facilities may occur. Also, it is necessary to check periodical visit by the manager in order to check the surveillance facilities, which causes additional management costs. In order to solve this problem, we designed a system to check the operation status of the unmanned monitoring facility in real time, attempt to recover automatically when a problem occurs, and notify the administrator of the problem. The designed system consists of an NVR that receives and judges information such as image, sound, and lighting condition, and a control device that detects and restores the state of the unmanned monitoring facility. The system proposed in this paper is expected to contribute to the improvement of the economic efficiency due to the minimization of surveillance space due to the failure of the unmanned monitoring facility and the reduction of the inspection cost.
Purpose: While it is very important to maintain facilities recently, the introduction and its application of high technology in the facility maintenance industry has increased. It is necessary for high technology to secure reliability through the verification and certification system of diagnostic equipment to have an effective impact in the field, but there is difference between the industry's perspective and realistic level of technology apart from social demand for the system of the system. This paper dealt with the introduction of a verification and certification system for rational facility diagnostic equipment with the opinion survey on managers about the current situation. Method: Survey is carried out targeting managers in the maintenance and construction regarding the necessity and urgency of introducing a verification and certification system to promote the introduction and its application of high technology of diagnostic equipment and facility inspection. Also, the introduction to a verification and certification system was reviewed for advanced facility diagnostic equipment through foreign research about similar systems and comparative analysis of similar systems related to the certification of 21 domestic equipment. Result: It showed that, regarding the application of high technology, it is necessary for most managers to introduce high technology such as drones, robots, etc., in the maintenance industry, and when high technology is introduced, it will have a considerable effect in the field. On the other hand, the current technology level in Korea is relatively low, so it turned out to take a certain amount of time for the application of technology. Also, it was found that the management of reliable facility diagnostic equipment will be possible through the introduction of the verification and certification system for facility diagnosis equipment. Meanwhile, the survey is conducted on similar systems about foreign and domestic diagnosis and measuring equipment, etc., but there is no system to verify and certify equipment applied with high technology directly to facility diagnosis maintenance. However, because Japan has a system of verifying the performance of diagnostic equipment and South Korea has 21 similar inspection and diagnostic equipment certification systems among 186 certification systems, it is considered to be possible to design systems which utilize them. Conclusion: According to the managers' opinion, it seems that the introduction of the system supporting the application of 4th industrial technology for the equipment and the use of the equipment with high reliability has sufficient validity. However, because our high technology level is undervalued compared to the urgency, the system for checking high technology facilities and certifying diagnostic equipment should be to be implemented in form of escalation considering technical use and verification level. Apart from the introduction of the verification and certification system, it is necessary for special investment, support and efforts to promote advanced facility diagnostic equipment.
Seoul Metro railway facilities' inspection and maintenance tasks cause failure analysis, but if there is trouble the diverse cause investigation and the systematic analysis and management among broken facilities, related facilities and components fell short and the conditions are different. And, excess and insufficiency, under inspection and maintenance, is being raised regardless of the introduction year and the operating environment including the number of use by applying the same facilities in the uniform inspection cycle. In this study, we will analysis systematically facility system information, failures, operational status, performance, fault and maintenance information resulting from the maintenance management of railway facilities and derive the relationship between associated equipment and its components. In addition, optimizing the inspection and the maintenance cycles of railway facilities, we will improve the reliability of operation. Considering the probability of risk, it is possible to predict the occurrence of accidents or faults and to minimize the frequency of breakdown by pre-inspection maintenance. Finally, This paper is to introduce the content of constructing the Seoul Metro RCM-based failure analysis system for railway facilities to support the optimal continuance of operation status of equipments and the securement of the safe operation of vehicles.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2009.10a
/
pp.429-434
/
2009
In this paper it was written about the safety management plan for underground power transmission cable, and it guarantees the reliable electric power supply and facility management to prevent an electric disasters according to that. Recently fires which happens on OF Cable lead to a breakdown of power system and cause a power outage of wide area and serious social problems. So it needs an improvement of inspection ability on OF cable as well as a strict inspection system to prevent that problems in advance and it will bring us the development of electric safety management and the reliable electric power supply.
Kim, Dong-Kyu;Cho, Sung-Ho;Park, Seoung-Soo;Yoo, Hui-Ryong;Park, Yong-Woo
Journal of Mechanical Science and Technology
/
v.17
no.5
/
pp.629-636
/
2003
This paper introduces the developed geometry PIG (Pipeline Inspection Gauge), one of several ILI (In-Line Inspection) tools, which provide a full picture of the pipeline from only single pass, and has compact size of the electronic device with not only low power consumption but also rapid response of sensors such as calipers, IMU and odometer. This tool is equipped with the several sensor systems. Caliper sensors measure the pipeline internal diameter, ovality and dent size and shape with high accuracy. The IMU (Inertial Measurement Unit) measures the precise trajectory of the PIG during its traverse of the pipeline. The IMU also provide three-dimensional coordination in space from measurement of inertial acceleration and angular rate. Three odometers mounted on the PIG body provide the distance moved along the line and instantaneous velocity during the PIG run. The datum measured by the sensor systems are stored in on-board solid state memory and magnetic tape devices. There is an electromagnetic transmitter at the back end of the tool, the transmitter enables the inspection operators to keep tracking the tool while it travels through the pipeline. An experiment was fulfilled in pull-rig facility and was adopted from Incheon LT (LNG Terminal) to Namdong GS (Governor Station) line, 13 km length.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.39
no.3
/
pp.179-186
/
2021
In general, the daily safety inspection activities, which investigate damages in structures and measures the size of the damage, have been relied heavily on the visual inspection so far. Since the probe of the condition and performance of facilities by such personnel is often dependent on the subjective judgment of the investigator, the consistency and repeatability of the probing results may reduce. Particularly, damage located in a difficult-to-reach place depends mainly on experience with the naked eye, and an unsafe method using a ladder has mainly applied when necessary. Therefore, in this study, we tried to propose a way of using images that can reduce the deviation between safety inspection investigators, enhance objectivity, and improve the safety of workers. In this study, we have applied homographic transformation as a method of correcting the image. As a result of analyzing the size of the damage in the corrected image of the test subject, it confirms that the accuracy of measuring the magnitude of the damage can satisfy the target levels of 5.0mm and 0.005m2, the target accuracy levels. As a result of the field verification test to which the proposed image correction technique applied, the coefficient of variation of the crack length in the structure decreased from 5.4~7.0% to 0.072~0.12%, and that of the damaged area from 10.9% to 1.6%. It confirms that the measurement accuracy is improved. Therefore, it is expected that this study on the image utilization technique in safety inspection activities can increase the accuracy of damage measurement and improve the reliability of the safety inspection reports and exterior survey drawings.
The Journal of the Korea institute of electronic communication sciences
/
v.7
no.5
/
pp.1145-1151
/
2012
Recently, the demand for mobile system is growing owing to the spread of smart phones to enable the real-time business process. This paper proposes the real-time facility maintenance management system using an android-based mobile application to apply to the facility defect/maintenance field for the apartment building complex. The proposed system model aims to develop the comprehensive management system to integrate the web and mobile system to lead to the realization of mobile office. The security measures required in the mobile system are technically analyzed and implemented on the system.
The design of underwater inspection robot system is presented. This robot system is designed for wall inspection in the nuclear plant facility. This paper describes the major components of the robot and its structures. This robot system is consisted of three parts : mechanical electrical and sensing pail. The main problem of designing mechanical part is to select the mechanism of driving. In this system the propeller driving mechanism is selected which can be move the robot continuously. For reducing the size of robot, we designed the CPU and motor controller board. The sensor system is consisted of two parts. One is environment monitoring part and the other is robot localization system.
As the rapid growth of Industrial society, many enterprises are inclined to ppm management from the traditional$3\'{o}$ management method. Therefore it is need to extend process capability index for guarantee of quality assurance level to ppm unit. Thus, in this paper, using the probability of standard normal distribution from $ 3\'{o}; to; 6\'{o}$ which was developed by Song(1997), the capability index which is proposed considers the numbers of inspection facility and quality assurance level. Also, quality assurance level is determined by considering the precision of inspection when one and two sided specification limits are given for the probability which is out of the specification limit.
The objectives of the on-the-spot inspection in Honam district are to find out the situation of the damages on facilities and the reason of the damages caused by heavy snow, and to suggest the preventive plan for reducing the damages from the future heavy snow. From the results of the on-the-spot inspection, plastic houses, barns and ginseng cultivation facilities are mainly damaged by heavy snow in the Honam district, and the importance of the future heavy snow preparedness measures is highly recognized in an agricultural district. In this research, 4 kinds of alternative proposals for the heavy snow are suggested.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.