• Title/Summary/Keyword: FMSS

Search Result 42, Processing Time 0.023 seconds

해난사고 분석을 위한 Full-mission Shiphandling Simulator(FMSS)시연

  • Lee, Dong-Seop;Gang, Jeong-Gu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.06a
    • /
    • pp.87-88
    • /
    • 2011
  • 다기능 선박조종시뮬레이터(Full-mission Shiphandling Simulator)를 이용한 사고분석 방법을 한국해양수산연수원이 보유한 DNV(Det Norske Veritas)선급에서 "Integrated Simulator System, NAUT AW(SIM), DYNPOS-AUT(SIM), HSC, TUG, ICE" Class로 인정하고, STCW 협약 Regulation I/12를 충족한 Russia TRANSAS사의 "NAVI-TRAINER PROFESSIONAL 5000 NTPRO 5000" Full-mission Shiphandling Simulator를 이용하여 시행하였다.

  • PDF

해난사고 분석을 위한 Full-mission Shiphandling Simulator(FMSS) - 한국해양수산연수원 FMSS를 기준으로 -

  • Lee, Dong-Seop
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.06a
    • /
    • pp.71-73
    • /
    • 2011
  • 다기능 선박조종시뮬레이터(Full-mission Shiphandling Simulator)는 항해사, 선장 및 도선사의 자질 향상을 위한 교육뿐만 아니라 항만개발을 위한 사전 검토와 해난사고 발생 시, 원인규명을 위한 분석에도 이용되고 있다. 한국해양수산연수원에서는 이러한 목적을 위하여 2011년 2월 28일 Russia Transas 제품의 선박조종시뮬레이터를 설치 완료 하였다. 이 FMSS는 적어도 360도의 수평시각을 가진 대형 구형화면에 여섯(6) 자유도 운동을 하는 본선 및 타선을 실시간으로 표현하는 photo-realistic high resolution computer graphic visual system과 같은 최신기술을 사용하는 가장 현대화된 최고급 해상용 시뮬레이터로 해난 사고 윈인규명을 위한 분석 연구 목적을 위하여 광범위한 출처로부터 모델시험과 자료의 신뢰할만한 공식적 기록들에 근거한 매우 정확한 수력학적 선박 모델링 소프트웨어로 이루어졌다. 여기서는 이 FMSS의 형태와 복잡성을 상세하게 소개한다.

  • PDF

Parts Processing Route and Economic Design in Flexible Manufacturing Systems employing AGVs for Transport (무인 반송시스템을 이용하는 유연 제조시스템에서 작업경로와 경제적 설계)

  • 장석화
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.46
    • /
    • pp.19-32
    • /
    • 1998
  • This paper addresses the processing route of parts and economic design in flexible manufacturing systems (FMSs) employing AGVs for Transport. Parts are processed through several workstations according to operation sequences. The machine of each workstation can do multiple operation functions. The operation stage of a part can be processed in several workstations, which are non-identical in functional performance. The objective of this paper is to determine the processing route of parts, number of machines at each workstation, number of vehicles. The model is assumed that the operation stage of parts can be processed at the only one among several available workstations. Parts are transported by automated guided vehicle system(AGVS). The decision criteria is to minimize the sum of processing cost, travel cost, operating cost. A model formulation is represented. A solution algorithm is suggested by using mathematical programming and simulation technique, and a numerical example is shown.

  • PDF

Network-type Cell Layout in Cellular Flexible Assembly Systems (셀형유연조립시스템에서의 네트웍형 셀배치)

  • 노인규;최형호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.39
    • /
    • pp.63-73
    • /
    • 1996
  • With the success of flexible manufacturing systems (FMSs), flexible assembly systems (FASs) have been developed to automate factories further. As in a cellular FMS, a cellular FAS is considered as the most flexible and feasible assembly system configuration Because of the differences between manufacturing and assembly operation, the logic of cell formation and cell layout between a FMS and a FAS is not the same. Since the time for assembly operation is usually relatively short, the transfer time is thus very crucial for the performance of assembly systems. Therefore in assembly systems it is important to reduce the transfer time by sequencing operations efficiently and arranging machines like the sequences. The network-type layout is not only feasible for the machine arrangement based on operation sequences, but it has also layout flexibility. Therefore it is a reasonable layout configuration for cellular FASs. This paper presents a method for the cell layout based on the network-type layout in a cellular FAS design.

  • PDF

Vessel and Navigation Modeling and Simulation based on DEVS Formalism : Design for Navigation Simulation Architecture with Modeling for Critical Systems and Agents of Vessel (DEVS 형식론 기반의 선박 항해 모델링 및 시뮬레이션 (I) : 항해 시뮬레이션 아키텍처 설계와 선박 핵심 장비 및 에이전트 모델링)

  • Woo, Sang-Min;Lee, Jang-Se;Hwang, Hun-Gyu
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.23 no.9
    • /
    • pp.1038-1048
    • /
    • 2019
  • Recently, various systems have been developed to support ship navigation safety. In order to verify the usefulness of such a system, it is most ideal to try it on a real vessel, but there are many difficulties. As an alternative, usability verification methods applied with modelling and simulation (M&S) techniques are required such as FMSS, which is closest to reality, is very expansive to construct, and there needs the specialized operator. For this reason, this paper proposes a method to verify the navigation safety support system by modeling and simulation techniques based on the Discrete Event System Specification (DEVS) formalism. As a first step, we designed the navigation simulation architecture based on the SES/MB framework, and details on modelling ship core equipment and navigator agents based on the DEVS. Through this, we are able to implement the navigation simulation system for vessels, and evaluate the effectiveness of navigation safety support elements such as collision avoidance, etc. using developed scenarios.

Dynamic manufacturing scheduling using multi-agent-system in FMS (유연생산 시스템에서의 에이전트를 이용한 동적 작업배정규칙 할당에 관한 연구)

  • Kim, Seung-Ho;Choi, Hoe-Ryeon;Lee, Hong-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3232-3238
    • /
    • 2010
  • As flexible manufacturing systems (FMSs) are highly automated and required flexibility to satisfy market need, dispatching rules are constrained by specific environments of manufacturing systems such as mechanical failures, absence of employees, and lack of spare parts. In this paper, an ontology-based knowledge approach is proposed to improve efficiency of system through adapting suitable dispatching rules, considering context in a FMS shop floor, which consists multiple manufacturing cells. the multi-agents monitor manufacturing system status and job so that it figures out a dispatching rule considering context. To demonstrate the proposed approach, a proof-of-concept prototype system has been implemented in the $JADE^{TM}$ platform and Protege to make OWL DL ontology.

A Heuristic Algorithm for Tool Loading and Scheduling in a Flexible Manufacturing System with an Automatic Tool Transporter (공구이송이 가능한 유연제조시스템에서의 공구 할당 및 스케쥴링을 위한 발견적 기법)

  • Park, Sang-Sil;Kim, Yeong-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.21 no.1
    • /
    • pp.119-135
    • /
    • 1995
  • We consider problems of tool loading and scheduling in a flexible manufacturing system (FMS) in which tool transportation constitutes the major portion of material flows. In this type of FMSs, parts are initially assigned to machines and released to the machines according to input sequencing rules. Operations for the parts released to the machines are performed by tools initially loaded onto the machines or provided by an automatic tool transport robot when needed. For an efficient operation of such systems, therefore, we may have to consider loading and scheduling problems for tools in addition to those for parts. In this paper, we consider three problems, part loading, tool loading, and tool scheduling problems with the overall objective of minimizing the makespan. The part loading problem is solved by a method similar to that for the bin packing problem and then a heuristic based on the frequency of tool usage is applied for tool loading. Also suggested are part input sequencing and tool scheduling rules. To show the effectiveness of the overall algorithm suggested here, we compare it with an existing algorithm through a series of computational tests on randomly generated test problems.

  • PDF

A Study on Traffic Safety of Ship under Bridge (선박의 교량 통항 만전성에 관한 연구)

  • Yoon Myung Ou;Kim Hyun Jong;Keum Jong Soo;Seong Yu-Chang
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2003.11a
    • /
    • pp.67-73
    • /
    • 2003
  • In these days, several bridges have been built or under construction over navigational channel in Korea In these cases there must be careful consideration for the marine safety of vessels to be passed by below the bridge. This paper aims to analyze the factors influencing maritime traffic safety and to figure out ample width of main span of these kinds of bridges through the reference study and FMSS.

  • PDF

A Study on Traffic Safety Assessment at Pyeongtack Port by Ship handling Simulator (선박조종시뮬레이터를 이용한 평택항 통항 안전성 평가)

  • Kim, Se-Won;Gug, Seung-Gi;Kim, Won-Ouk;Park, Yeong-Su;Jo, Keoung-Min
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.29 no.1
    • /
    • pp.85-93
    • /
    • 2005
  • In order to effective transportation of goods & smooth traffic in west sea area, it is a plan to build Pyeongtaek bridge. Basically ship-handling operators have a mental difficulty and hazardous for navigation under bridge which is constructed across on the fairway. Therefore this study aims to propose the traffic safety assessment of navigation under the bridge by using full mission ship-handling simulator and also investigate the bridge design regulations of certain countries on the fairway.

  • PDF

DEVELOPMENT OF GREEN'S FUNCTION APPROACH CONSIDERING TEMPERATURE-DEPENDENT MATERIAL PROPERTIES AND ITS APPLICATION

  • Ko, Han-Ok;Jhung, Myung Jo;Choi, Jae-Boong
    • Nuclear Engineering and Technology
    • /
    • v.46 no.1
    • /
    • pp.101-108
    • /
    • 2014
  • About 40% of reactors in the world are being operated beyond design life or are approaching the end of their life cycle. During long-term operation, various degradation mechanisms occur. Fatigue caused by alternating operational stresses in terms of temperature or pressure change is an important damage mechanism in continued operation of nuclear power plants. To monitor the fatigue damage of components, Fatigue Monitoring System (FMS) has been installed. Most FMSs have used Green's Function Approach (GFA) to calculate the thermal stresses rapidly. However, if temperature-dependent material properties are used in a detailed FEM, there is a maximum peak stress discrepancy between a conventional GFA and a detailed FEM because constant material properties are used in a conventional method. Therefore, if a conventional method is used in the fatigue evaluation, thermal stresses for various operating cycles may be calculated incorrectly and it may lead to an unreliable estimation. So, in this paper, the modified GFA which can consider temperature-dependent material properties is proposed by using an artificial neural network and weight factor. To verify the proposed method, thermal stresses by the new method are compared with those by FEM. Finally, pros and cons of the new method as well as technical findings from the assessment are discussed.