• 제목/요약/키워드: Expected total cost

검색결과 424건 처리시간 0.03초

시스템의 신뢰도와 수요 반응을 고려한 발전 운영 (Generator Scheduling Considering System's Reliability and Demand Response)

  • 곽형근;김진오
    • 전기학회논문지
    • /
    • 제60권5호
    • /
    • pp.929-935
    • /
    • 2011
  • Customers hardly change to electric prices in old days because electricity is essential commodity, while demand changes with price after deregulation. It's explained by price-based demand response with demand-elasticity matrix. Also all of the customers have had identical demand-price elasticity matrix till now. But in a practical power system, various customers are present with taking a variety of demand-price elasticity. Therefore this paper proposes demand-price sensitivity to represent different demand-price elasticity. Also as proposing demand-reliability sensitivity, it is modeling various customers' characteristics to reliability. And then this paper calculates total expected interruption cost of customer from the customer interruption cost and the demand-reliability sensitivity. A total expected interruption cost of system is shown as opportunity cost of a generation cost.

Optimal Burn-In under Warranty

  • Kim, Kui-Nam J.;Park, Chi-Yeon;Hong, Chan-Geui
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 1999년도 추계학술대회
    • /
    • pp.147-155
    • /
    • 1999
  • This paper discusses an optimal burn-in procedure to minimize total costs based on the assumption that the failure rate pattern follows a bimodal mixed Weibull distribution. The procedure will consider warranty period as a factor of the total expected burn-in cost. A cost model is formulated to find the optimal burn-in time that minimizes the expected burn-in cost. Conditional reliability for warranty period will be discussed. An illustrative example is included to show how to use the cost model in practice.

  • PDF

인공지능기술을 이용한 교량구조물의 생애주기비용분석 모델 (Life Cycle Cost Analysis Models for Bridge Structures using Artificial Intelligence Technologies)

  • 안영기;임정순;이증빈
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제6권4호
    • /
    • pp.189-199
    • /
    • 2002
  • This study is intended to propose a systematic procedure for the development of the conditional assessment based on the safety of structures and the cost effective performance criteria for designing and upgrading of bridge structures. As a result, a set of cost function models for a life cycle cost analysis of bridge structures is proposed and thus the expected total life cycle costs (ETLCC) including initial (design, testing and construction) costs and direct/indirect damage costs considering repair and replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses costs. Also, the optimum safety indices are presented based on the expected total cost minimization function using only three parameters of the failure cost to the initial cost (${\tau}$), the extent of increased initial cost by improvement of safety (${\nu}$) and the order of an initial cost function (n). Through the enough numerical invetigations, we can positively conclude that the proposed optimum design procedure for bridge structures based on the ETLCC will lead to more rational, economical and safer design.

시험 장비의 용량제한을 고려한 무고장 신뢰성 시험의 경제적 설계 (Economic Design of A Zero-Failure Reliability Demonstration Test Considering Capacity Limitation of Test Equipment)

  • 한숙현;윤원영;서순근
    • 품질경영학회지
    • /
    • 제49권3호
    • /
    • pp.341-358
    • /
    • 2021
  • Purpose: After product development, a Reliability Demonstration Test(RDT) is performed to confirm that the target life has been achieved. In the RDT, there are cases where the test equipment cannot accommodate all samples. Therefore, this study considers a test method to most economically demonstrate the target life of the product at a certain confidence level when the sample size is larger than the capacity of the test equipment. Methods: If the sample size is larger than the capacity of the test equipment, test equipments may be added or the test time of individual samples may be increased. So the test method is designed to cover this situation with limited capacity. A zero-failure test method is applied as a test method to RDT. To minimize the cost, the test cost is defined and the cost function is obtained. Finally, we obtain the optimal test plan. Results: A zero-failure test method is designed when the sample size is larger than the capacity of the test equipment, and the expected total cost is derived. In addition, the process of calculating the appropriate sample size, test time, and number of test equipment is illustrated through an example, and the effects of model parameters to the optimal solutions are investigated numerically. Conclusion: In this paper, we study a zero-failure RDT with test equipment that has limited capacity. The expected total cost is derived and the optimal sample size, test time, and number of test equipment are determined to minimize the expected total cost. We also studied numerical examples and for further studies, we can relax some restrictions in the test model and optimize the test method.

기회비용을 고려한 열화시스템의 보전한계갱신정책 (Maintenance Limit Renewal Policy for Inferiority System based on Opportunity Cost)

  • 박상민;김연수
    • 산업경영시스템학회지
    • /
    • 제17권32호
    • /
    • pp.233-242
    • /
    • 1994
  • This study deals with the derivative adverse minimum for inferiority system depends on continuose operating under infinite planning horizon. This planning will be accomplished by maintenance limit renewal policy in consideration of opportunity cost which affects system by failure during operation periods and expected cost under nomal operation states. By the results, we will be expected incresing total efficiency for the system by optimal renewal policy.

  • PDF

최소수리비용이 고장시간의 함수일 때 연장된 보증 정책 (Extended warranty policy when minimal repair cost is a function of failure time)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제23권6호
    • /
    • pp.1195-1202
    • /
    • 2012
  • 본 논문에서는 최소수리의 비용이 시스템의 수명시간에 의존하는 경우에 연장된 보증이 주어진 수리가 가능한 시스템에 대하여 사용자 측면에서의 총기대비용을 구하였다. 이를 위해서 연장된 보증을 정의하고 사용자 측면에서 연장된 보증이 종료된 이후의 교체모형을 가정하였다. 특히, 시스템의 교체모형에서 사용자가 연장된 보증을 선택하기 위한 기준을 제시하였으며, 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 이를 설명하였다.

연장된 보증을 갖는 예방보전모형 (Preventive maintenance model with extended warranty)

  • 정기문
    • Journal of the Korean Data and Information Science Society
    • /
    • 제24권4호
    • /
    • pp.773-781
    • /
    • 2013
  • 최근에 기본 보증이 종료된 이후에 주어지는 시스템의 연장된 보증에 대한 관심이 증가되고 있다. 따라서 본 논문에서는 사용자 측면에서 최소수리보증이 있는 연장된 보증이 종료된 이후의 예방보전모형을 제안하였다. 이 때, 기본 보증과 연장된 보증 하에서 고장이 발생된 시스템에는 판매자에 의해서 무료로 최소수리가 이루어진다. 이러한 제안된 예방보전모형에 대하여 기대순환길이, 총기대비용 그리고 단위시간당 기대비용을 유도하였다. 또한, 유도된 단위시간당 기대비용을 최소화 하는 최적의 예방보전 주기와 예방보전 횟수를 결정하였다. 끝으로 시스템의 고장시간이 와이블 분포를 따를 때 수치적 예를 통하여 이를 설명하였다.

Safer Zone Analysis for Multiple Investment Alternatives on the Total-Cost Unit-Cost Domain

  • Kono, Hirokazu
    • Industrial Engineering and Management Systems
    • /
    • 제11권1호
    • /
    • pp.11-17
    • /
    • 2012
  • Along with the recent trend toward increasing variety and shorter life of products in the market, evaluation of risk for economic investment alternatives is of practical importance in manufacturing companies. This paper assumes that each alternative is composed of demand volume and unit sales price as income factors, and unit variable cost and fixed cost as expense factors. The paper assumes that these four factors move worse from the originally expected values, toward the direction of decreasing profit. Values of these four factors are also assumed to fluctuate from year to year over the entire multi-period. By applying the analysis of the breakeven points to each of the four factors, safer area against these changes is represented on the two dimensional domain called normalized total-cost unit-cost domain. A practical numerical example is analyzed to verify the validity of the proposed method.

도금공정에서 최소기대손실을 위한 목표치의 설정 (Selection of target for the minimum expected loss in plating processes)

  • 박창순;김정준
    • Journal of the Korean Data and Information Science Society
    • /
    • 제21권6호
    • /
    • pp.1051-1060
    • /
    • 2010
  • 도금공정에서는 도금두께의 규격한계는 주어지지만 대부분의 경우 목표치는 주어지지 않는다. 목표치가 주어지지 않았을 때 일반적으로 규격의 중심점이 목표치로 사용된다. 하지만 공정능력치가 크다면 규격의 중심을 목표치로 사용하는 것은 총 손실비용면에서 최선의 선택이 아니다. 이 논문에서는 총 손실비용을 생산비용과 손실함수의 합으로 정의하였고 기대 총 손실비용을 최소화 하는 목표치를 제안하였다. 그리고 그때의 공정능력치의 감소가 미미한 것을 보였다.

협동 최적화 방법을 이용한 강상자형교의 생애주기비용 최적설계 (Optimum Life-Cycle Cost Design of Steel Box Girder Bridges Using Collaborative Optimization)

  • 조효남;민대홍;권우성
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2001년도 가을 학술발표회 논문집
    • /
    • pp.201-210
    • /
    • 2001
  • In this study, large-scale distributed design approach for a life cycle cost (LCC) optimization of steel box girder bridges was implemented. A collaborative optimization approach is one of the multidisciplinary design optimization approaches and it has been proven to be best suited for distributed design environment. The problem of optimum LCC design of steel box girder bridges is formulated as that of minimization of the expected total LCC that consists of initial cost maintenance cost expected retrofit costs for strength, deflection and crack. To discuss the possibility of the application for the collaborative optimization of steel box girder bridges, the results of this algorithm are compared with those of single level algorithm. From the numerical investigations, the collaborative optimization approach proposed in this study may be expected to be new concepts and design methodologies associated with the LCC approach.

  • PDF