• Title/Summary/Keyword: Existing tunnel

Search Result 627, Processing Time 0.028 seconds

Upper and Lower Bound Solutions for Pile-Soil-Tunnel Interaction (한계해석법에 의한 파일-지반-터널 상호작용 해석)

  • Lee Yong-Joo;Shin Jong-Ho
    • 한국터널공학회:학술대회논문집
    • /
    • 2005.04a
    • /
    • pp.77-86
    • /
    • 2005
  • In urban areas, new tunnel construction work is often taking place adjacent to existing piled foundations. In this case, careful assessment for the pile-soil-tunnel interaction is required. However, research on this topic has not been much reported, and currently only limited information is available. In this study, the complex pile-soil-tunnel interaction is investigated using the upper and lower bound methods based on kinematically possible failure mechanism and statically admissible stress field respectively. It is believed that the limit theorem is useful in understanding the complicated interaction behaviour mechanism and applicable to the pile-soil-tunnel interaction problem. The results are compared with numerical analysis. The material deformation patterns and strain data from the FE output are shown to compare well with the equivalent physical model tests. Admissible stress fields and the failure mechanisms are presented and used to develop upper and lower bound solutions to assess minimum support pressures within the tunnel.

  • PDF

Analytical study of the verification of the performance improvement of the strengthening systems for the open cut tunnel (개착식터널의 내진성능보강 효과분석에 대한 해석적 연구)

  • Kim, Ki-Hong;Kwon, Min-Ho;Jang, Young-Do
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.456-461
    • /
    • 2011
  • Recently the design specification has been advanced with preventing earthquake disaster in Korea because of increasing occurrence of large size earthquake. A composite plate with ductile fiber is proposed, which can enhance the performance of built tunnel in both strength and ductility. This study is to focus to verify the effect of strengthening of existing tunnels which is built without earthquake type load scenario, so that it can provide the safety of existing urban subway system against earthquakes.

  • PDF

Experimental investigation of earth pressure on retaining wall and ground settlement subjected to tunneling in confined space

  • Jinyuan Wang;Wenjun Li;Rui Rui;Yuxin Zhai;Qing He
    • Geomechanics and Engineering
    • /
    • v.32 no.2
    • /
    • pp.179-191
    • /
    • 2023
  • To study the influences of tunneling on the earth pressure and ground settlement when the tunnel passes through the adjacent underground retaining structure, 30 two-dimensional model tests were carried out taking into account the ratios of tunnel excavation depth (H) to lateral width (w), excavation width (B), and excavation distance using a custom-made test device and an analogical soil. Tunnel crossing adjacent existing retaining structure (TCE) and tunnel crossing adjacent newly-built retaining structure (TCN) were simulated and the earth pressure variations and ground settlement distribution during excavation were analyzed. For TCE condition, the earth pressure increments, maximum ground settlement and the curvature of the ground settlement curve are negatively related to H/B, but positively related to H/s and H/w. For TCN condition, most trends are consistent with TCE except that the earth pressure increments and the curvature of ground settlement curve are negatively related to H/w. The maximum ground settlement is larger than that observed in tunnel crossing the existing underground structure. This study provides an assessment basis for the design and construction under confined space conditions.

A Study for Tunnel Management System Development Using a Tunnel Scanner (터널 스캐너를 이용한 터널 유지관리시스템 개발에 관한 연구)

  • Yoon, Tae-Gook;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.3
    • /
    • pp.183-190
    • /
    • 2008
  • The maintenance and management of each tunnel has been individually performed in depending on service, management agency, and tunnel size. The maintenance and management system for the existing tunnel consists of simple tunnel card and the computerization of basic tunnel data, now. There is not the systemic maintenance and management system for tunnel. Therefore, it has been impossible the systemic maintenance and management for tunnel due to loss of data obtained from each step, such as, plan, design, construction, or maintenance, with time. The objective of this study is to build the database system in combing the results of tunnel scanning with all data obtained from plan, design, construction, or maintenance step.

A Intercomparison on the estimating shield TBM tunnel face pressure through analytical and numerical analysis (이론해와 수치해석적 검토를 통한 쉴드TBM 막장압 산정 결과 상호비교)

  • Jun, Gy-Chan;Kim, Dong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.3
    • /
    • pp.273-282
    • /
    • 2016
  • This study estimates tunnel face pressure through existing 8 analytical equations and 3D numerical analysis, and compares and examines it. In general, the estimating tunnel face pressure of domestic shield TBM has been examined by a method according to analytical equation and empirical method, but numerical analysis is combined in a section passing complicated stratigraphic condition and special soil condition. Therefore, the researcher is to find a reliable method to examine of tunnel face pressure by confirming a correlation between tunnel face pressure estimated by equation and tunnel face pressure estimated by numerical analysis program. When tunnel face pressure is estimated, both analytical equation and numerical analysis were identically examined in soil conditions such as sandy soil and cohesive soil. In addition, existing analytical equation is used as equation, and 3D analysis copying construction process and shield tunnel as numerical analysis.

Ground Behavior around Tunnel Using Tunnel-shaped Trapdoor Model Test (터널형상의 Trapdoor 모형실험을 통한 지반 거동에 관한 연구)

  • Han, Young-Chul;Kim, Sang-Hwan;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.65-80
    • /
    • 2014
  • This study conducted Trapdoor tests with actual tunnel shape, investigated the mechanical behavior of ground and loosening load on tunnels, and evaluated the mechanism of progressive failure by numerical simulation. The loosening load sharply decreased initially, but it generally increased and reached the stabilized level exhibiting the arching effect, and loose sand showed relatively higher values than those of dense sand. The shear band started from the tunnel shoulder with $63^{\circ}$ (loose sand) to $69^{\circ}$ (dense sand), and gently curved inward to the ground surface. The widths of shear band formation above the tunnel showed a range from 1.8b to 1.9b (b=Tunnel width), which are similar to those values calculated from existing formular. The vertical height of this shear band for deep tunnel was turned out to be a bit lower than that from existing studies (3.0*Tunnel Height).

Behavior of the Ground in Obliquely Crossed area Due to Tunnel Excavation Under the Existing Tunnel (기존터널에 근접하여 경사로 교차되는 하부터널굴착에 따른 교차부지반의 거동)

  • Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.4
    • /
    • pp.285-294
    • /
    • 2005
  • The behaviors of the ground in crossed zone and the existing upper tunnel in shallow cover due to the excavation of new lower tunnel crossed to that was studied. Model test was performed in the large scale test pit, the size was '$4.0m(width){\times}3.8m(height){\times}4.1m(length)$'. Test ground was constructed uniformly by sand in middle density and test with the crossed angle of $56^{\circ}$ (obliquely) were performed. The numerical analysis was performed on equal condition with model test. Results of the study by model test and numerical analysis show that earth pressure and settlement of the ground in crossed zone were redistributed due to the longitudinal arching effect by the excavation of lower tunnel. Model test shows that upper tunnel blocks stress flow due to the longitudinal arching effect by excavation of lower tunnel.

  • PDF

Mechanical behaviour of rib-reinforced precast tunnel liner according to variable rib-reinforcement shapes (프리캐스트 터널 Liner의 리브보강 형상변화에 따른 역학적 거동 특성)

  • Lee, Gyu-Phil;Lee, Seong-Won;Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.3
    • /
    • pp.265-275
    • /
    • 2009
  • Due to the limitation of construction efficiency and structural safety, the application of the high covering and wide width tunnels was limited prior to the introduction of precast rut and cover tunnels. Therefore, a cut and cover tunnel structure with rib reinforcement is proposed to mechanically improve the safety on condition of high covering and wide width tunnel. Therefore, a technical problem that can provide a response similar to the actual filling conditions is analyzed by the finite element analyses, moreover, the mechanical behaviour of developed rib-reinforced precast tunnel liner through a large-sized model test will be investigated. The ultimate load of the developed rib-reinforced precast tunnel liner shows a 3% reduction compared to existing rib-reinforced precast tunnel liner, especially, the section of rib-reinforcement decreased to 55% compared to it of existing. Therefore, the stability of tunnel structure can be significantly improved through the developed rib-reinforced precast segment.

Design Consideration for Tunnel Spillway related to Hydraulic Characteristics (수리특성을 고려한 수로터널 설계)

  • Yoon, Dong-Duk;Kim, Tae-Hyok;Lee, Jung-Woo;Oh, Myung-Ryul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.161-168
    • /
    • 2006
  • The recent unpredictable weather condition, especially abnormal heavy precipitation which is on the verge of PMF, made implement more rigorous design standard. Following these trends, the idea of additional auxiliary spillway, most of them are tunnel around existing one, is adopted to many sites. Tunnel spillway, having free water table is generally consisted of several compartments such as inlet, transition, inclined, curved and stilling parts. It may has some technical problems to be considered. Among them, the surface deterioration due to cavitation is reported many times in the part of irregularities on lining. Including this kind of problem, several technical considerations for tunnel spillway will be handled in this paper during design procedure.

  • PDF

In based Secure Tunnel Broker for IPv6 (IPv6를 위한 XML 기반 안전한 터널 브로커)

  • Seo Chang-Ho;Yun Bo-Hyun
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.11 no.6
    • /
    • pp.531-537
    • /
    • 2005
  • The Tunnel Broker is to provide dedicated servers and to automatically manage tunnel requests coming from the users. This approach is useful to stimulate the growth of IPv6 interconnected hosts and to provide easy access to their IPv6 networks. However, the existing tunnel broker is vulnerable to attacks of malicious users about network resources and services. Therefore, to solve the secure problem of tunnel broker, this paper presents secure IPv6 tunnel broker based on TSP(Tunnel Setup Protocol). The clients and the tunnel broker are communicated based on SHTTP(Secure HTTP) and the XML message of plain text is converted to XML signature by encryption and decryption. finally, Clients and tunnel server use the IPsec method to protect the important information.