• Title/Summary/Keyword: Existing

Search Result 45,395, Processing Time 0.051 seconds

Influence of size and location of a pre-existing fracture on hydraulic fracture propagation path

  • Bo, Zhang;Yao, Li;Xue Y., Yang;Shu C., Li;Chao, Wei;Juan, Songa
    • Geomechanics and Engineering
    • /
    • v.32 no.3
    • /
    • pp.321-333
    • /
    • 2023
  • Rock masses often contain natural fractures of varying sizes, and the size of the natural fractures may affect the propagation of hydraulic fractures. We conduct a series of triaxial hydraulic fracturing tests to investigate the effect of the pre-existing fracture size a on hydraulic fracture propagation. Experimental results show that the pre-existing fracture size impacts hydraulic fracture propagation. As the pre-existing fracture size increases, the hydraulic fracture propagates towards the pre-existing fracture tips, evidenced by the decreased distance between the final hydraulic fracture and the pre-existing fracture tips. Furthermore, the attracting effect of pre-existing fracture tips increases when the distance between the wellbore and the pre-existing fracture is short (L/D=2 or 4 in this study). With increased distance between the wellbore and the pre-existing fracture (L/D=6 in this study), the hydraulic fracture propagates to the middle of the pre-existing fracture rather than the tips, as the attracting effect of the pre-existing fracture diminishes.

Effect of new tunnel construction on structural performance of existing tunnel lining

  • Yoo, Chungsik;Cui, Shuaishuai
    • Geomechanics and Engineering
    • /
    • v.22 no.6
    • /
    • pp.497-507
    • /
    • 2020
  • This paper presents the results of a three-dimensional numerical investigation into the effect of new tunnel construction on structural performance of existing tunnel lining. A three-dimensional finite difference model, capable of modelling the tunnel construction process, was adopted to perform a parametric study on the spatial variation of new tunnel location with respect to the existing tunnel with emphasis on the plan crossing angle of the new tunnel with respect to the existing tunnel and the vertical elevation of the new tunnel with respect to the existing one. The results of the analyses were arranged so that the effect of new tunnel construction on the lining member forces and stresses of the existing tunnel can be identified. The results indicate that when a new tunnel underpasses an existing tunnel, the new tunnel construction imposes greater impact on the existing tunnel lining when the two tunnels cross at an acute angle. Also shown are that the critical plan crossing angle of the new tunnel that would impose greater impact on the existing tunnel depends on the relative vertical location of the new tunnel with respect to the existing one, and that the overpassing new tunnel construction scenario is more critical than the underpassing scenario in view of the existing tunnel lining stability. Practical implications of the findings are discussed.

Fabrication of a CAD/CAM monolithic zirconia crown to fit an existing partial removable dental prosthesis

  • Paek, Janghyun;Noh, Kwantae;Pae, Ahran;Lee, Hyeonjong;Kim, Hyeong-Seob
    • The Journal of Advanced Prosthodontics
    • /
    • v.8 no.4
    • /
    • pp.329-332
    • /
    • 2016
  • Fabricating a surveyed prosthesis beneath an existing partial removable dental prosthesis (PRDP) is a challenging and time-consuming procedure. The computer-aided design/computer-assisted manufacturing (CAD/CAM) technology was applied to fabricate a retrofitted, surveyed zirconia prosthesis to an existing PRDP. CAD/CAM technology enabled precise and easy replication of the contour of the planned surveyed crown on the existing abutment tooth. This technology ensured excellent adaptation and fit of newly fabricated crown to the existing PRDP with minimal adjustments. In this case report, a seventy-year-old male patient presented with fractured existing surveyed crown. Because the existing PRDP was serviceable, new crown was fabricated to the existing PRDP.

Effects of Tunnel Construction on an Existing Tunnel Lining (터널 근접시공이 기존터널 라이닝에 미치는 영향에 관한 연구)

  • Yoo, Chung-Sik;Song, Ah-Ran
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.4
    • /
    • pp.307-324
    • /
    • 2006
  • Effects of new tunnel construction on an existing tunnel are investigated in this paper. A parametric study was conducted on a number of conditions in terms of relative location of the new tunnel to the existing tunnel using 2D and 3D finite element models. The results indicated that the new tunnel construction imposes most severe effect on the existing tunnel's lining when located below the existing tunnel's springline for cases in which the new tunnel is constructed parallel to the existing tunnel. It is also revealed that the effect to the new tunnel construction is larger when the new tunnel is constructed under the existing tunnel than above for cases in which the new tunnel is crossed with the existing tunnel. Practical implications of the finding are discussed.

Bond Strength Characteristics of Bonded Concrete Overlay (접착식 콘크리트 덧씌우기의 부착강도 특성 분석)

  • Park, Jong Won;Kim, Young Kyu;Lee, Seung Woo;Han, Seung Hwan
    • International Journal of Highway Engineering
    • /
    • v.15 no.4
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : Bonded concrete overlay is a favorable maintenance method since the material properties are similar to existing concrete pavements. In addition, bonded concrete overlay has advantage of structural performance since the overlay layer and the existing pavement perform as a monolithic layer. It is important to have suitable bond strength criteria to secure the performance of bonded concrete overlay. This study aimed to investigate the factors influencing bond strength characteristics between existing concrete pavement and overlay material. METHODS: Bond strength between overlay and existing pavement are measured and analyzed for various conditions such as the type of overlay materials, compressive and flexure strength of overlay and existing pavement, and deterioration status of existing pavement. RESULTS: The strength of overlay material does not significantly influence the bond strength. The overlay of ultra-rapid hardening cement generally gives low bond strength. However, ultra rapid hardening polymer modified concrete gives robust bond strength. The deterioration of existing concrete significantly decrease the bond strength. CONCLUSIONS: Bond strength of bonded concrete overlay highly depends on condition of existing concrete pavement rather than overlay material.

Load Transfer Capacity for the Planar Joints between Existing and New Slab in Apartment Remodelling Construction for Enlarging the Interior Space (평면확장형 공동주택 리모델링 공사에서 신/구 슬래브 접합부의 횡방향 하중전달 능력)

  • You Young Chan;Kim Seung Hun;Choi Ki Sun;Kim Keung Hwan;Lim Byung Ho;Yu Jee Yeung
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.11a
    • /
    • pp.295-298
    • /
    • 2005
  • In General, post-installed dowel bars are used as a shear connector to ensure the composite actions between new slabs and existing slabs in an apartment remodelling constructions expecially for enlarging the interior space outward the existing buildings. But, it has not been checked that the connection performance between existing and new slab is satisfactory not only for the structural safety condition but also the for serviceability and dwelling requirements. In this research, an experimental works were presented to evaluate the load transfer capacity for the planar joints between existing and new slab. The existing slabs were obtained from the existing apartment housing which will be demolished. Test results showed that the planar joints with post-installed dowel bars behaved in full composite modes until ultimate capacity of test specimens, so sufficient ultimate and serviceability performance are confirmed.

  • PDF

The Stability Dependency of New Generator on the Existing System Capacity (건설전원용량에 따른 신설전원의 안정도특성)

  • Nam, Sang-Cheon
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.35 no.7
    • /
    • pp.285-295
    • /
    • 1986
  • This study is to investigate the stability of expanded new generator plant depending on the capacity of existing system. We examined the transmitting power limit to the existing system as its capacity increase for the various system configuration with fixed location of plants and substations. The results show that the stability has decreasing tendency when the existing source capacity increase. Thus it can be concluded that new generator has little stability problem when it connected to small system, whereas large existing system capacity gives remarkable difficulty in adopting new generator.

  • PDF

A Comparative Study of the Remodeling of an Existing Hospital and the Remodeling of an Existing Hospital with the Addition of an Annex - Focused on Adventist General Hospital in Seoul - (기존병원 중심의 리모델링과 새 병원중심의 리모델링 비교연구 - A 종합병원을 중심으로 -)

  • Hong, Soon-Myung
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.14 no.1
    • /
    • pp.7-20
    • /
    • 2008
  • This study is an analysis of the characteristics between the remodeling of an existing hospital and the remodeling of an existing hospital with the addition of a new annex. The comparison of the two remodeling methods focused on the difference of gross area, circulation system, improvement of hospital function, profitability of remodeling construction, and so on. The result of this study can be summed up as follows. The remodeling of an existing hospital with a new annex has the merit of enlarging new areas, promoting the function of the hospital, changing the inner circulation system, and facilitating the construction. However, it has the demerit of requiring too much money and expanded space for the construction. Therefore, it is possible to use the existing hospital remodeling method for small scale hospitals that do not have many patients, but it would be necessary for big scale hospitals with many patients to adopt the method of remodeling the existing hospital with the addition of an annex.

  • PDF

Neural network based model for seismic assessment of existing RC buildings

  • Caglar, Naci;Garip, Zehra Sule
    • Computers and Concrete
    • /
    • v.12 no.2
    • /
    • pp.229-241
    • /
    • 2013
  • The objective of this study is to reveal the sufficiency of neural networks (NN) as a securer, quicker, more robust and reliable method to be used in seismic assessment of existing reinforced concrete buildings. The NN based approach is applied as an alternative method to determine the seismic performance of each existing RC buildings, in terms of damage level. In the application of the NN, a multilayer perceptron (MLP) with a back-propagation (BP) algorithm is employed using a scaled conjugate gradient. NN based model wasd eveloped, trained and tested through a based MATLAB program. The database of this model was developed by using a statistical procedure called P25 method. The NN based model was also proved by verification set constituting of real existing RC buildings exposed to 2003 Bingol earthquake. It is demonstrated that the NN based approach is highly successful and can be used as an alternative method to determine the seismic performance of each existing RC buildings.

Implementing a Virtual Shopping Mall for the Cheapest Price using MOM(Message-Oriented Middleware) based on XML (XML 기반의 MOM(Message-Oriented Middleware)을 이용한 최저 가격 보장을 위한 가상 쇼핑몰 구현)

  • 임종선;주경수
    • Journal of Information Technology Applications and Management
    • /
    • v.9 no.1
    • /
    • pp.61-70
    • /
    • 2002
  • There are a lot of shopping malls in Internet and most of consumers want to buy good goods in cheap price through the shopping malls. To support them, many sites for price comparison are constructed. But man or woman search many shopping malls and insert their price informations into database that the price comparison sites own. To overcome this disadvantage, virtual shopping malls are builded. These virtual shopping malls are connected and cooperated a lot of affiliated existing shopping malls for the cheapest price information. But, these virtual shopping mall are connected to those existing shopping malls in synchronous. So If they are connected to many existing shopping malls, we have to wait long time because of searching for many existing shopping malls. In this paper, we designed and implemented a virtual shopping mall that connect to many existing shopping malls in asynchronous. For a asynchronous communication between this virtual shopping mall and many existing shopping malls, we used JMS (Java Message Service) that is a standard Java API for MOM (Message-Oriented Middleware).

  • PDF