• 제목/요약/키워드: Excavation face

검색결과 250건 처리시간 0.024초

유한 차분법을 이용한 터널 단면 해석 (The Analysis of Tunnel Excavation using Finite Difference Method)

  • 김동후;유건선
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1991년도 추계학술발표회 논문집 지반공학에서의 컴퓨터 활용 COMPUTER UTILIZATION IN GEOTECHNICAL ENGINEERING
    • /
    • pp.166-178
    • /
    • 1991
  • Using FLAC, which is an explicit finite difference code written for analysis of problems in geotechnical engineering, a particular example 2 in the Korean Geothechnical Society News has been analysed. The elastoplasticity formulation in FLAC assumes an elastic, perfectly plastic solid in plane strain which conforms to a Mohr-Coulomb yield condition. During tunnel excavations by stages, stresses and diaplacements in region around the tunnel varies according to distance from the face of tunnel and installation of tunnel supports, and soon. In this analysis, the three dimensional support effect of the rock mass during the process of excavation is simulated by using the stress distribution method, and varying the material constants of shotcrete in each stage also considered. The maximum convergency is occured at the crown of the tunnel and estimated to be about 12mm.

  • PDF

굴착공법이 터널변위 거동에 미치는 영향-유한요소해석 (Effects of Excavation Methods on Tunnel Deformation Behavior using Finite Element Analysis)

  • 유충식;김주미;김선빈
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.199-207
    • /
    • 2006
  • Before getting to the actual study of the load distribution factor in various excavating methods, this research is preliminarily focused on the comparison of two different excavation methods, CD cut method and Ringcut method. Especially, the purpose of this research is to study the behavioral mechanism of two tunnels which share the same construction environment but different excavating method. Two numerical analysis models with the same tunnel section and material properties are compared in this study, and they are analyzed by 3D Finite Element Analysis. In each model, face stability, crown displacement, ground settlement, and shotcrete-lining stress are computed. Thus, the general behavior of CD cut method and Ringcut method are studied, and it certified what should be considered for the calculation of the load distribution factor.

  • PDF

터널막장 전방 파악을 위한 TSP(Tunnel Seismic Prediction) 탐사 사례 연구 (Application of TSP Suvey to Predict the Ground Conditions Ahead of Tunnel Face)

  • 조성원;이효;유재원;김도훈;남승혁
    • 화약ㆍ발파
    • /
    • 제31권2호
    • /
    • pp.40-49
    • /
    • 2013
  • 터널 막장전방의 지반조건을 예측하는데 굴절법 탄성파탐사가 주를 이루어 왔으나, 최근에는 탄성파탐사 기기 및 기법의 발전에 힘입어 시추공을 이용한 토모그래피 등이 활발히 적용되고 있다. 본 논문은 TSP (Tunnel Seismic Prediction) 탐사장비를 이용하여 막장전방의 지반조건을 예측함으로써 암질 변화구간이나 단층, 파쇄대등 지질이상대를 파악하여 터널 굴착 시 시공 및 안정상의 문제점을 예방하는데 목적이 있다. 본 연구에서는 ${\bigcirc}{\bigcirc}$-${\bigcirc}{\bigcirc}$ 도로개설현장에서 적용된 TSP탐사에 의한 터널전방의 지질이상대를 파악한 사례로 막장탐사 방법의 타당성을 살펴보고자 하였다.

Stability assessment of tunnel face in a layered soil using upper bound theorem of limit analysis

  • Khezri, Nima;Mohamad, Hisham;Fatahi, Behzad
    • Geomechanics and Engineering
    • /
    • 제11권4호
    • /
    • pp.471-492
    • /
    • 2016
  • Underground tunnelling is one of the sustainable construction methods which can facilitate the increasing passenger transportation in the urban areas and benefit the community in the long term. Tunnelling in various ground conditions requires careful consideration of the stability factor. This paper investigates three dimensional stability of a shallow circular tunnel in a layered soil. Upper bound theorem of limit analysis was utilised to solve the tunnel face stability problem. A three dimensional kinematic admissible failure mechanism was improved to model a layered soil and limiting assumptions of the previous studies were resolved. The study includes calculation of the minimum support pressure acting on the face of the excavation in closed-face excavations. The effects of the characteristics of the layers on the minimum support pressure were examined. It was found that the ratio of the thickness of cover layers particularly when a weak layer is overlying a stronger layer, has the most significant influence on the minimum tunnel support pressure. Comparisons have been made with the results of the numerical modelling using FLAC3D software. Results of the current study were in a remarkable agreement with those of numerical modelling.

터널 막장보강효과에 대한 연구 (A study of tunnel face reinforcement)

  • Peila, Daniele;Oreste, Pier Paolo;Pelizza, Sebastiano;Kim, Sang-Hwan
    • 한국터널지하공간학회 논문집
    • /
    • 제6권3호
    • /
    • pp.259-267
    • /
    • 2004
  • The practice of introducing and grouting reinforced fiber glass pipes or bar into the core to be excavated to maintain stable the tunnel face during excavation has been applied to many tunnels, where difficult geotechnical conditions are present, with good results in terms of safety and speed of works. This reinforcing technique, initially developed to be used jointly with the mechanical precut in clay, has been widely used with other geotechnical conditions as the only type of reinforcement or joined with other ground consolidation and/or reinforcement techniques (i.e. steel pipes or jet-grouting umbrella). At present same numerical researches have been carried out to find which are the real working conditions of the reinforcing elements but no final results have been obtained for the definition of the best design approaches. In this work the results of a three dimensional parametric numerical model is presented.

  • PDF

토목설계 및 시공분야 지반조사를 위한 절리 단면 영상법 개발 및 그의 응용사례 (Development of fracture face mapping algorithm and its applications to the design of various engineering and environmental works.)

  • 김중열;김유성;김기석
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.119-126
    • /
    • 2002
  • Fractures, especially faults have most significant influence on the difficulties encountered in various engineering and mining works, because they can give rise to inevitable reductions in shear strength as well as large increase in permeability. Thus, before underground access is possible, it is desirable to estimate the distribution and geometry of fractures in advance, if reliable structural data from e.g. Televiewer tool are available. To this end, fracture face mapping is just the evaluation method used to form a fracture image determined by intersecting of each fracture plane with a selected plane section of a rock mass, assuming that all fractures be planar with fixed-aperture. Although many fractures are geometrically complex and others are altered chemically, according to the abundant experiments in recent years, it would seem that the technique could be applied to benefit the design of numerous engineering works such as slope stability, tunnel excavations, dam foundation and diverse environmental works. This paper presents at first an evaluation algorithm for fracture face mapping and then concludes with various representative examples of applications.

  • PDF

Electrical resistivity tomography survey for prediction of anomaly in mechanized tunneling

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • 제19권1호
    • /
    • pp.93-104
    • /
    • 2019
  • Anomalies and/or fractured grounds not detected by the surface geophysical and geological survey performed during design stage may cause significant problems during tunnel excavation. Many studies on prediction methods of the ground condition ahead of the tunnel face have been conducted and applied in tunneling construction sites, such as tunnel seismic profiling and probe drilling. However, most such applications have focused on the drill and blast tunneling method. Few studies have been conducted for mechanized tunneling because of the limitation in the available space to perform prediction tests. This study aims to predict the ground condition ahead of the tunnel face in TBM tunneling by using an electrical resistivity tomography survey. It compared the characteristics of each electrode array and performed an investigation on in-situ tunnel boring machine TBM construction site environments. Numerical simulations for each electrode array were performed, to determine the proper electrode array to predict anomalies ahead of the tunnel face. The results showed that the modified dipole-dipole array is, compared to other arrays, the best for predicting the location and condition of an anomaly. As the borehole becomes longer, the measured data increase accordingly. Therefore, longer boreholes allow a more accurate prediction of the location and status of anomalies and complex grounds.

상한치 이론에 근거한 터널 막장의 안정성 연구 (Evaluation of tunnel face stability based on upper bound theorem)

  • 이인모;이재성;남석우
    • 한국터널지하공간학회 논문집
    • /
    • 제5권1호
    • /
    • pp.3-11
    • /
    • 2003
  • 터널 시공 시 막장의 안정은 주요 관심사이다. 그러나, 터널 지보재에 비해 상대적으로 터널 막장의 안정성 문제는 그리 많은 연구가 이루어지지 않은 실정이다. 또한 지하수위 하에서 터널 시공 시 터널 내로 지하수 흐름에 의해 발생된 침투수력은 막장의 안정성에 큰 영향을 미칠 수 있다. 본 논문에서는 두 가지 요소를 고려하여 터널 막장의 안정성을 평가하였다. 하나는 극한이론 중 상한치 이론으로 산출된 유효응력이며, 다른 하나는 정상류 흐름조건에서 수치해석으로부터 산출된 침투수력이다. 열악한 지반조건에서 터널 시공 시 터널의 안정과 인접 구조물의 손상을 방지하기 위해 보조공법이 적용된다. 강관 다단 그라우팅 공법은 근래 국내에서 적용되고 있는 보조공법 중의 하나이다. 본 논문에서는 강관 다단 그라우팅으로 보강된 터널의 막장 안정성도 함께 평가되었다.

  • PDF

터널 굴진면 최대 수평변위의 변화 양상에 따른 단층 자세 분석 (Analysis of Fault Attitudes by Using Trajectories of the Maximum Longitudinal Displacement on Tunnel Face)

  • 윤현석;서용석
    • 지질공학
    • /
    • 제26권3호
    • /
    • pp.393-401
    • /
    • 2016
  • 본 연구에서는 3차원 유한요소해석을 통하여 단층이 출현하기 직전의 굴진면에서 발생한 최대 수평변위의 변화 양상을 분석함으로써 단층의 자세와 굴진면 내 단층의 출현 위치를 예측하였다. 해석에는 총 28개의 단층 자세 모델이 이용되었다. 순경사를 가지는 단층은 터널 굴착이 진행됨에 따라 굴진면의 상부에서 처음 출현하고, 최대 수평변위가 굴진면 중앙부에서 상부로 이동하는 경향을 보인다. 역경사를 가지는 단층은 굴진면의 하부에서 처음 출현하고, 굴착에 따라 굴진면의 중앙부 또는 중앙 상부에서 하부로 최대 수평변위가 이동하는 경향을 보인다. 또한 최대 수평변위가 이동하는 방향은 순경사 모델의 경우 단층의 경사가 고각일수록 좌측 상부에서 측벽부를 향해 이동하며, 역경사 모델은 단층의 경사가 고각일수록 좌측 하부에서 측벽부를 향해 이동한다. 결과적으로 최대 수평변위는 굴진면 내 단층이 출현하는 위치를 따라 이동하는 경향을 보인다. 따라서 굴착에 따른 굴진면의 수평변위 변화 양상을 분석하여 굴진면 전방에 분포하는 단층의 자세와 굴진면 내 단층이 출현하는 위치에 대한 예측이 가능한 것으로 나타났다.

터널 장공발파에서 굴진율 개선 및 작업공정 시간 단축 사례 (Case Study for the Improvement of Tunnel Advance Rate & the Time Reduction of Working Process in Long Hole Blasting About Tunnel Excavation)

  • 김희도;이준원;이하영
    • 화약ㆍ발파
    • /
    • 제31권2호
    • /
    • pp.32-39
    • /
    • 2013
  • 일반적으로 장공발파 방법은 과거 대규모 채탄막장이나 댐 기초굴착, 광산 등에서 행하여져 왔으나, 최근 우리나라에서 신설되는 토목터널에서 시공 효율성 및 경제성을 목적으로 많이 실시되고 있다. 고속국도제 600호선 부산외곽 고속도로 ${\bigcirc}$공구 또한 총연장 약 8km의 4차선 대단면 도로 터널로서 Type I, II, 4.4m 장공발파를 실시하는 현장이다. 그러나 당 현장에서는 발파 후 굴진율이 약 75%에 그쳐 발파 후속작업 시간에 영향을 미치게 되고 그로 인하여 전체 작업공정 시간이 증가하여 계획된 굴진을 못하는 현상이 자주 발생되었다. 본 논문에서는 당 현장에서 위 문제를 극복하기 위하여 실시된 장공발파 공법 중 천공경과 가장 밀장전 할 수 있는 ${\phi}36mm$폭약을 적용하여 굴진효율을 향상시키고 작업공정 시간을 단축시킨 사례를 소개하고자 한다.