유한 차분법을 이용한 터널 단면 해석

The Analysis of Tunnel Excavation using Finite Difference Method

  • 발행 : 1991.10.01

초록

Using FLAC, which is an explicit finite difference code written for analysis of problems in geotechnical engineering, a particular example 2 in the Korean Geothechnical Society News has been analysed. The elastoplasticity formulation in FLAC assumes an elastic, perfectly plastic solid in plane strain which conforms to a Mohr-Coulomb yield condition. During tunnel excavations by stages, stresses and diaplacements in region around the tunnel varies according to distance from the face of tunnel and installation of tunnel supports, and soon. In this analysis, the three dimensional support effect of the rock mass during the process of excavation is simulated by using the stress distribution method, and varying the material constants of shotcrete in each stage also considered. The maximum convergency is occured at the crown of the tunnel and estimated to be about 12mm.

키워드