• Title/Summary/Keyword: Excavation

Search Result 2,452, Processing Time 0.025 seconds

A Case Study on the Feed-Back Analysis and the Reinforcement Plan using the Measurement Data of Excavation Site close to the Existing Underground Box (기존 지하 Box 근접 굴착공사 현장의 계측결과를 이용한 역해석 및 보강방안의 적용 사례)

  • Lee, Jung-Hee;Noh, Won-Seok;Jeong, Soon-Ig;Kim, Wan-Jong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.445-456
    • /
    • 2010
  • Massive underground excavation can be carried out recently due to the technical development of the excavation for retaining wall. Feed-back analysis using field measurement results is recommended to secure the stability of the construction because calculated values at stages of the design and the construction are uncertain. Reinforcement plan should be established based on the result of it. This study deals with the underground excavation site, which is under construction and is close to structure(subway) at downtown area. The result of feed-back analysis on the measurement data of displacement at multi-soil layers was reflected to make a plan for safe construction. This case study can be useful information for contingency plan on abnormal displacement which can be occurred at similar underground excavation.

  • PDF

A Study on the Stability of Existing Subway Tunnel due to Construction of New Underpass (지하차도 건설에 따른 기존 지하철터널 안정성에 대한 연구)

  • Chung, Jee-Seung;Choi, Jae-Young;Lee, Jin-Hyuk
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.57-63
    • /
    • 2016
  • Recently, subways in the city are formed a vast underground network which is interfered with construction when large-scale infrastructure will be planned to nearby existing subway tunnels. Researches have been restricted to estimate stability of existing subway tunnel due to adjacent excavation causued by small construction such as buildings. In this paper, OO underpass is planned on the top of existing subway tunnel, which will be need large-scale excavation, is selected as a subject of study. And the purpose of this study is to analyze the effects on existing subway tunnel due to excavation by stages on construction of underpass. The 3D-numerical analysis was performed by using the MIDAS/GTS program. The stability on existing subway tunnel caused by sequential excavation is analysed using numerical results. Based on the analysis, the excavation orders and reinforcement methods was suggested for stability of exiting subway tunnel.

IT Model to Calculate Required Equipments for Excavation Work in Construction Projects

  • Mahajan, Darshan A.;Rajput, Babalu L.
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.1-4
    • /
    • 2013
  • Excavation is most commonly used activity in all construction projects. All contracting agencies prefer to use bigger and heavier excavators and dumpers on site to do excavations if quantity of excavation is huge. Estimation of required number of excavators and dumpers for completion of excavation could be rather a tedious process involving repetitive calculation on which professionals spend their valuable time. As the Information Technology is highly involved in construction section there os need to have IT model for estimation of number of excavators and dumpers. The developed model is useful to calculate required equipments within short period of time. The purpose of the developed IT model is to save the time and efforts of the construction professional. The paper discusses about model which can be used on site to estimate numbers of excavators and dumpers required for completion of certain quantity of excavation within the given time. The calculation considers various existing formulas and method to generate the output. This information could certainly be useful in planning equipments on construction project sites. The tool is user friendly where any non IT background person can use it on construction sites.

Risk Factor Selaction and Safety Management Plan in the Underground Excavation Construction (지반굴착공사에서의 위험요인 선정과 안전관리방안 연구)

  • Won, Yu-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.21 no.4
    • /
    • pp.31-37
    • /
    • 2019
  • When the foundation work of the underground part of the building structure or the excavation work of the civil engineering structure is carried out, there is the earthwork work by the inevitable process. As the economic situation continues to develop, construction in urban areas is becoming bigger and higher in scale due to the expansion of infrastructure and the rescue of urban dwellings in urban areas, and excavation of underground roads is inevitable. Excavation of the underground part may cause problems in the process difficulty and safety of the earthworks due to the complexity and various characteristics of the ground selected without consideration of the ground characteristics and site conditions. In order to complete the required facilities, it is necessary to secure the design and construction of the retaining walls. In order to complete the required construction, It is an important factor satisfying construction period and economical efficiency.

Stability Analysis of Sheet Pile Reinforced with Strut (버팀대로 보강된 널말뚝의 안정해석)

  • Kim, Ji Hoon;Kang, Yea Mook;Chee, In Taeg
    • Korean Journal of Agricultural Science
    • /
    • v.24 no.2
    • /
    • pp.226-236
    • /
    • 1997
  • The results obtained by elasto-plastic analysis method about the displacement, deformation and stability on the soft ground excavation using sheet pile were summarized as follows ; 1. In the case of strut 1 step, the maximum wall displacement value in the first and the second excavation was small, but it increase remarkably after the third excavation and when the excavation depth was 8m, the point of maximum wall displacement was shown 0.75H~0.8H. 2. The value of safety factor(Fs) was increased with increasing of the penetration depth of sheet pile, cohesion and internal friction angle of ground. Safety factor was mostly effected by penetration depth of sheet pile and more effected by cohesion than internal friction angle of ground. 3. Since the deformation of sheet pile of this ground from the results of analysis and measurement increased remarkabaly after 6m excavation depth, it was desirable that the point of strut installation was GL-6m. 4. Safe excavation depth on ground by analysis considered penetration depth, cohesion and internal friction was shown at the table 3.

  • PDF

PLAXIS 3D simulation, FLAC3D analysis and in situ monitoring of Excavation stability

  • Lei, Zhou;Zahra, Jalalichi;Vahab, Sarfarazi;Hadi, Haeri;Parviz, Moarefvand;Mohammad Fatehi, Marji;Shahin, Fattahi
    • Structural Engineering and Mechanics
    • /
    • v.84 no.6
    • /
    • pp.743-765
    • /
    • 2022
  • Near-surface excavations may cause the tilting and destruction of the adjacent superstructures in big cities. The stability of a huge excavation and its nearby superstructures was studied in this paper. Some test instruments monitored the deformation and loads at the designed location. Then the numerical models of the excavation were made in FLAC3D (a three-dimensional finite difference code) and Plaxis-3D (a three-dimensional finite element code). The effects of different supporting and reinforcement tools such as nails, piles, and shotcretes on the stability and bearing capacity of the foundation were analyzed through different numerical models. The numerically approximated results were compared with the corresponding in-field monitored results and reasonable compatibility was obtained. It was concluded that the displacement in excavation and the settlement of the nearby superstructure increases gradually as the depth of excavation rises. The effects of support and reinforcements were also observed and modeled in this study. The settlement of the structure gradually decreased as the supports were installed. These analyses showed that the pile significantly increased the bearing capacity and decreased the settlement of the superstructure. As a whole, the monitoring and numerical simulation results were in good consistency with one another in this practically important project.

An Analysis of Safety Zone Appropriateness of Urban Railway Box Structures by Adjacent Excavation Using Machine Learning Technique (머신러닝 기법을 적용한 인접굴착에 따른 도시철도 박스구조물의 안전영역 적정성 분석)

  • Jung-Youl Choi;Jae-Seung Lee;Jee-Seung Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.669-676
    • /
    • 2023
  • This study analyzed the relationship between major parameters and numerical analysis results according to various excavations conducted around the urban railway, application of machine learning techniques and verified the scope of influence of the adjacent excavation on the existing urban railway box structure and the appropriateness of the safety area. This study targeted the actual negotiated adjacent excavation works and box structures around the urban railway, and the analysis was conducted on the most representative two-line box structures. The analysis confirmed that the difference in depth of urban railway, excavation depth of adjacent excavation, and depth of underground water level are important parameters, and the difference in excavation depth of adjacent excavation is the parameter that affects the behavior of underground box structures and is an important requirement for setting safety areas. In particular, the deeper the depth of the adjacent excavation work, the greater the effect on the deflection of the underground box structure, and the horizontal separation distance, one of the important requirements for determining the management grade of the existing adjacent excavation work, is relatively small.

Stability of the Innovative Prestressed wale System Applied in Urban Excavation (도심지 굴착에 적용된 IPS 띠장의 안정성)

  • Kim, Nak-Kyung;Park, Jong-Sik;Jang, Ho-Joon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.2
    • /
    • pp.225-235
    • /
    • 2005
  • The stability of innovative prestressed wale system applied in urban excavation was investigated. The IPS is a wale system prestressed by tension of steel wires. The IPS consists of steel wires, H-beam support and wale. The IPS provides a high flexural stiffness to resist the bending moment caused by earth pressures. And the IPS transmits earth pressures due to excavation to corner struts. The IPS provides a larger spacing of support, economical benefit, construction easiness, good performance and safety control. This paper explains basic concept and mechanism of the IPS and presents the measured performances of the IPS applied in urban excavation. In order to investigate applicability and stability of the IPS in urban excavation, observations and measurements in site were performed. The IPS applied in urban excavation was performed successfully. The results of the field instrumentation were presented. The measured performances of the IPS were investigated. And behavior of the wall and corner struts was investigated.

Displacement Comparison of a Braced Retaining Wall by Elasto-Plastic Analysis Program (탄소성 해석프로그램에 의한 버팀지지 흙막이벽의 변위 비교)

  • 신방웅;김상수;오세욱;김동신
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.395-402
    • /
    • 2000
  • Recently, the deep excavations have been peformed to utilize the under ground space. As the ground excavation is deeper, the damage of the adjacent structure and the ground occurs frequently. The analysis of the retaining structures is necessary to the safety of the excavation works. There are many methods such as elasto-plastic, FEM, and FDM to analyze the displacement of the retaining structure. The elasto-plastic method is generally used in practice. In this thesis, GEBA-1 program by the Nakamura-Nakajawa elasto-plastic method was developed. The program for Windows was used the Visual Basic 6.0, and the Main of the program consists of three subroutines, SUB1, SUB2, and SUB3. The lateral displacement of the wall was analyzed by the developed program GEBA-1, SUNEX, and EXCAD, and compared with the measured displacement by the Inclinometer(at three excavation work sites). The excavation method of each site is braced retaining wall using H-pile. Each excavation depth is 14m, 14m, or 8.2m. The results of the analyses are the followings ① In the multi-layer soil, the lateral displacement by the GEBA-1 and EXCAD which is considering the distribution of the strut load is equal to the measured displacement. Elasto-plasto programs can't consider the change of the ground water in clay. Therefore, the analysis displacement was expected only 20% of the measured wall displacement. ③ At the final excavation step, the maximum lateral displacement of analysis and field occurred 7∼18m at the 85∼92% of the excavation depth. ④ The maximum lateral displacement in clay, as 50mm, occurred on the ground surface.

  • PDF

Development of a System Predicting Maximum Displacements of Earth Retaining Walls at Various Excavation Stages Using Artificial Neural Network (인공신경망을 이용한 굴착단계별 흙막이벽체의 최대변위 예측시스템 개발)

  • 김홍택;박성원;권영호;김진홍
    • Journal of the Korean Geotechnical Society
    • /
    • v.16 no.1
    • /
    • pp.83-97
    • /
    • 2000
  • In the present study, artificial neural network based on the multi-layer perceptron is used and an optimum model is chosen through the process of efficiency evaluation in order to develop a system predicting maximum displacements of the earth retaining walls at various excavation stages. By analyzing the measured field data collected at various urban excavation sites in Korea, factors influencing on the behaviors of the excavation wall are examined. Among the measured data collected, reliable data are further selected on the basis of the performance ratio and are used as a data base. Data-based measurements are also utilized for both teaming and verifying the artificial neural network model. The learning is carried out by using the back-propagation algorithm based on the steepest descent method. Finally, to verify a validity of the formulated artificial neural network system, both the magnitude and the occurring position of the maximum horizontal displacement are predicted and compared with measured data at real excavation sites not included in the teaming process.

  • PDF