• Title/Summary/Keyword: Evaluation Schedule

Search Result 268, Processing Time 0.035 seconds

소프트웨어 시험평가 모델 설계에 관한 연구(공공분야 CALS/EC 중심으로)

  • 임만택;이상호;김성용;변재정
    • Proceedings of the CALSEC Conference
    • /
    • 1999.07a
    • /
    • pp.193-205
    • /
    • 1999
  • Nowadays, public domain software CALS/EC projects give their attention to the importance of test and evaluation (T&E). This article proposed a survey on T&E procedures of the international standards ISO 9000-3, ISO/IEC 9126 and ISO 14598, and of the U.S. Army pamphlet as well as that of MIL-STD-498. And features of testing tools such as their characteristics were reviewed for a reference in selecting appropriate one. Large-scale software projects often encounter with problems during T&E, when they become close to the end of development cycle. The problems generally act as a bottleneck of a project, leading to slippage of the entire schedule. This article tried a close look at the problems and solution alternatives of the T&E policy, management, and technical issues, and proposed a T&E model to support a variety of software development environment.

  • PDF

An Energy-Efficient Mobility-Supporting MAC Protocol in Wireless Sensor Networks

  • Peng, Fei;Cui, Meng
    • Journal of Communications and Networks
    • /
    • v.17 no.2
    • /
    • pp.203-209
    • /
    • 2015
  • Although mobile applications are an essential characteristic of wireless sensor networks, most existing media access control (MAC) protocols focus primarily on static networks. In these protocols, fixed periodic neighbor discovery and schedule updating are used to connect and synchronize neighbors to provide successful data transmission; however, they cannot adapt to mobile speed variation and degrade the network performance dramatically. In this paper, we propose a mobile-supporting mechanism for MAC protocols, in which the decision to update the neighbors of a mobile node is made adaptively according to the mobile speed. Analysis and simulation results demonstrate that the mechanism efficiently avoids the disconnection of amobile node from its neighbors and achieves a better performance as compared with fixed periodic neighbor discovery.

A Study on Project Schedule Simulation Model based on WBS (WBS 기반의 프로젝트 일정 시뮬레이션 모델에 관한 연구)

  • Choi, Hyun-Jin;Cho, Eun-Ae
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2006.11a
    • /
    • pp.491-494
    • /
    • 2006
  • 최근 국내에서도 IT 프로젝트 관리의 중요성이 대두 되고 있으나, 중소규모의 프로젝트를 관리 함에 있어서 PMBOK(Project Management Body Of Knowledge)의 프로젝트 관리 이론과 PERT/CPM(Program Evaluation and Review Technique/Critical Path Method)과 같은 관리 기법들을 이용한 효율적인 프로젝트 평가 및 관리 사례는 많지 않는 실정이다. 철저한 프로젝트 관리를 위해서 소요되는 추가적인 인적 및 시간적 자원에 대한 투자가 현실적으로 어려우며, 평가 기준이나 기법들이 너무 복잡하고 난해한 것이 주된 원인이라 생각된다. 이 논문은 이러한 현실적인 상황을 고려하여, 중소규모의 IT 프로젝트에 적용하기 쉬우면서 효율적으로 활용할 수있는 시간과 인적자원에 대한 일정 시뮬레이션 모델을 통해 프로젝트를 평가하는 정량적 기준을 제공하고 이를 통해 프로젝트의 성공적 완수를 돕는데 의의가 있다.

  • PDF

Effective Data Management Method for Operational Data on Accredited Engineering Programs (공학교육인증 프로그램의 효과적인 운영 데이터 관리 방법)

  • Han, Kyoung-Soo
    • Journal of Engineering Education Research
    • /
    • v.17 no.5
    • /
    • pp.51-58
    • /
    • 2014
  • This study proposes an effective data management method for easing the burden on self-study report by analyzing operational data on accredited engineering programs. Four analysis criteria are developed: variability, difficulty level of collecting, urgency of analysis, timeliness. After the operational data are analyzed in terms of the analysis criteria, the data which should be managed in time are extracted according to the analysis results. This study proposes a data management method in which tasks of managing the timely-managed data are performed based on the regular academic schedule, so that the result of this study may be used as a working-level reference material.

A Study on the Requirement Verification in the Weapon System R&D (무기체계 연구개발 요구사항 검증에 관한 연구)

  • Kwon, Yong Soo;Kim, Kyoung Jin;Lee, Kyoung Haing
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.1
    • /
    • pp.33-40
    • /
    • 2007
  • The requirement verification is the integral part of the weapon system R&D to reduce cost and schedule. And, a systems engineering is an interdisciplinary engineering management process that evolves and verifies an integrated, life-cycle balanced set of system solutions that satisfy customer needs. Therefore, this study analyzes the national defense need and acquisition management process, investigates the systems engineering verification activity. Through the requirement verification example in terms of technical evaluation this study presented the requirement verification approach in the weapon system R&D.

  • PDF

Evaluation the Relationship SE Capability Level, DICE Level and Schedule Deviation in SW Development (SW공학수준, DICE수준과 SW 개발 프로젝트 납기성과)

  • Kim, Seung-gweon;Lee, Jae-duk
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2012.11a
    • /
    • pp.1441-1444
    • /
    • 2012
  • SW 기업들이 SW 프로세스 개선(Software Process Improvement; SPI)을 개선하기 위해 많은 관심과 노력을 투입해 왔음에도 불구하고, 이런 SW 프로세스 개선 활동이 품질, 비용, 납기준수에 어떠한 영향을 주는지에 대한 구체적인 자료들이 부족한 편이다. 본 연구에서는 SW 프로세스 개선활동들에 대한 이해의 폭을 넓히기 위해 국내 SW 개발 조직의 프로젝트 관리자를 대상으로 SW 프로세스의 공학수준과 DICE 수준관련 자료를 수집하였다. 이를 기반으로 SW 프로세스 개선 모델이 제시하고 있는 가정사항인 SW 프로세스 능력수준이 높으면 프로젝트 성과가 좋은지와 조직변화의 성공요인을 제시하는 DICE 수준에 따라 납기 성과의 변화를 살펴보았다. 분석결과 SW공학수준과 DICE 수준이 높을수록 납기가 줄어드는 것으로 나타났다.

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

The Development and Application of Bus Bunching Indices for Bus Service Improvement (버스서비스 개선을 위한 버스몰림지표 개발 및 적용)

  • Kim, Eun-Kyoung;Rho, Jeong-Hyun;Kim, Young-Chan
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.7 no.6
    • /
    • pp.1-11
    • /
    • 2008
  • As bus is realized by economical, environmental transportation that is available mass transport than car, various policy for improvement of services is achieved. As innovative public transportation systems like BMS (Bus Management System) have established, it is possible to manage bus service efficiently. However, the present bus service management system mainly focuses on enhancing service reliability represented by schedule adherence index. This study discusses the necessity of a special management for bus bunching phenomena at stops, and develops two kinds of bus bunching indices based on the Number of Berth and the Average Bus Arrival Rate. The bus bunching indices were measured by utilizing the bus operational information from BMS at the Seoul TOPIS(Transportation & Information Service). In order to evaluate the sensitivity of the Indices, the indices were applied to two different bus groups: buses on exclusive bus median lane, and regular (shared) lanes. As analysis result, is bunching as is near in downtown and is bunching to peak time morning than the afternoon. Compared with the schedule adherence index, the suggested indices were proved as an efficient complementary indices in the evaluation of the bus operational performance. The results of index comparison between exclusive bus median lane and shared lanes can promote the expansion of exclusive bus median lane. Moreover, it can also be used as a reference in deciding bus station scale including the Number of Berth and the route adjustment plan.

  • PDF

A Study on the Government's R&D Budgeting Evaluation System in Korea (과학기술혁신체제 하에서의 국가연구개발 평가 시스템 개선에 관한 연구 : 연구개발 예산평가 시스템을 중심으로)

  • Bark, Pyeng-Mu;Lee, Ki-Jong
    • Journal of Korea Technology Innovation Society
    • /
    • v.12 no.4
    • /
    • pp.819-839
    • /
    • 2009
  • Proposed increases to the government's R&D budget should be discussed based on merits of meeting efficiency and effectiveness criteria. The evaluation of the national R&D budget and related programs are performed in two areas: a system of R&D budget coordination and allocation, and a system of R&D program performance. This paper mainly focuses on the operational areas of R&D budget evaluation system with a focus on their impact to efficiency and effectiveness. The core view point for a R&D budget evaluation system involves two directions: Firstly, to detail the relationships between the later stage (ex. post) activities such as, program survey, analysis, and program performance evaluation, with the budget evaluation. Secondly, to critically oversee all R&D coordination procedures with a different perspective. Budgeting is generally known as a serial process of policy making, planning and executing. It is highly desirable for the budget to be allocated to, and spent by, specific programs as planned, and that each plan be aligned with a specific policy. As such, a strong relevance between the program structure and budget code system is integral to successful execution. It should be performed using a decision making system which closely examines the link between policy and budget. It is also recommended that systematic relationships be maintained among budget coordination and allocation, performance evaluations of policy and program levels, and program survey and analysis system, and that their operational schedule should be reviewed comprehensively as a one integrated system. The National Science and Technology Council is expected to play a major and practical role as the center of policy planning and should be supported by the objective and unbiased system which covers overall process from policy making to program evaluation. Finally, increased utilization of contents, timely program survey and analysis, and accurate of activity scheduling of budget coordination and allocation, and diligent program performance evaluation all contribute towards a more efficient and effective overall evaluation system.

  • PDF

Development of Evaluation Modules for Evaluating Decommissioning Scenarious Using Digital Mock-Up System (디지털 목업 시스템을 이용한 해체 시나리오 평가용 해체공정 평가모듈 개발)

  • Kim Sung-Kyun;Park Hee-Sung;Lee Kune-Woo;Jung Chong-Hun
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.3
    • /
    • pp.265-273
    • /
    • 2006
  • In the decommissioning and decontamination(D&D) planning stage, it is important that the scenarios are evaluated from an engineering point of views because the decommissioning work has to be executed economically and safely by following the best scenarios. Therefore, we need to develope several modules to evaluate the decommissioning scenarios. In this paper, the digital mock-up system is constructed in the virtual space to simulate the whole decommissioning process. The schedule evaluating equation and cost evaluation equation are derived to calculate the working time and the expected cost. And in order to easily identify the radiation level about the activated objects, the radiation visualization module is developed. Finally, on the basis of the obtained results from the Digital Mock-up and other important factors, the evaluating method of the scenarios that can indicate the best scenario is described.

  • PDF