• Title/Summary/Keyword: Estimated Cost

Search Result 1,865, Processing Time 0.028 seconds

Benefit analysis model of the national map revision program using replacement cost method (대체비용법을 이용한 수치지형도 갱신사업의 편익분석 모형 연구)

  • Son, Hwamin;Yang, Sungchul;Ga, Chillo;Yu, Kiyun;Huh, Yong
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.1
    • /
    • pp.79-87
    • /
    • 2013
  • This study proposed a method to analyze the economic benefit of the national map revision program using the replacement cost method. The replacement cost method measures the benefit of a project as the minimum cost to replace functions of the project with those of alternative goods or services in an existing market. Thus, the demands on 1/5,000 topographic map revision in 18 administrative tasks such as city and district management planning were surveyed in three local autonomous entities. Then the cost to alternatively fulfill the demands was estimated with the standard construction estimating system for the field surveying and surveying results in commercial GIS companies for the site investigation. With this cost estimation model, the benefit of the current national map revision program to the local autonomous entities was estimated as 265,960,999 won. And cost benefit ratios according to several revision frequencies from 0.5 to 4 year were also compared to find the optimal frequency.

An Analysis of Optimal Production Scales by Greenhouse Types using Long-run Average Cost in Controlled Tomato (비닐하우스 토마토의 온실유형에 따른 장기평균비용을 고려한 적정 생산규모 분석)

  • Rhee, Zae-Woong;Hong, Na-Kyoung;Kim, Tae-Kyun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.57 no.5
    • /
    • pp.29-35
    • /
    • 2015
  • The optimal greenhouse scales for controlled tomato should be studied because the increase of oil price and labor costs following the shortage of workforce makes greenhouse cultivation hard to gain profits. The purpose of this study is to estimate optimal production scales by greenhouse types for controlled tomato. The translog cost function is estimated based on the production cost survey data. The results can be summarized as follows: First, the average production cost of controlled tomato per kg decreases as the production scale increases. Second, according to the tomatoes farm of standard farming income data of RDA, the minimum production scale is 23 ton. Third, the estimated output of single-span greenhouse considering production scale with minimum average cost is 345 ton and production cost per kg is 1,476 won. The corresponding figures of multi-span greenhouse are 415 ton and 936 won, respectively. The study results can be used as basic materials for efficient decision making of tomato farmhouses and novice farmers. Also, the study shows that multi-span greenhouse should be encouraged to be built, since it requires lower marginal cost than single greenhouse. The results of this paper will help increase the income of farmhouses and cut expenses for the coming years.

Study of Energy Cost for Performing Flush-out in Newly Constructed Multi-residential Buildings during Winter Season (겨울철 신축 공동주택의 플러쉬아웃 시행 시 난방비용에 관한 연구)

  • Lee, Ki Yong;Kim, Kee Han;Park, Jun-Seok
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.28 no.3
    • /
    • pp.110-114
    • /
    • 2016
  • Newly constructed multi-residential buildings with more than 500 households should be flushed out indoor contaminants using a mechanical ventilation system or large fans after the completion of construction and prior to occupancy by the Heath-friendly Housing Construction Standards since 2014. In addition, the standard recommends to maintain indoor temperature over $16^{\circ}C$ and relative humidity below 60% while performing the flush-out. However, it is difficult to maintain these recommended indoor conditions, especially during winter season because additional energy cost is needed for space heating. Therefore, in this study, additional energy cost including heating and ventilation energy cost in multi-residential household for flush-out during winter season was estimated using building energy simulation program called EnergyPlus. Additional energy cost according to various conditions for performing flush-out (such as performance period, ventilation rate, and heating set-point temperature) was analyzed. Based on the results of the energy simulation, the energy cost was estimated to be ranged from 14,625 to 29,452\/household in Incheon city and from 3,521 to 26,268\/household in Gwangju City. There was no significant change in energy cost according to the performing terms of flush-out between Incheon and Gwangju City.

An Economic Analysis by Applying Extended Crime Prevention Standards for Buildings (건축물 범죄예방 기준 확대적용에 따른 경제성 분석)

  • Hyeon, Tae-Hwan;Cho, Young-Jin
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.11
    • /
    • pp.53-60
    • /
    • 2019
  • Multi-unit house, multi-household house, row house and apartments with less than 500 households were included in the list of anti-crime for buildings following the revision of the "notice of crime prevention building standards" on July 31, 2019. Strengthening the performance of crime prevention buildings is inevitable to increase the cost of building construction, including installation of preventive facilities and use of facilities that have secured performance. Thus an economic analysis on the costs and expected benefits of implementing the standards is required for social consensus. Economic analysis is divided into cost analysis and benefit analysis. This study aims to perform an economic analysis on the installation of crime prevention facilities in the buildings subject to expanded crime prevention obligations. Cost analysis is calculated as the sum of the cost of installation and the price of the crime prevention facilities installed for each target residential building. Benefit analysis is calculated as the social cost of targeted crimes that are expected to decrease due to the installation of crime prevention facilities. Economic analysis shows that the total cost of installing crime prevention facilities in residential buildings is estimated at 107.31 billion won per year, while the total benefit from enhanced crime prevention performance is estimated at 9.38 billion won per year. Considering inflation, benefits are expected to outpace costs in the 28th year since the system was implemented.

Techno-economic Analysis of Power To Gas (P2G) Process for the Development of Optimum Business Model: Part 2 Methane to Electricity Production Pathway

  • Partho Sarothi Roy;Young Don Yoo;Suhyun Kim;Chan Seung Park
    • Clean Technology
    • /
    • v.29 no.1
    • /
    • pp.53-58
    • /
    • 2023
  • This study shows the summary of the economic performance of excess electricity conversion to hydrogen as well as methane and returned conversion to electricity using a fuel cell. The methane production process has been examined in a previous study. Here, this study focuses on the conversion of methane to electricity. As a part of this study, capital expenditure (CAPEX) is estimated under various sized plants (0.3, 3, 9, and 30 MW). The study shows a method for economic optimization of electricity generation using a fuel cell. The CAPEX and operating expenditure (OPEX) as well as the feed cost are used to calculate the discounted cash flow. Then the levelized cost of returned electricity (LCORE) is estimated from the discounted cash flow. This study found the LCORE value was ¢10.2/kWh electricity when a 9 MW electricity generating fuel cell was used. A methane production plant size of 1,500 Nm3/hr, a methane production cost of $11.47/mcf, a storage cost of $1/mcf, and a fuel cell efficiency of 54% were used as a baseline. A sensitivity analysis was performed by varying the storage cost, fuel cell efficiency, and excess electricity cost by ±20%, and fuel cell efficiency was found as the most dominating parameter in terms of the LCORE sensitivity. Therefore, for the best cost-performance, fuel cell manufacturing and efficiency need to be carefully evaluated. This study provides a general guideline for cost performance comparison with LCORE.

Analysis of Luminance Degradation characteristics of OLED using the Hotplate (핫플레이트를 이용한 OLED의 휘도열화특성 분석)

  • Kim, Yun-Cheol;Lee, Duek-Jung;Jang, Joong-Soon
    • Journal of Applied Reliability
    • /
    • v.16 no.4
    • /
    • pp.356-363
    • /
    • 2016
  • Purpose: The purpose of this study is to propose efficiency of equipment testing the luminance degradation of OLED. Methods: The degradation model of Exponential model and Stretched exponential model is analyzed by goodness of fit test using calculated R-square. The degradation model having the higher R-square is finally selected. Scale parameter and Shape parameter using the selected degradation model is estimated. The activation energy and current density n using peck model among the accelerated model is estimated. the estimated parameters are analyzed by t-test. Results: The results of t-test show that the estimated parameters on chamber and hotplate are equal statistically. we can know the similarity of the luminance degradation rate and degradation pattern on chamber and hotplate. Conclusion: The result of the degradation test on chamber and hotplate is similar. when the accelerated degradation test on the panel of the OLED TV is performed, hotplate is requiring less samples, time and cost than chamber. so the accelerated degradation test on the panel of the OLED TV using the hoplate is efficient of time and cost.

A Comparative Study on Assessment of Speed Enforcement by Unmanned Camera and Policeman (기계적 단속 및 인력단속에 의한 과속단속 효과 분석)

  • Gang, Su-Cheol;Kim, Man-Bae;Gang, Dong-Geun;Jang, Sun-Hui
    • Journal of Korean Society of Transportation
    • /
    • v.28 no.6
    • /
    • pp.17-24
    • /
    • 2010
  • As various social problems occur due to increasing traffic accidents, the government has setup and executed strong safety policies. As a result, the number of traffic accidents and the death toll have been decreasing in recent years. However, the setup and execution of the various policies for reducing traffic accidents cost much, so it is necessary to evaluate the cost-effectiveness of each policy. In the present study, enforcement by means of an unmanned over-speed enforcement system, the enforcement effect of which was proven good compared to the cost required for traffic enforcement, is compared with enforcement by policemen. As a result of the comparison, the average speed was 82.66 km/h before the use of unmanned systems and policemen; the average speed with manned enforcement was 70.57 km/h; and the average speed with unmanned systems was 67.85 km/h. The speed limit violation rate was 65% before the use of unmanned systems and policemen; 32% with manned enforcement; and 15% with unmanned systems. Considering the kinds of vehicles, the average speed and violation rate were highest among private cars, then vans, and then trucks.. Considering lanes. The accident rate was estimated based on the above results, and the input cost-to-advantage was estimated. The annual cost-to-advantage was estimated by comparing the above estimated values with the conditions before the unmanned over-speed enforcement system. Subsequently, the enforcement by policemen showed a negative advantage of 76,130,590 won, and the enforcement by the unmanned system showed a positive advantage of 38,577,670 won.

Optimal Capacity and Allocation Distributed Generation by Minimization Operation Cost of Distribution System (배전계통 운영비용의 최소화에 의한 분산전원의 최적 용량과 위치결정)

  • 배인수;박정훈;김진오;김규호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.9
    • /
    • pp.481-486
    • /
    • 2004
  • In operation of distribution system, $DG_s$ Distributed Generations) are installed as an alternative of extension and establishment of substations and transmission and distribution lines according to increasing power demand. In operation planning of $DG_s$, determining optimal capacity and allocation gets economical pro(it and improves power reliability. This paper proposes determining a optimal number, size and allocation of $DG_s$ needed to minimize operation cost of distribution system. Capacity of $DG_s$ (or economical operation of distribution system estimated by the load growth and line capacity during operation planning duration, DG allocations are determined to minimize total cost with power buying cost. operation cost of DG, loss cost and outage cost using GA(Genetic Algorithm).

Preliminary Study on the Construction of Database for BIM-based preliminary estimate. (BIM 기반 개산견적을 위한 DB구축 기초연구)

  • Jun, Kl-Hyun;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.291-292
    • /
    • 2012
  • Progress in the construction project, the estimated cost of the measure is very important. Use preliminary estimate cost data for the prediction of construction cost. But, preliminary estimate cost data a clear calculation, there is no way. it is rely on the historical data and the past construction data. As a result, a significant difference in the actual construction cost and the predicted cost of the problem occurs. In this study, taking advantage of BIM Cost Prediction for efficient and rapid preliminary estimate BIM for building database through the study preliminary estimate cost data.

  • PDF

Prediction of the construction cost indices for construction cost of the public and permanent rental house (국민·영구임대주택 건축비 산정을 위한 공사비지수 예측 연구)

  • Kang, Gou-Ue;Lee, Ung-Kyun;Kim, Chun-Hak;Cho, Hun-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.111-112
    • /
    • 2012
  • Korean government is planning to supply a half million public and permanent rental houses from 2013 to 2018 for settlement of non-homeowners. It is requested an objective criterion to appropriate the budget for the rental houses construction project cost. In this study, construction cost indices, which reflect the inflation trend of construction resources, were explorated to suggest a effective methodology for the construction cost estimation of therental houses. We figured out the future construction cost indices using several scientific methods, and seven estimated indices values were shown. It is required an additional research to select the proper value among the analyzed indices.

  • PDF