• Title/Summary/Keyword: Estimate time

Search Result 5,359, Processing Time 0.034 seconds

NOTE ON LOCAL ESTIMATES FOR WEAK SOLUTION OF BOUNDARY VALUE PROBLEM FOR SECOND ORDER PARABOLIC EQUATION

  • Choi, Jongkeun
    • Bulletin of the Korean Mathematical Society
    • /
    • v.53 no.4
    • /
    • pp.1123-1148
    • /
    • 2016
  • The aim of this note is to provide detailed proofs for local estimates near the boundary for weak solutions of second order parabolic equations in divergence form with time-dependent measurable coefficients subject to Neumann boundary condition. The corresponding parabolic equations with Dirichlet boundary condition are also considered.

A Robotic Medical Palpation using Contact Pressure Distribution (접촉 압력 분포를 이용한 로봇 의료 촉진)

  • Kim, Hyoungkyun;Choi, Seungmoon;Chung, Wan Kyun
    • The Journal of Korea Robotics Society
    • /
    • v.12 no.3
    • /
    • pp.322-331
    • /
    • 2017
  • In this paper we present a novel robotic palpation method for the lump shape estimation using contact pressure distribution. Many previous researches about the robotic palpation have used a stiffness map, which is not suitable to obtain geometrical information of a lump. As a result, they require a large data set and long palpation time to estimate the lump shape. Instead of using the stiffness map, the proposed palpation method uses the difference between the normal force direction and the surface normal to detect the lump boundary and estimate its normal. The palpation trajectory is generated by the normal of the lump boundary to track the lump boundary in real-time. The proposed approach requires small data set and short palpation time for the lump shape estimation since the shape can be directly estimated from the optimally generated palpation trajectory. An experiment result shows that our method can find the lump shape accurately in real-time with small data and short time.

Revisiting Social Discount Rates for Public Investment

  • SONG, JOONHYUK
    • KDI Journal of Economic Policy
    • /
    • v.39 no.2
    • /
    • pp.75-98
    • /
    • 2017
  • This paper aims to estimate the social discount rate (SDR) rather than dig into its theoretical foundation. As SDRs can be derived by investigating both the rate of return on investment and the social time preference rate, we estimate the marginal productivity of both private and public capital and the time preference rate based on the Euler equation. In order to provide a single representative SDR, the weighted averages of the marginal productivity and time preference rate, whose weights are determined by the flow of funds data reflecting the social demand of funds, are presented. Based on the empirical results, we argue that the marginal productivity of private capital stands in the middle of the 3% range while that of public capital varies from 4.5% to 8.6%, with the time preference rate showing a decreasing trend from 3.2% in the early 2000s to 1.2% by around 2030. The single representative SDR or the weighted SDR is estimated to be approximately 3.0~4.5% and expected to continue its downward trend for the foreseeable future.

Methodology for Estimation of Disassembly Time and Evaluation of Disassemblability Considering Recycling (재활용을 고려한 분리시간 산정 및 분리용이성 평가 방법론)

  • Mok, Hak-Soo;Cho, Jong-Rae;Jung, Yoong-Ho;Kang, Young-Hun
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.297-307
    • /
    • 2002
  • Since the pressure for recycling has been increasing, the disassembly, which is pre-process of recycling, has been becoming very important process. The goal of disassembly for recycling is to separate different materials to the greatest extent with least effort. DFD (Design for Disassembly) is a design philosophy for improving product designs for simpler or less costly disassembly operations. This paper proposes a new DFD methodology that can estimate the standard disassembly time and evaluate the disassemblablity of parts. We select some determining and influencing factors related with disassembly process, and estimate the assembly time using motion analysis. By the levels of the determining and influencing factors, the disassemblability is evaluated, and finally, the tables that include the time and score of disassembly are suggested.

Methodology for Estimation of Assembly Time and Evaluation of Asseblability (조립시간 산정과 초립용이성 평가 방법론)

  • Mok, Hak-Soo;Cho, Jong-Rae;Kang, Young-Hun
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.19 no.5
    • /
    • pp.72-80
    • /
    • 2002
  • DFA (Design for assembly) is a design philosophy for improving product designs for simpler or less costly assembly operations. This paper proposes a new DFA methodology that can estimate the standard assembly time and evaluate the assemblablity of parts. We select some determining and influencing factors related with assembly process, and estimate the assembly time using motion analysis. By the levels of the determining and influencing factors, the assemblability is evaluated, and finally, the tables that include the time and score of assembly is suggested.

Analysis of Recurrent Gap Time Data with a Binary Time-Varying Covariate

  • Kim, Yang-Jin
    • Communications for Statistical Applications and Methods
    • /
    • v.21 no.5
    • /
    • pp.387-393
    • /
    • 2014
  • Recurrent gap times are analyzed with diverse methods under several assumptions such as a marginal model or a frailty model. Several resampling techniques have been recently suggested to estimate the covariate effect; however, these approaches can be applied with a time-fixed covariate. According to simulation results, these methods result in biased estimates for a time-varying covariate which is often observed in a longitudinal study. In this paper, we extend a resampling method by incorporating new weights and sampling scheme. Simulation studies are performed to compare the suggested method with previous resampling methods. The proposed method is applied to estimate the effect of an educational program on traffic conviction data where a program participation occurs in the middle of the study.

Electric Current Accelerated Degradation Test Design for OLED TV (OLED TV Panel의 전류가속열화시험 설계)

  • You, Ji-Sun;Lee, Duek-Jung;Oh, Chang-Suk;Jang, Joong Soon
    • Journal of Applied Reliability
    • /
    • v.17 no.1
    • /
    • pp.22-27
    • /
    • 2017
  • Purpose: The purpose of this study is to estimate the life time of OLED TV panel through electric current ADT(Accelerated Degradation Test). Methods: We performed accelerated degradation test for OLED TV Panel at the room temperature to avoid high temperature impact on the luminance. Results: we got more accurately the life time of the OLED TV when we applied ADT without temperature factor than including both current and temperature. Conclusion: Until now, the ADT of the OLED TV has been conducted with temperature and current at the same time for reducing test time and costs. We estimate incorrect life time when the temperature is adopted as an accelerated factor. Due to the high temperature impact on the luminance of the OLED TV panel. So as to solve this problem, we discard temperature and use electric current only.

"A study on the Time-Frequency Algorithm to estimate time-varying Power Spectrum of Heart Rate Variability Signals" (심박변동신호의 시변파워스펙트럼 추정을 위한 Time-Frequency 알고리즘에 관한연구)

  • Park, C.S.;Lee, J.W.;Lee, J.Y.;Kim, J.S.;Lee, M.H.
    • Proceedings of the KOSOMBE Conference
    • /
    • v.1998 no.11
    • /
    • pp.185-186
    • /
    • 1998
  • The discrete Wigner-distribution(DWD) was implemented for the time-frequency analysis of heart rate variability signals. The smoothed cross-DWD was used to estimate time-varying power spectrum. Spurious cross-terms were suppressed using a smoothing data window and a Gauss frequency window. The DWD is very easy to implement using the FFT algorithm. Experiment show that the DWD follows well the instantaneous changes of spectral content of heart rate variability signals, which characterize the dynamics of autonomic nervous system response.

  • PDF

Comparison and analysis of peak flow by Areal Reduction Factor (면적감소계수에 따른 첨두유량의 비교연구)

  • Baek, Hyo-Sun;Lee, De-Young;Kang, Young-Buk;Choi, Han-Kuy
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1798-1802
    • /
    • 2007
  • The practice of business estimate flood discharge by rainfall-flow relation that is easy collection of observation data. The important factor is rainfall, coefficient of runoff, and drainage area for analysis of runoff-flow relation.The practice of business usually use probability rainfall that use a weighted average value after each observation post estimate probability of non-same time. It has more error than same time probability rainfall, and it can excess of estimation because it can't consider space distribution of rainfall.The study of result showed similar aspect with existing ARF but width of coefficient become smaller. And the comparison of peak flow did not different what used by ARF and same time probability rainfall(A group). But non-same time probability rainfall is bigger 25% more than another(B group). Between A group and B group of the difference increased with the lapse of time.

  • PDF

Comparison and analysis of peak flow by Areal Reduction Factor (면적감소계수에 따른 첨두유량의 비교 분석)

  • Lee, Dae-Young;Choi, Han-Kuy
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.95-102
    • /
    • 2007
  • The practice of business estimate flood discharge by rainfall-flow relation that is easy collection of observation data. The important factor is rainfall, coefficient of runoff, and drainage area for analysis of runoff-flow relation. The practice of business usually use probability rainfall that use a weighted average value after each observation post estimate probability of non-same time. It has more error than same time probability rainfall, and it can excess of estimation because it can't consider space distribution of rainfall. The study of result showed similar aspect with existing ARF but width of coefficient become smaller. And the comparison of peak flow did not different what used by ARF and same time probability rainfall(A group). But non-same time probability rainfall is bigger 25% more than another(B group). Between A group and B group of the difference increased with the lapse of time.

  • PDF