• 제목/요약/키워드: Establishment risk

검색결과 509건 처리시간 0.025초

A Qualitative Study on Risk Reduction Behaviors in Purchase Process of the Counterfeit of Fashion Luxury Brands - Focused on Risk Reduction Behaviors on Psychological Risk Perceptions -

  • Kim, Il
    • 패션비즈니스
    • /
    • 제9권3호
    • /
    • pp.22-36
    • /
    • 2005
  • This research is to classify psychological risk perceptions in purchases process at counterfeit at fashion luxury brands, into a risk perception on purchase activity itself and a risk perception on the post-purchase situation, and to analyze types and characteristics at risk reduction behaviors to reduce each risk perception. In this research a qualitative method was employed, and research-related data were collected and analyzed through in-depth interviews. Results were shown that risk reduction behaviors at psychological risk perception on purchase activity itself included rationalization of purchase, accompanied purchase, reduction and discontinuance of purchase, and that risk reduction behaviors of psychological risk perception on the post-purchase situation included information search, establishment of selection criteria, establishment of marginal limit, selective purchase, planned and compared purchase, and reduction and discontinuance of purchase. Previous researches suggested brand loyalty, selection of famous brands, utilization of information agents by marketers, pre-purchase usage and guaranteed purchase, but these risk reduction methods were not utilized, this probably being interpreted as a result of characteristics of counterfeit. In addition, risk reduction behavior of one type tended to reduce risk perception of several other types, and risk reduction behaviors of various types were utilized to reduce a certain type's risk perception. Not only types of risk perception but also levels of risk perception appeared to have exerted influence to risk reduction behaviors.

재해경감활동계획 수립에 위험 시나리오 도출을 위한 STPA기법 도입 (Introduction of the STPA Mechanism to Derivation of Risk Scenarios for Establishment of Disaster Reduction Activity Plans)

  • 김상덕;이석형;김창수
    • 한국재난정보학회 논문집
    • /
    • 제16권4호
    • /
    • pp.784-795
    • /
    • 2020
  • 연구목적: 본 연구는 기업재난관리표준에 규정하고 있는 위험평가 절차에 대하여 연구하고자 한다. 연구방법: 기업재난관리표준에 정하고 있는 위험평가 단계별 요구사항을 파악하고, 'A'기관과 협력사의 적용사례를 검토하였으며 요구사항에 맞는 위험평가 절차를 도출하였다. 연구결과:기업재난관리표준의 요구사항인 위험 시나리오 도출 방법과 절차에 대하여 명확히 정의하고, 위험 시나리오 도출을 위한 표준화된 절차 도입이 필요한 것으로 검토되었다. 결론:발전 연료수급업무에 대하여 시스템 이론에 기반한 STPA 기법을 적용하여 위험 시나리오를 도출하는 방법을 구현하였으며, 모든분야의 핵심업무에 대한 위험 시나리오 도출에 적용할 수 있도록, STPA 기법을 재해경감활동계획 수립을 위한 위험 시나리오 도출 기법으로 기업재난관리표준에 반영할 것을 제시하였다.

건설현장의 위험성평가 효율적 활용을 위한 운영 시스템 구축사례 분석 - H 건설사 사례중심으로 (Analysis of Operation System Establishment Cases for Efficient use of Risk Assessment at Construction Sites - H Focusing on Construction Company Cases)

  • 이재붕
    • 한국재난정보학회 논문집
    • /
    • 제18권4호
    • /
    • pp.828-838
    • /
    • 2022
  • 연구목적: 위험성평가의 전산시스템 구축을 통해 건설현장에서 위험성평가 대상 공종 근로자가 쉽게 작성할 수 있고 효율적 위험성평가 활동으로 재해 저감을 기대할 수 있는지의 사례 분석을 목적으로 한다. 연구방법: 작업공종 분류만으로 해당작업의 위험요인과 안전대책을 제공받아 위험추정과 대책수립을 할 수 있으며, 해당작업의 재해사례 제시로 실질적 재해예방 활동이 가능하도록 시스템을 구축하였다. 연구결과: H건설사의 ERP내 위험성평가 전산시스템 구축 이후 현장적용에 따른 년간 환산재해율 변화분석을 통해 국내 건설업의 환산재해율이 증가하는 반면 H건설사의 환산재해율은 감소하였음을 확인하였다. 결론: 위험성평가 전산시스템화를 통해 현장작업 대상 근로자가 위험성평가에 쉽게 접근할 수 있고 해당공정의 위험요인 평가 및 위험예방 대책의 수립이 가능하게 되어, 평가 기간 동안 실제 재해율 감소에 영향이 있는 것으로 분석되었다.

가스플랜트 사업단에서 연구관리스템 구축 (The establishment of R&D management system for Gas Plant R&D Center)

  • 황성하;유선일;남태완
    • 시스템엔지니어링학술지
    • /
    • 제4권1호
    • /
    • pp.19-29
    • /
    • 2008
  • Traditionally gas plant R&D has had a world-wide weak position in terms of high technology. Especially System engineering did not exactly apply to gas plant construction. So, Gas Plant R&D Center is determined to make the establishment of the system engineering for the standard of gas plant. Gas Plant R&D Center has two projects. Firstly, the establishment of the R&D management system. Secondly, the system engineering which is included in the VE concept of EPC parts. But Gas Plant R&D Center exists in the particular conditions for successful development of the new process and core equipments. Now we will describe the establishment of R&D management system and particular conditions(Risk Conditions) for gas plant.

  • PDF

소규모 저수지 대상 비상대처계획 수립 선정기준 연구 (Study on Selection Criteria of Small-Scales Reservoirs for Emergency Action Plan(EAP) Establishment)

  • 박기찬;최경숙
    • 한국농공학회논문집
    • /
    • 제61권3호
    • /
    • pp.101-112
    • /
    • 2019
  • This study developed selection criteria of small-scales reservoirs, having under $300,000m^3$ storage capacity, for the Emergency Action Plan(EAP) establishment in order to reduce the disaster risks of the reservoir's failures. Those reservoirs are out of ranges of Korean EAP establishment standard, but have potential risk of disasters as they have often failed by the recent extreme rainfall events and earthquakes, causing economical and life losses. The problem of reservoir aging is also one of the reasons of them. In this study, the developed selection criteria of small reservoirs for EAP establishment are storage capacity, embankment height, reservoir age, heavy rain factor and earthquake factor. These criteria were selected based on the review of the existing EAP establishment guidelines, analysis of the past dam failure cases, and the previous related studies. The quantification of these criteria were conducted for the practical applications in the fields, and applied to 67 previous failures in order to investigate the relation of each criteria with these failures. The earthquake factor found to be the highest relations followed by heavy rain factors, combination of earthquake and heavy rain factors, and reservoir age. The classification was made as observation and review groups for EAP establishments based on overlapping numbers of each criteria. This classifications applied to 354 reservoirs designated as having the potential disaster risk by MOIS, and showed 38.4% of observation and 11.9% of review groups. Anticipatory monitoring and regular inspection should be made by professional facility managers for the observation group, and necessity of EAP establishment should be assessed for the review group based on the downstream status and financial budget.

환경경영시스템에서의 위험평가 모델 (An Alternative Risk Assessment Model in EMS)

  • 김종걸;김창수
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2004년도 춘계학술대회
    • /
    • pp.271-276
    • /
    • 2004
  • The risk assessment model is an important subsystem for effective establishment and operation of EMS (environment management system). In case of poor risk assessment long-term and large-scale failure expense might be brought. Managing policy, target and other indices based on risk assessment can guarantee successful EMS. In this paper, we aim at comparative analysis of various risk methods and propose an alternative risk assessment model for EMS.

  • PDF

건설 분야 리스크 경영 시스템 구축 (On the Risk Management System in Construction Industries)

  • 김종걸;박용수
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2004년도 춘계학술대회
    • /
    • pp.277-281
    • /
    • 2004
  • The establishment and application of risk management system is one of the current issues in world-wide leading companies. Poor risk management might bring large-scale accident in construction industry by its features(large scale, diversity). Standardization system and standard for risk should be managed timely. In this paper, we do comparative analysis of standardization systems and standards concerned on risk, so thus present basic data for safety reinforcement and risk zero in the construction life cycle process.

  • PDF

노인요양시설의 위험관리시스템 구축활동에서 액션 플랜의 수립과 실행에 따른 성과와 시사점 (Outcome and Implication of Establishment and Practice of Action Plan for the Elderly Care Facility in Establishing Risk Management System)

  • 윤기혁;박경일;권진아
    • 한국콘텐츠학회논문지
    • /
    • 제16권11호
    • /
    • pp.308-320
    • /
    • 2016
  • 본 연구의 목적은 노인요양시설에서 위험의 예방과 대응을 위해 구축한 위험관리시스템의 실제 수행 활동인 액션 플랜의 실행 과정과 성과를 제시하는 경험적 사례 연구이다. 이를 위해 국내 최초로 위험 예방 및 대응을 위해 위험관리시스템을 구축하여 수행 활동을 해온 A노인요양시설이 2년간 실시(2014년~2015년)한 액션 플랜 실행 과정과 성과를 분석하였다. 본 연구의 결과 첫째 위험관리시스템 액션 플랜은 위험관리시스템 구축 4단계 과정 중 세 번째 단계인 위험 예방 및 대응처리 방법의 선택과 수행 단계에서 수립이 되었다. 둘째 위험관리시스템 액션 플랜 실행에 따른 성과로서 2년간(2014년~2015년)의 위험의 변화를 조사를 파악한 결과 2014년에 비해 2015년에 위험이 28% 감소하여 액션 플랜에 수행에 따른 위험관리 활동이 효과가 있는 것으로 나타났다. 이러한 결과를 바탕으로 노인요양시설에서 효과적인 액션 플랜 수립과 실행을 위해 액션 플랜은 독자적으로 수립되는 것이 아니라 비전과 전략을 바탕으로 전략, 성취목표와 성취과제 등이 잘 연계될 수 있도록 체계적인 추진일정을 수립해야 하고, 책임소재를 분명히 해야 하며, 간트 도표 등의 기법을 활용하여 실행되어야 할 모든 내용들이 한눈에 쉽게 알아 볼 수 있도록 도식화하여 구체적으로 작성하는 것이 중요하다.

우리나라 청소년 건강위험행위 실태조사의 문제점과 개선방안 (Problems and Improvements in Surveys on Health Risk Behaviors among Adolescents in Korea)

  • 박은옥;현미열
    • 한국학교보건학회지
    • /
    • 제18권1호
    • /
    • pp.59-69
    • /
    • 2005
  • Purpose : This study was done for reviewing problems in surveys on youth health risk behaviors in Korea and for looking for strategies to improve surveys of youth health risk behaviors through literature review. Method : This study reviewed foreign and domestic literatures. Results : The main problems were as follows; 1) lack of health risk behavior surveys focused on health behaviors, 2) differences in health risk behaviors surveyed, 3) inconsistency in the measurement on health risk behaviors, 4) lack of representativeness of the sample, using convenient sampling. Conclusions: Several suggestions were made for the future research, including establishment of systems for youth health risk behavior survey nationwide, introduction of internet survey, maintenance of consistency in health risk behaviors surveyed, investigation of relating factors relevant to health risk behaviors, and uses of survey results.

고속도로 건설공사 발주자의 안전점검 체계구축 절차에 관한 이해관계자 설문조사 및 분석 (Survey and Analysis of Stakeholder Opinions on the Establishment Procedure of Safety Inspection System for Highway Construction Clients)

  • 박응호;이수동;정기효
    • 대한안전경영과학회지
    • /
    • 제25권4호
    • /
    • pp.57-65
    • /
    • 2023
  • The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.