Feasibility Analysis for Introduction of Scaffolding with Advanced Guardrail System to Prevent Falls (비계작업의 추락재해예방을 위한 선행 안전난간 공법의 도입 타당성 분석)

  • Park, J.D.;Moon, S.O.;Lee, H.S.;Jeong, S.C.;Kwon, Y.J.;Jung, K.
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.23-31
    • /
    • 2020
  • In the construction sector, there were 99 fatalities from falls associated with steel tube and system scaffolds for three years from 2016 to 2018 and out of which 27.3 percent (27 workers) were found to have occurred during installing and dismantling procedure. To erect scaffolding which is installed for the work at height, the work platforms are generally installed first and the safety guardrails are installed and vice versa to dismantle. As a result, workers are exposed to the risk of falling because they erect and dismantle scaffolding without guardrails. To minimize the risk of falling, it is necessary to study a new construction method that can erect or dismantle scaffolding while guardrails are installed (called advanced guardrail system). This study analyzed advanced guardrail system in terms of safety regulation, workability and economic efficiency by investigating the domestic situation on the use of scaffolding, reviewing domestic and foreign standards for guardrails and conducting economic feasibility study. The results of this study is expected to greatly contribute to preventing falls in scaffolding installation and dismantlement procedure. As a follow-up study, empirical research is required including physical test of scaffolding with advanced guardrail system and effectiveness analysis after trial applications.

Object Detection and Post-processing of LNGC CCS Scaffolding System using 3D Point Cloud Based on Deep Learning (딥러닝 기반 LNGC 화물창 스캐닝 점군 데이터의 비계 시스템 객체 탐지 및 후처리)

  • Lee, Dong-Kun;Ji, Seung-Hwan;Park, Bon-Yeong
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.58 no.5
    • /
    • pp.303-313
    • /
    • 2021
  • Recently, quality control of the Liquefied Natural Gas Carrier (LNGC) cargo hold and block-erection interference areas using 3D scanners have been performed, focusing on large shipyards and the international association of classification societies. In this study, as a part of the research on LNGC cargo hold quality management advancement, a study on deep-learning-based scaffolding system 3D point cloud object detection and post-processing were conducted using a LNGC cargo hold 3D point cloud. The scaffolding system point cloud object detection is based on the PointNet deep learning architecture that detects objects using point clouds, achieving 70% prediction accuracy. In addition, the possibility of improving the accuracy of object detection through parameter adjustment is confirmed, and the standard of Intersection over Union (IoU), an index for determining whether the object is the same, is achieved. To avoid the manual post-processing work, the object detection architecture allows automatic task performance and can achieve stable prediction accuracy through supplementation and improvement of learning data. In the future, an improved study will be conducted on not only the flat surface of the LNGC cargo hold but also complex systems such as curved surfaces, and the results are expected to be applicable in process progress automation rate monitoring and ship quality control.

Establishing Methodology for Simulation-based Ship Design and Construction Using Virtual Manufacturing Technologies (가상생산기술을 이용한 시뮬레이션 기반의 선박설계 및 생산체계의 수립)

  • Kim, Hong-Tae;Lee, Jong-Gap;Hwang, Kyu-Ok;Jang, Dong-Sik
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.230-240
    • /
    • 2002
  • Information technologies centered on the internet in the area of shipbuilding and marine engineering further incur the needs to increase the flexibility of the organization, the dispersion of work process, and the use of out sourcing, as well as the globalization of related market. In near future, electronic commerce and concurrent engineering based on CALS/EC and the Internet will be an integral part of the environment and upon these changes, ship design and construction will become a computer supported cooperative work of many dispersed and specialized groups. As the means of active response to these environmental changes, many new concepts such as digital shipbuilding, virtual shipyard, and simulation based design are appearing. In this paper, the concept and current status of digital manufacturing in general manufacturing industry will be reviewed. Then, related technologies, area of application and methods of digital manufacturing in shipbuilding and marine industries are presented. In addition, virtual assembly simulation system for shipbuilding(VASSS), a tool for crane operability and block erection simulation in virtual dock based on 3D product model, will be introduced.

A Study on Zoning Model Using Web-Cyclone (웹사이클론을 이용한 조닝모듈 개발에 관한 연구)

  • Gwak, Han-Seong;Son, Chang-Back;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.115-117
    • /
    • 2012
  • Task based modeling is essential in a construction operation simulation modeling. It allows dealing with local variables or delay factors that affect productivity and improves the reusability of existing operation models. An operation model can secure reality only if it reflects the real construction processes by effectively dealing with zoning issue. However, system users have some difficulties in modeling a construction operation that is consisted of several processes having different production units. Zoning is a major modeling issue when the task based modeling method is implemented using the existing discrete event simulation systems. This paper highlights the difficulty and presents a new method that complements the zoning issues attributed to different production units. The method is described in detail by presenting the flow of entities. It is confirmed that the zoning method effectively deals with the unbalance of production units between processes and facilitates to model an operation model having processes with different production units. The "Zoning module" contributes to increasing accuracy of simulation result.

  • PDF

조선 중일정계획시스템을 위한 공정계획 객체 설계에 관한연구

  • 최해주;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.290-293
    • /
    • 2001
  • The mid-schedule planning of the ship is making a schedule about the process from cutting to erection. The ship consists of lots of blocks. This block has different process because of the shape of the block varies in accordance with the ship-type and the part position of the ship. The type and order of each block process initially must be generated for the mid-schedule planning. In this paper, the process planning, described as above is preparing the basic information before scheduler make a plan with the prepared manhour. The scheduling is done with this process planning which includes the information of the process order. This paper shows the research about three methods to design the process planning. First, investigate the expression method about information of the process planning for the mid-schedule planning in real workplace. Second, design the object of the process planning on the basis of investigating the expression method. Finally, develop the prototype of object on the basis of this designed process planning and then find the practical use in the mid-schedule planning. The object, which is developed in this paper, contains the main algorithm. In case of developing The Mid-Schedule Planning System, this object is expected to be utilized very easily as consisting another object.

  • PDF

An Assembly Simulation of a Plane Block with Gravity and Welding Deformations (자중과 용접변형을 고려한 평블록 조립 시뮬레이션)

  • Jae-Gyou Roh;Jong-Gye Shin
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.36 no.3
    • /
    • pp.122-133
    • /
    • 1999
  • Overlap, excessive wide gaps, and errors between blocks during erection process increases cost and man-hour. In this paper, a system to simulate the assembly process is suggested and a plane block assembly of welding deformation with gravity is simulated in consideration of assembly order, deformations and errors occurring in the cutting and forming processes are not considered and welding deformations are acquired by equivalent stiffness and load method from experiments and hull double bottom plane block is assembled on a assembly order by panel method. It is certified that according to the order of assembly, intermediate product shape affects rigidity which affects welding deformations. Assembly order must be considered in the assembly process. It is certified that the gravity has important role in the assembly process.

  • PDF

Methods for the Modularization of Simulation Model and the Management Scheme of Simulation Scenario for Shipbuilding Process Planning (조선 공정 계획을 위한 시뮬레이션 모델의 모듈화 및 시나리오 처리 방법론)

  • Cha, Ju-Hwan;Ku, Nam-Kug;Roh, Myung-Il;Cho, Doo-Yeoun;Lee, Kyu-Yeul
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.1
    • /
    • pp.17-25
    • /
    • 2012
  • Recently, requests for accurate process planning using simulation have been increasing in many engineering fields including the shipbuilding industry, and many application systems for simulation have been developed. It is difficult, however, for a user to reuse the developed systems, because simulation models in the system are defined by its own method. In addition, the simulation model should be modified whenever a simulation sequence, which is called simulation scenario, is changed. Therefore, in this study, an elementary simulation object is proposed to modularize a simulation model. And the management scheme of simulation scenario is proposed to manage the scenario outside of the simulation models. Also, a simulation template is proposed to increase the development efficiency. To verify the efficiency of the proposed methods, application examples for shipbuilding process planning are implemented.

Frequency variation in construction stages and model validation for steel buildings

  • Aras, Fuat
    • Steel and Composite Structures
    • /
    • v.22 no.3
    • /
    • pp.647-662
    • /
    • 2016
  • This study aims to monitor the variation of modal frequencies of steel buildings during their construction sequence. In this respect, construction of a steel building is followed by vibration based measurements. The monitored building is a three-story educational building within a building group whose structural system consists of steel moment resisting steel frames and eccentric braces. Five different acceleration measurements in two perpendicular directions are taken on five different construction stages, starting from the erection of the columns and beams ending with the completion of the construction. The recorded measurements are transferred into frequency domain and the dominant frequencies for each case have been determined. The change in the dominant frequencies is evaluated with the existing construction stages and performed constructional works between the stages. The last measurement, performed on the building in service, revealed the first two dominant frequencies as mutual in X and Y direction, showing that these dynamic modes are torsional modes. This result is investigated by numerical analysis performed with finite element model of the building constructed for design purpose. Lower frequencies and different mode shapes are determined from numerical analysis. The reason of lower frequencies is discussed and the vibration survey is extended to determine the effects of an adjacent building. The results showed that the building is in strong relation with an adjoining building in spite of a designed construction joint.

Introducing a new all steel accordion force limiting device for space structures

  • Poursharifi, Maryam;Abedi, Karim;Chenaghlou, Mohammadreza;Fleischman, Robert B.
    • Structural Engineering and Mechanics
    • /
    • v.74 no.1
    • /
    • pp.69-82
    • /
    • 2020
  • A significant defect of space structures is the progressive collapse issue which may restrict their applicability. Force limiting devices (FLDs) have been designed to overcome this deficiency, though they don't operate efficiently in controlling the force displacement characteristics. To overcome this flaw, a new type of FLD is introduced in the present study. The "all steel accordion force limiting device" (AFLD) which consists of three main parts including cylindrical accordion solid core, tubular encasing and joint system is constructed and its behavior has been studied experimentally. To improve AFLD's behavior, Finite element analysis has been carried out by developing models in ABAQUS software. A comprehensive parametric study is done by considering the effective design parameters such as core material, accordion wave length and accordion inner diameter. From the results, it is found that AFLD can obtain a perfect control on the force-displacement characteristics as well as attaining the elastic-perfect plastic behavior. Obtaining higher levels of ultimate load carrying capacity, dissipated energy and ductility ratio can be encountered as the main privileges of this device. Ease of construction and erection are found to be further advantages of AFLD. Based on the obtained results, a procedure for predicting AFLD's behavior is offered.

Driving Burj Dubai Core Walls with an Advanced Data Fusion System.

  • Cranenbroeck, Joel Van;Hayes, Douglas McL;Sparks, Ian R
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.465-469
    • /
    • 2006
  • In recent years there has been considerable interest in the construction of super high-rise buildings. From the prior art, various procedures and devices for surveys during and after the phase of erection of a high-rise building are known. High-rise buildings are subject to strong external tilt effects caused, for instance, by wind pressures, unilateral thermal effects by exposure to sunlight, and unilateral loads. Such effects are a particular challenge in the phase of construction of a high-rise building, in as much as the high-rise building under construction is also subject to tilt effects, and will at least temporarily lose its - as a rule exactly vertical - alignment. Yet construction should progress in such a way that the building is aligned as planned, and particularly so in the vertical, when returning into an un-tilted basic state.It is essential that a straight element be constructed that theoretically, even when moving around its design centre point due to varying loads, would have an exactly vertical alignment when all biasing conditions are neutralised. Because of differential raft settlement, differential concrete shortening, and construction tolerances, this ideal situation will rarely be achieved. This paper describes a procedure developed by the authors using GPS observations combined with a network of precision inclination sensor to provide reliable coordinated points at the top of the worldwide highest-rise building under construction in Dubai.